Condo, residential tower (mixed-use, multi-family elevator) [derived]
2654 EAST 18TH STREET
💬 Discuss this project
2021Year Built
6Stories
RMBuilding Class
C4-2Zoning
17,091 sfGross Floor Area
19Units
Rent Stabilized0 Open ViolationsFDNY Report ↗
Condo, residential tower (mixed-use, multi-family elevator) [derived] · Owner of record: 2652 E 18 STREET LLC · 7,282 sf lot · 2.35 FAR built · Flood zone X500
Locations of Work
ArchitectureStructuralMechanicalPlumbingFire ProtectionEquipmentGeneral
Roof19p · 3 filings · 14 docs
Floor 632p · 6 filings · 20 docs
Floor 531p · 6 filings · 20 docs
Floor 431p · 6 filings · 20 docs
Floor 331p · 6 filings · 20 docs
Floor 233p · 6 filings · 20 docs
Floor 138p · 8 filings · 20 docs
Site & exterior28p · 5 filings · 20 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
LBS CONSULTING SERVICES5607/08/2026
PROFESSIONAL LINE CORP1103/22/2026
2652 E 18 STREET303/21/2026
177 WEST END AVE103/21/2026
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
KINDO HOLDINGS, LLC1307/22/2024
ENTHINK ENGINEERS LLC310/26/2021
DOKA ENGINEERING PC209/10/2021
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
LBS CONSULTING SERVICES2803/21/2026
ALEXANDER TRUBIN DESIGN103/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
NADKOS INCGeneral Contractor807/08/2026
PROFESSIONAL LINE CORPGeneral Contractor603/21/2026
G-NADO INCGeneral Contractor607/08/2026
AMOK INCPlumbing307/08/2026
CHESAKL ENTERPRISES INCGeneral Contractor303/21/2026
AMOK INCFire Protection207/08/2026
ZARINA KINDOElectrical103/21/2026
BENJAMIN DREBINElectrical103/21/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
ZARINA KINDO, RA4900607/22/2024
A&B WORLD CONSULTING, INC5704106/17/2020
Building Lifecycle
All (122)Filed (18)Permit Issued (18)Signed Off (12)Violation (4)Inspection (10)Objection (30)Special Inspection (30)
05/11/2026
Violation issued (HPD, closed)
A
11/20/2025
Violation issued (HPD, closed)
I
06/16/2025
Violation issued (HPD, closed)
A
04/18/2025
Inspection — Certified Gas-Gas-Piping-Roughing
Certified
View inspection ↗
04/18/2025
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Roughing
Certified
View inspection ↗
12/27/2024
Signed off — Alteration CO
Installation of the new plumbing fixtures
B01007702-S1
12/26/2024
Inspection — Pass-Final CND-Occupancy Inspection
Pass
View inspection ↗
12/09/2024
Inspection — Certified Water and Sanitary-WS-Fixtures-Finish
Certified
View inspection ↗
10/01/2024
Permit issued — General Construction
B01007702-I1-GC-CX
09/23/2024
Objection resolved — Addressed
09/04/2024
Objection resolved — Addressed
08/30/2024
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Roughing
Certified
View inspection ↗
08/30/2024
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Underground
Certified
View inspection ↗
08/27/2024
Permit issued — Plumbing
B01007702-S1-PL
08/15/2024
Special inspection requirement — Fire-Resistant Penetrations and Joints
ZARINA KINDO
08/10/2024
Special inspection requirement — HVAC-R and service water heating equipment
ZARINA KINDO
08/10/2024
Special inspection requirement — HVAC-R and service water piping design and insulation
ZARINA KINDO
08/10/2024
Special inspection requirement — HVAC-R and service water heating system controls
ZARINA KINDO
08/09/2024
Objection resolved — Addressed
08/05/2024
Special inspection requirement — Maintenance information
ZARINA KINDO
08/05/2024
Special inspection requirement — HVAC-R and service water heating system controls
ZARINA KINDO
08/05/2024
Special inspection requirement — HVAC-R and service water piping design and insulation
ZARINA KINDO
08/05/2024
Special inspection requirement — HVAC-R and service water heating equipment
ZARINA KINDO
08/05/2024
Special inspection requirement — Air barrier - visual inspection
ZARINA KINDO
07/22/2024
Filed — Alteration CO
Installation of the new plumbing fixtures
B01007702-S1
07/22/2024
Special inspection requirement — Tenant Protection Plan Compliance
ZARINA KINDO
07/18/2024
Special inspection requirement — Masonry
ZARINA KINDO
07/18/2024
Special inspection requirement — Lighting controls
ZARINA KINDO
07/18/2024
Special inspection requirement — Interior lighting power
ZARINA KINDO
07/18/2024
Special inspection requirement — Insulation placement and R values
ZARINA KINDO
07/02/2024
Objection resolved — Addressed
07/02/2024
Objection resolved — Addressed
07/02/2024
Objection resolved — Addressed
07/02/2024
Objection resolved — Addressed
06/27/2024
Objection resolved — Addressed
06/27/2024
Objection resolved — Addressed
06/27/2024
Objection resolved — Addressed
05/01/2024
Special inspection requirement — Lowest Floor Elevation
ZARINA KINDO
04/20/2024
Objection resolved — Addressed
04/18/2024
Violation issued (HPD, closed)
A
04/18/2024
Objection resolved — Addressed
04/18/2024
Objection resolved — Addressed
04/15/2024
Objection raised — Structural
04/15/2024
Objection raised — Fire_Protection
04/15/2024
Objection raised — Fire_Protection
04/15/2024
Objection raised — Fire_Protection
04/15/2024
Objection raised — Accessibility
04/15/2024
Objection raised — Structural
04/15/2024
Objection raised — Mechanical
04/15/2024
Objection raised — Structural
04/15/2024
Objection raised — Fire_Protection
04/15/2024
Objection raised — Fire_Protection
04/15/2024
Objection raised — Zoning
04/15/2024
Objection raised — Scope
04/02/2024
Objection resolved — Addressed
04/02/2024
Objection resolved — Addressed
02/28/2024
Objection raised — Fire_Protection
02/28/2024
Objection raised — Zoning
02/28/2024
Objection raised — Other
02/20/2024
Filed — Alteration CO
Installation of the new plumbing fixtures
B01007702-I1
Latest 60 of 122 events.
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWGeneral ConstructionPermit IssuedNADKOS INC10/01/2024
DOB NOWPlumbingSigned-offAMOK INC08/27/2024
DOB NOWSprinklersSigned-offAMOK INC09/22/2022
DOB NOWMechanical SystemsSigned-offG-NADO INC09/19/2022
DOB NOWCurb CutSigned-offG-NADO INC08/17/2022
DOB NOWSprinklersSigned-offAMOK INC11/19/2021
DOB NOWPlumbingSigned-offAMOK INC11/10/2021
DOB NOWSupported ScaffoldSigned-offPROFESSIONAL LINE CORP10/12/2021
DOB NOWProtection and Mechanical MethodsSigned-offCHESAKL ENTERPRISES INC09/20/2021
DOB NOWConstruction FenceSigned-offNADKOS INC09/03/2021
DOB NOWProtection and Mechanical MethodsSigned-offG-NADO INC07/06/2021
DOB NOWSidewalk ShedSigned-offPROFESSIONAL LINE CORP05/25/2021
DOB NOWStructuralSigned-offG-NADO INC05/21/2021
DOB NOWPlumbingSigned-offAMOK INC03/10/2021
DOB NOWFoundationSigned-offG-NADO INC02/23/2021
DOB NOWConstruction FenceSigned-offNADKOS INC01/21/2021
DOB NOWConstruction FenceSigned-offNADKOS INC10/04/2019
DOB NOWConstruction FenceSigned-offNADKOS INC07/19/2019
BIS—ISSUEDG-NADO INC08/31/2022
BIS—ISSUEDG-NADO INC01/24/2022
BIS—ISSUEDG-NADO INC01/22/2021
BISCCISSUEDOWNER05/11/1999
1 project · most recent 07/22/2024
Heating and Air Conditioning Systems Ventilation Systems
FiledStatusContractorScopeMake / Model / Capacity
07/22/2024Permit IssuedNADKOS INCHeating and Air Conditioning Systems, Ventilation Systems
Heat / Cool
Cooper & Hunter CH-12SPH-230VO 12,000 BTU · Heat Pump Outdoor ×1
CH-36LCUO 36,000 BTU · Heat Pump Outdoor ×1
Ventilation
S&P Usa Ventilation Systems TR-300 300 CFM · Erv ×1
1 project · most recent 07/22/2024
Water/Sanitary
FiledStatusContractorScope
07/22/2024Signed-offAMOK INCWater/Sanitary
4 projects · most recent 12/08/2024
General Wiring
FiledStatusContractorScope
12/08/2024CompleteACCURATE ELEC'L CORP.General Wiring
12/28/2022CompleteACCURATE ELEC'L CORP.General Wiring
01/25/2022CompleteSTAR ELEC'L CONTRACTORS C—
05/25/2021CompleteRICHARD NEU—
▾Field Inspections (DOB CAP) — 10
DateTypeResultReport
04/18/2025Certified Gas-Gas-Piping-RoughingCertifiedView ↗
04/18/2025Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
12/26/2024Pass-Final CND-Occupancy InspectionPassView ↗
12/09/2024Certified Water and Sanitary-WS-Fixtures-FinishCertifiedView ↗
08/30/2024Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
08/30/2024Certified Water and Sanitary-WS-Sanitary Piping-UndergroundCertifiedView ↗
02/09/2023Pass-Final Curb Cut Non-Directive 14PassView ↗
09/29/2022Certified Sprinkler-Dry Pipe Valve (SP)-Dry Pipe Valve TestCertifiedView ↗
09/29/2022Certified Sprinkler-SP-Fixtures-FinishCertifiedView ↗
09/26/2022Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic TestCertifiedView ↗
▾Special Inspection Requirements (DOB NOW) — 35
DateRequirementInspectorRole
08/15/2024Fire-Resistant Penetrations and JointsZARINA KINDOspecial
08/10/2024HVAC-R and service water heating equipmentZARINA KINDOenergy_progress
08/10/2024HVAC-R and service water piping design and insulationZARINA KINDOenergy_progress
08/10/2024HVAC-R and service water heating system controlsZARINA KINDOenergy_progress
08/05/2024Maintenance informationZARINA KINDOenergy_progress
08/05/2024HVAC-R and service water heating system controlsZARINA KINDOenergy_progress
08/05/2024HVAC-R and service water piping design and insulationZARINA KINDOenergy_progress
08/05/2024HVAC-R and service water heating equipmentZARINA KINDOenergy_progress
08/05/2024Air barrier - visual inspectionZARINA KINDOenergy_progress
07/22/2024Tenant Protection Plan ComplianceZARINA KINDOspecial
07/18/2024MasonryZARINA KINDOspecial
07/18/2024Lighting controlsZARINA KINDOenergy_progress
07/18/2024Interior lighting powerZARINA KINDOenergy_progress
07/18/2024Insulation placement and R valuesZARINA KINDOenergy_progress
05/01/2024Lowest Floor ElevationZARINA KINDOprogress
02/19/2024FinalJAMES NAPOLIprogress
02/19/2024Mechanical SystemsZARINA KINDOspecial
01/08/2021Footing and FoundationZARINA KINDOprogress
01/08/2021FinalZARINA KINDOprogress
12/17/2020HVAC and service water heating equipment ZARINA KINDOenergy_progress
12/17/2020HVAC and service water heating system controls ZARINA KINDOenergy_progress
12/17/2020FinalXIONGCAI GUprogress
12/17/2020Mechanical SystemsZARINA KINDOspecial
12/17/2020HVAC insulation and sealing ZARINA KINDOenergy_progress
12/17/2020Shutoff dampersZARINA KINDOenergy_progress
Latest 25 of 35.
▾Documents — 205 on file (BIS + DOB NOW)
▸Plans & Drawings19
▸DOB NOWPlans/Sketch7
09/01/2026B00527277-I1Request digital key ↗
09/01/2026B00527541-I1Request digital key ↗
09/01/2026B00591447-I1Request digital key ↗
Showing 3 of 7 on file for this type
▸DOB NOWPlans/Sketch - Plumbing3
09/02/2026B00349837-I1Request digital key ↗
08/15/2026B00349837-P1Request digital key ↗
08/15/2026B00349837-P2Request digital key ↗
▸DOB NOWPlans/Sketch - Mechanical Systems3
09/02/2026B00350145-I1Request digital key ↗
08/15/2026B00350145-P1Request digital key ↗
08/15/2026B00350145-P2Request digital key ↗
▸DOB NOWPlans/Sketch - Construction Fence1
09/02/2026B00196054-I1Request digital key ↗
▸DOB NOWPlans/Sketch - Foundation1
09/01/2026B00450477-I1Request digital key ↗
▸DOB NOWPlans/Sketch - Structural1
09/02/2026B00346532-I1Request digital key ↗
▸DOB NOWPlans/Sketch - Earthwork1
09/01/2026B00450477-I1Request digital key ↗
▸DOB NOWPlans/Sketch - Curb Cut1
09/02/2026B00342920-I1Request digital key ↗
▸DOB NOWPlans/Sketch - Sprinkler1
09/02/2026B00359063-I1Request digital key ↗
▸Applications & Permits17
▸BISPLAN / WORK APPROVAL APPLICATION11
10/24/2023321594681Open ↗
08/22/2023300728880Open ↗
07/19/2023300728880Open ↗
Showing 3 of 11 on file for this type
▸BISWORK PERMIT APPLICATION4
04/26/2023321985107Open ↗
01/27/2021321594681Open ↗
01/14/2021321594681Open ↗
Showing 3 of 4 on file for this type
▸BISApplication Withdrawal/Address Change Form OP-1131
08/22/2023300728880Open ↗
▸BISBPP-5 - Authorization to the Department of Transportation1
05/26/2020320599198Open ↗
▸Zoning, Tax Lot & Property Records15
▸BISTAX LOT: TENTATIVE LOT NUMBER ISSUED2
03/07/2023322159971Open ↗
06/19/2020321594681Open ↗
▸BISZONING EXHIBIT III:DESC. & OWNRSHP.STMNT2
03/07/2023322159971Open ↗
06/19/2020321594681Open ↗
▸BISFLOOD ZONE COMPLIANCE2
11/16/2023321594681Open ↗
03/31/2023321985107Open ↗
▸BISZONING EXHIBIT I: CERTIFICATION2
03/07/2023322159971Open ↗
06/19/2020321594681Open ↗
▸DOB NOWZD1: DOB Zoning Diagram2
08/13/2026B00450477-I1Open ↗
08/13/2026B01007702-I1Open ↗
▸BISVERIFY TAX LOT1
10/11/2023321594681Open ↗
▸BISADDRESS: NEW HOUSE NUMBER APPROVED1
06/19/2020321594681Open ↗
▸BISCO OBJ: VERIFY ADDRESS-TOPO STAMP1
01/31/2023321594681Open ↗
▸BISZONING DIAGRAM1
12/14/2020321594681Open ↗
▸DOB NOWZoning Exhibit form (1-5)1
08/13/2026B01007702-I1Open ↗
▸Seals & Professional Certifications47
▸DOB NOWProgress Inspector Seal & Signature19
09/23/2026B00350145-P2Open ↗
09/23/2026B00350145-P2Open ↗
09/23/2026B00350145-P2Open ↗
Showing 3 of 19 on file for this type
▸DOB NOWDPL-1: Design Professional Seal & Signature18
09/01/2026B00527541-I1Open ↗
09/01/2026B00591447-I1Open ↗
09/01/2026B00610296-P1Open ↗
Showing 3 of 18 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature6
09/23/2026B00350145-P2Open ↗
09/01/2026B01007702-S1Open ↗
09/01/2026B01007702-S1Open ↗
Showing 3 of 6 on file for this type
▸BISTECHNICAL REPORT: RESPONSIBILITY/CERTIFICATION2
01/12/2021321594681Open ↗
12/27/2019321985107Open ↗
▸BISPROFESSIONAL CERTIFICATION STATEMENT1
12/27/2019321985107Open ↗
▸BISPROFESSIONAL CERTIFIED CHECKLIST1
12/27/2019321985107Open ↗
▸Trade Schedules & Equipment2
▸BISHVAC & SERVICE WATER HEATING EQUIPMENT1
03/30/2023321594681Open ↗
▸BISHVAC & SERVICE WATER HEATING SYSTEM CONTROLS1
11/16/2023321594681Open ↗
▸Safety & Tenant Protection4
▸BISSTREET TREE SIGNOFF2
03/28/2023320599198Open ↗
01/31/2023321594681Open ↗
▸BISSTREET TREES: RECEIPT OF STREET TREES SITE PLAN1
01/14/2021321594681Open ↗
▸DOB NOWStreet Tree Checklist1
08/14/2026B01007702-I1Open ↗
▸Energy Compliance14
▸BISTECHNICAL REPORT: ENERGY CODE - RESPONSIBILITY3
11/09/2023321594681Open ↗
05/01/2023321594681Open ↗
01/14/2021321594681Open ↗
▸BISAS-BUILT ENERGY ANALYSIS (EN2)2
03/30/2023321594681Open ↗
03/30/2023321594681Open ↗
▸BISTECHNICAL REPORT: ENERGY CODE PROGRESS INSPS2
01/12/2021321594681Open ↗
12/27/2019321985107Open ↗
▸BISPRELIMINARY COMMISSIONING REPORT CERTIFICATION1
03/07/2023321594681Open ↗
▸BISINTERIOR LIGHTING POWER1
11/16/2023321594681Open ↗
▸BISFENESTRATION U-FACTOR & PRODUCT RATING1
11/16/2023321594681Open ↗
▸BISFENESTRATION AREAS1
11/16/2023321594681Open ↗
▸BISELECTRICAL ENERGY CONSUMPTION1
11/16/2023321594681Open ↗
▸BISINSULATION PLACEMENT & R VALUES1
11/16/2023321594681Open ↗
▸BISLIGHTING IN DWELLING UNITS1
11/16/2023321594681Open ↗
▸Inspections & Test Reports19
▸BISTECHNICAL REPORT: RESPONSIBILITY6
11/14/2023321594681Open ↗
11/14/2023321594681Open ↗
11/14/2023321594681Open ↗
Showing 3 of 6 on file for this type
▸BISTECHNICAL REPORT: CONCRETE/TEST CYLINDER3
11/20/2023321594681Open ↗
05/02/2023321594681Open ↗
01/12/2021321594681Open ↗
▸BISTECHNICAL REPORT: SOIL INSPECTION2
11/15/2023321594681Open ↗
11/09/2023321594681Open ↗
▸BISTECHNICAL REPORT: CONCRETE DESIGN MIX2
01/12/2021321594681Open ↗
01/12/2021321594681Open ↗
▸BISDEEP FOUNDATIONS / PILES2
03/08/2023321985107Open ↗
03/08/2023321985107Open ↗
▸BISDEMOLITION (DM) JOB SIGNOFF2
02/28/2023321594681Open ↗
01/14/2021321594681Open ↗
▸BISGEOTECHNICAL REPORT1
06/19/2020321594681Open ↗
▸BISPILES: FINAL PILE PLAN/CREOSOTE LETTER1
03/31/2023321985107Open ↗
▸Approvals, Objections & Sign-offs9
▸BISLETTERS - SUPPORTING DOCUMENTATION3
03/07/2023322159971Open ↗
04/06/2022321594681Open ↗
12/02/2019321594681Open ↗
▸BISBPP-8 - Request Items for Builders Pavement Plan Signoff2
03/29/2023320599198Open ↗
03/29/2023320599198Open ↗
▸BISSCHEDULE A - OCCUPANCY / USE2
04/07/2023321594681Open ↗
04/22/2020321594681Open ↗
▸BISCERTIFICATE OF OCCUPANCY/LOC: REQUEST1
04/25/2023321985107Open ↗
▸BISSUSTAINABLE ROOF ZONE FORM (SIGNOFF)1
04/11/2023321594681Open ↗
▸Cost, Insurance & Ownership8
▸BISAcord 25 (Acord Certificate of Liability Insurance)3
01/27/2021321594681Open ↗
01/12/2021321594681Open ↗
01/12/2021321594681Open ↗
▸BISPROJECT-SPECIFIC GL INSURANCE3
01/14/2021321594681Open ↗
01/12/2021321594681Open ↗
01/12/2021321594681Open ↗
▸BISCOST AFFIDAVIT1
12/27/2019321985107Open ↗
▸BISCOST AFFIDAVIT (FINAL): PW31
03/31/2023321985107Open ↗
▸Filing & Intake Forms16
▸BISADDITIONAL INFORMATION9
10/05/2023321594681Open ↗
07/25/2023300728880Open ↗
03/07/2023322159971Open ↗
Showing 3 of 9 on file for this type
▸BISEFILING COVER SHEET3
03/03/2023322159971Open ↗
05/19/2020320599198Open ↗
12/30/2019321985107Open ↗
▸BISBOROUGH INTAKE FORM3
04/26/2023321985107Open ↗
01/12/2021321594681Open ↗
01/05/2021321594681Open ↗
▸BISBPP: CHECKLIST IN LIEU OF PLANS-ALT31
05/26/2020320599198Open ↗
▸Other Documents20
▸BISBPP - SUPPORTING DOCUMENTATION3
03/29/2023320599198Open ↗
03/29/2023320599198Open ↗
05/26/2020320599198Open ↗
▸DOB NOWPlot Diagram2
08/13/2026B01007702-I1Open ↗
08/13/2026B00450477-I1Open ↗
▸BISSHUTOFF DAMPERS1
11/16/2023321594681Open ↗
▸BISLOWEST FLOOR ELEVATION1
11/16/2023321594681Open ↗
▸BISPROTECTION OF EXPOSED FOUNDATION INSULATION1
11/16/2023321594681Open ↗
▸BISFEMA ELEVATION CERT (086-0-33)/ FLOODPROOFING CERT (086-0-34)1
04/12/2023321594681Open ↗
▸BISMAINTENANCE INFORMATION1
11/16/2023321594681Open ↗
▸BISRECORDS MGMT FEE PAYMENT RECEIPT1
03/08/2023322159971Open ↗
▸BISPLOT DIAGRAM1
03/07/2023322159971Open ↗
▸BISHVAC & SERVICE WATER PIPING DESIGN AND INSULATION1
11/16/2023321594681Open ↗
▸BISFINAL DIR141
04/05/2023321985107Open ↗
▸DOB NOWFlood Plan Emergency Temporary Flood Shields1
08/14/2026B01007702-I1Open ↗
▸DOB NOWSite Survey: Initial1
08/13/2026B01007702-I1Open ↗
▸DOB NOWFinal Survey1
08/13/2026B01007702-I1Open ↗
▸DOB NOWLocal Law 92/94 of 2019 Sustainable Roof Zone1
08/13/2026B01007702-I1Open ↗
▸DOB NOWAdjoining Owners Notification1
08/13/2026B00450477-I1Open ↗
▸DOB NOWProperty Ownership Certification1
08/14/2026B01007702-I1Open ↗