← Back
Three families
265 COVERT STREET
BROOKLYN · BIN 3079087
💬 Discuss this project
1899Year Built
3Stories
C0Building Class
R6Zoning
3,300 sfGross Floor Area
3Units
Rent Stabilized14 Open Violations 13 unresolved · 1 paperwork only ▸FDNY Report ↗
Three families · Owner of record: 265 COVERT ST LLC · 2,000 sf lot · 1.65 FAR built · Flood zone X
Locations of Work
ArchitectureMechanicalPlumbingGeneral
Permit Issued — active, not yet Signed-off
Roof1p · 1 filing · 19 docs
Floor 3Under Construction5p · 3 filings · 20 docs
Floor 2Under Construction5p · 2 filings · 20 docs
Floor 1Under Construction5p · 2 filings · 20 docs
CellarUnder Construction5p · 2 filings · 20 docs
Basement1p · 1 filing · 19 docs
1 job · most recent 07/18/2025
Air Conditioning Systems Heating Systems
FiledStatusContractorScopeMake / Model / Capacity
07/18/2025Permit IssuedJ S REMODELING NY INCAir Conditioning Systems, Heating Systems
Cooling
Gree MUL42HP230V1R32AO 42,000 BTU · Condensing Unit ×3
Heating
A.O. Smith PNT-50 40,000 BTU · Water Heater ×3
Gree MUL42HP230V1R32AO 42,000 BTU · Condensing Unit ×3
1 job · most recent 06/25/2025
General Wiring
FiledStatusContractorScope
06/25/2025Permit IssuedTITANIUM ELECTRICAL CORPGeneral Wiring
Building Lifecycle
All (115)Filed (6)Permit Issued (4)Signed Off (1)Violation (60)Inspection (6)Objection (8)Special Inspection (30)
07/07/2026
Violation issued (HPD, open)
C
05/04/2026
Violation issued (HPD, closed)
A
11/18/2025
Violation issued (HPD, closed)
I
07/29/2025
Signed off — Alteration
PROVIDE NEW PLUMBING SYSTEM THROUGHOUT EXISTING (3) THREE STORY, (3) THREE-FAMILY BUILDING (WITH CELLAR), IN CONJUNCTION WITH GC JOB# B01193305-I1
B01195657-I1
07/28/2025
Permit issued — Mechanical Systems
B01252958-I1-MS
07/28/2025
Inspection — Pass-Final General Construction Non-Directive 14
Pass
View inspection ↗
07/18/2025
Filed — Alteration
PROVIDE NEW MECHANICAL SYSTEM THROUGHOUT EXISTING (3) THREE STORY, (3)THREE FAMILY BUILDING WITH CELLAR IN CONJUNCTION WITH ALT 1 JOB#B01193305
B01252958-I1
07/09/2025
Filed — Alteration
INTERIOR RENOVATION IN EXISTING (3) THREE STORY, (3) THREE 3 FAMILY BUILDING WITH CELLAR. NO CHANGE IN USE, MEANS OF EGRESS, OR OCCUPANCY
B01193305-P2
07/09/2025
Special inspection requirement — Heating Systems
JICHEN SUN
07/09/2025
Special inspection requirement — HVAC-R and service water heating equipment
JICHEN SUN
07/09/2025
Special inspection requirement — HVAC-R and service water piping design and insulation
JICHEN SUN
07/09/2025
Special inspection requirement — HVAC-R and service water heating system controls
JICHEN SUN
07/09/2025
Special inspection requirement — Energy Code Compliance Inspections
JICHEN SUN
07/08/2025
Special inspection requirement — Metering
JICHEN SUN
07/08/2025
Special inspection requirement — Fire-Resistant Penetrations and Joints
JICHEN SUN
07/08/2025
Special inspection requirement — Structural Stability – Alterations of existing buildings
ROBERT SIQECA
07/08/2025
Special inspection requirement — Energy Code Compliance Inspections
JICHEN SUN
07/08/2025
Special inspection requirement — Fire-Resistance Rated Construction
JICHEN SUN
07/08/2025
Special inspection requirement — Air barrier - visual inspection
JICHEN SUN
07/08/2025
Special inspection requirement — Fenestration areas
JICHEN SUN
07/08/2025
Special inspection requirement — Interior lighting power
JICHEN SUN
07/08/2025
Special inspection requirement — Maintenance information
JICHEN SUN
07/08/2025
Special inspection requirement — Fenestration and door U-factor and product ratings
JICHEN SUN
07/08/2025
Special inspection requirement — Fenestration air leakage
JICHEN SUN
07/08/2025
Special inspection requirement — Insulation placement and R values
JICHEN SUN
07/08/2025
Special inspection requirement — Mechanical Systems
JICHEN SUN
07/08/2025
Special inspection requirement — Final
PETER CHO
07/03/2025
Inspection — Fail-Final General Construction Non-Directive 14
Fail
View inspection ↗
06/27/2025
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Underground
Certified
View inspection ↗
06/18/2025
Objection resolved — Addressed
06/12/2025
Inspection — Certified Remove/Cap - work done in accordance with code
Certified
View inspection ↗
06/12/2025
Inspection — Certified Water and Sanitary-WS-Fixtures-Finish
Certified
View inspection ↗
06/09/2025
Violation issued (HPD, closed)
A
06/04/2025
Objection resolved — Addressed
05/30/2025
Objection raised — Structural
05/30/2025
Objection raised — Structural
05/23/2025
Special inspection requirement — HVAC-R and service water heating equipment
JICHEN SUN
05/23/2025
Special inspection requirement — HVAC-R and service water piping design and insulation
JICHEN SUN
05/23/2025
Special inspection requirement — HVAC-R and service water heating system controls
JICHEN SUN
05/23/2025
Special inspection requirement — Energy Code Compliance Inspections
JICHEN SUN
05/22/2025
Filed — Alteration
INTERIOR RENOVATION IN EXISTING (3) THREE STORY, (3) THREE 3 FAMILY BUILDING WITH CELLAR. NO CHANGE IN USE, MEANS OF EGRESS, OR OCCUPANCY
B01193305-P1
05/22/2025
Filed — Alteration
PROVIDE NEW PLUMBING SYSTEM THROUGHOUT EXISTING (3) THREE STORY, (3) THREE-FAMILY BUILDING (WITH CELLAR), IN CONJUNCTION WITH GC JOB# B01193305-I1
B01195657-P1
05/19/2025
Permit issued — General Construction
B01193305-I1-GC
05/15/2025
Special inspection requirement — Fire-Resistance Rated Construction
JICHEN SUN
05/15/2025
Special inspection requirement — Energy Code Compliance Inspections
JICHEN SUN
05/15/2025
Special inspection requirement — HVAC-R and service water piping design and insulation
JICHEN SUN
05/15/2025
Special inspection requirement — Interior lighting power
JICHEN SUN
05/15/2025
Special inspection requirement — Air barrier - visual inspection
JICHEN SUN
05/15/2025
Special inspection requirement — Fenestration air leakage
JICHEN SUN
05/15/2025
Special inspection requirement — Metering
JICHEN SUN
05/02/2025
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Roughing
Certified
View inspection ↗
04/02/2025
Permit issued — Plumbing
B01195657-I1-PL
03/24/2025
Permit issued — General Construction
B01193305-I1-GC
03/20/2025
Filed — Alteration
PROVIDE NEW PLUMBING SYSTEM THROUGHOUT EXISTING (3) THREE STORY, (3) THREE-FAMILY BUILDING (WITH CELLAR), IN CONJUNCTION WITH GC JOB# B01193305-I1
B01195657-I1
03/18/2025
Objection resolved — Addressed
03/18/2025
Objection resolved — Addressed
03/14/2025
Objection raised — Zoning
03/14/2025
Objection raised — Admin
03/13/2025
Filed — Alteration
INTERIOR RENOVATION IN EXISTING (3) THREE STORY, (3) THREE 3 FAMILY BUILDING WITH CELLAR. NO CHANGE IN USE, MEANS OF EGRESS, OR OCCUPANCY
B01193305-I1
11/26/2024
Violation issued (HPD, closed)
I
Latest 60 of 115 events.
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
265 COVERT ST LLC103/22/2026
▾Sales History (ACRIS)
DatePriceUnitSeller → Buyer$/sf
03/06/2025$1.2M—— → —$379/sf building
03/25/2024$1.1M—Private party → 265 COVERT GOLE LLC$339/sf building
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
PRIME ZONE BUILDING CONSULTING607/18/2025
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
L&C ASSOCIATES603/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
J S REMODELING NY INCGeneral Contractor507/08/2026
A&H EXPRESS PLBG&HTG CORPPlumbing107/08/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
PRIME ZONE BUILDING CONSU9474407/18/2025
STRUCTURAL ENGINEERING &5699307/09/2025
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWMechanical SystemsPermit IssuedJ S REMODELING NY INC07/28/2025
DOB NOWGeneral ConstructionSigned-offJ S REMODELING NY INC05/19/2025
DOB NOWPlumbingSigned-offA&H EXPRESS PLBG&HTG CORP04/02/2025
DOB NOWGeneral ConstructionSigned-offJ S REMODELING NY INC03/24/2025
▾Field Inspections (DOB CAP) — 6
DateTypeResultReport
07/28/2025Pass-Final General Construction Non-Directive 14PassView ↗
07/03/2025Fail-Final General Construction Non-Directive 14FailView ↗
06/27/2025Certified Water and Sanitary-WS-Sanitary Piping-UndergroundCertifiedView ↗
06/12/2025Certified Remove/Cap - work done in accordance with codeCertifiedView ↗
06/12/2025Certified Water and Sanitary-WS-Fixtures-FinishCertifiedView ↗
05/02/2025Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
▾Special Inspection Requirements (DOB NOW) — 39
DateRequirementInspectorRole
07/09/2025Heating SystemsJICHEN SUNspecial
07/09/2025HVAC-R and service water heating equipmentJICHEN SUNenergy_progress
07/09/2025HVAC-R and service water piping design and insulationJICHEN SUNenergy_progress
07/09/2025HVAC-R and service water heating system controlsJICHEN SUNenergy_progress
07/09/2025Energy Code Compliance InspectionsJICHEN SUNprogress
07/08/2025MeteringJICHEN SUNenergy_progress
07/08/2025Fire-Resistant Penetrations and JointsJICHEN SUNspecial
07/08/2025Structural Stability – Alterations of existing buildingsROBERT SIQECAspecial
07/08/2025Energy Code Compliance InspectionsJICHEN SUNprogress
07/08/2025Fire-Resistance Rated ConstructionJICHEN SUNprogress
07/08/2025Air barrier - visual inspectionJICHEN SUNenergy_progress
07/08/2025Fenestration areasJICHEN SUNenergy_progress
07/08/2025Interior lighting powerJICHEN SUNenergy_progress
07/08/2025Maintenance informationJICHEN SUNenergy_progress
07/08/2025Fenestration and door U-factor and product ratingsJICHEN SUNenergy_progress
07/08/2025Fenestration air leakageJICHEN SUNenergy_progress
07/08/2025Insulation placement and R valuesJICHEN SUNenergy_progress
07/08/2025Mechanical SystemsJICHEN SUNspecial
07/08/2025FinalPETER CHOprogress
05/23/2025HVAC-R and service water heating equipmentJICHEN SUNenergy_progress
05/23/2025HVAC-R and service water piping design and insulationJICHEN SUNenergy_progress
05/23/2025HVAC-R and service water heating system controlsJICHEN SUNenergy_progress
05/23/2025Energy Code Compliance InspectionsJICHEN SUNprogress
05/15/2025Fire-Resistance Rated ConstructionJICHEN SUNprogress
05/15/2025Energy Code Compliance InspectionsJICHEN SUNprogress
Latest 25 of 39.
▾Documents — 37 on file (BIS + DOB NOW)
▸Plans & Drawings6
▸DOB NOWPlans/Sketch6
08/21/2026B01195657-P1Request digital key ↗
08/21/2026B01195657-I1Request digital key ↗
08/21/2026B01193305-I1Request digital key ↗
Showing 3 of 6 on file for this type
▸Seals & Professional Certifications25
▸DOB NOWProgress Inspector Seal & Signature13
09/23/2026B01252958-I1Open ↗
09/23/2026B01252958-I1Open ↗
09/23/2026B01252958-I1Open ↗
Showing 3 of 13 on file for this type
▸DOB NOWDPL-1: Design Professional Seal & Signature6
08/21/2026B01195657-P1Open ↗
08/21/2026B01195657-I1Open ↗
08/21/2026B01193305-I1Open ↗
Showing 3 of 6 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature6
09/23/2026B01252958-I1Open ↗
09/23/2026B01252958-I1Open ↗
08/31/2026B01193305-P2Open ↗
Showing 3 of 6 on file for this type
▸Environmental & Asbestos6
▸DOB NOWDEP ACP-5: Asbestos Assessment Report6
08/21/2026B01195657-P1Open ↗
08/21/2026B01195657-I1Open ↗
08/21/2026B01193305-I1Open ↗
Showing 3 of 6 on file for this type