← Back
Elevator apt, fireproof without stores
Drew-hamilton (NYCHA)
2654 FREDRICK DOUGLASS BL · BIN 1086080
💬 Discuss this project
1963Year Built
21Stories
D3Building Class
R7-2Zoning
216,247 sfGross Floor Area
249Units
LL97 Covered2 Open Violations ▸FISP: SWARMPFDNY Report ↗
Elevator apt, fireproof without stores · Owner of record: NYC HOUSING AUTHORITY · 84,927 sf lot · 2.55 FAR built · Flood zone X
Locations of Work
ArchitectureStructuralPlumbing
Roof2p · 1 filing · 20 docs
Bulkhead4p · 1 filing · 20 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
NYCHA3709/30/2026
NYC HOIUSING AUTHORITY1003/22/2026
NYC HOUSING AUTHORITY 9103/22/2026
NYCHA 99203/22/2026
NY HOUSING AUTHORITY103/21/2026
▾Design Consultants (Architect / Engineer of Record)
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
GRAIN COLLECTIVE203/21/2026
PURCELL EVERETT ARCHITECTS1603/21/2026
JOEL PHAGOO P.E. PLLC103/21/2026
AK CONSULTING SERVICES403/21/2026
NYCHA103/21/2026
JOEL PHAGOO P E103/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
SKYWORX CONTRACTING INCGeneral Contractor907/08/2026
MNK ENTERPRISES LLCGeneral Contractor607/08/2026
ZORIA HOUSING, LLCGeneral Contractor507/08/2026
CHAO QIANG YUANElectrical303/21/2026
SKOWRONSKI JEFFElectrical103/21/2026
JCC CONSTRUCTION CORPGeneral Contractor109/30/2026
Q.Y. ELECTRIC, INCElectrical103/22/2026
JEFF SKOWRONSKIElectrical103/21/2026
GAMBINO, FERDINANDElectrical103/21/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
HUDSON PEAKS CONSULTING L8381111/17/2025
JOEL PHAGOO ,PE, PLLC2416102/07/2024
TECTONIC ENGINEERING CONS106412/19/2023
COWI CONSULTING INC.1260205/11/2023
Building Lifecycle
All (101)Filed (17)Permit Issued (15)Signed Off (7)Facade (FISP) (15)Violation (29)Objection (3)Special Inspection (15)
09/29/2026
Permit issued — Structural
M01304510-I1-GC-CX
02/12/2026
Objection raised — Admin
01/21/2026
Filed — Alteration
SITE YARD WORK WITH 8' HIGH ENCLOSING FENCE AND GATES AS PER PLANS FILED HEREWITH. NO CHANGE TO USE, EGRESS OR OCCUPANCY.
M01304510-S1
12/18/2025
Objection resolved — Addressed
12/05/2025
Objection raised — Other
11/17/2025
Filed — Alteration
SITE YARD WORK WITH 8' HIGH ENCLOSING FENCE AND GATES AS PER PLANS FILED HEREWITH. NO CHANGE TO USE, EGRESS OR OCCUPANCY.
M01304510-I1
10/16/2025
Signed off — Alteration
M01001017-I1
10/16/2025
Permit issued — Suspended Scaffold
M01001017-I1-SC
01/09/2025
Signed off — Alteration
BUILDING #1 STRUCTURAL WORK RELATED TO REPLACEMENT OF ROOF WATERPROOFING. ALL AS PER PLANS FILED HEREWITH. NO CHANGE IN USE, EGRESS OR OCCUPANCY
M00615051-S1
12/13/2024
Signed off — Alteration
BUILDING #1 STRUCTURAL WORK RELATED TO REPLACEMENT OF ROOF WATERPROOFING. ALL AS PER PLANS FILED HEREWITH. NO CHANGE IN USE, EGRESS OR OCCUPANCY
M00615051-I1
10/01/2024
Signed off — Alteration
INSTALLATION OF TEMPORARY SIDEWALK SHED AS PER PLANS. SIDEWALK SHED SHALL COMPLY WITH CHAPTER 33 OF THE 2022 NYC BUILDING CODE. NO CHANGE IN USE, EGRESS OR OCCUPANCY UNDER THIS APPLICATION.
M00877207-I1
10/01/2024
Signed off — Alteration
M00877208-I1
08/16/2024
Cycle 9 facade report submitted
08/16/2024
Cycle 9 facade report signed — SWARMP
07/19/2024
Cycle 9 facade inspection completed
06/25/2024
Signed off — Alteration
M00515615-I1
06/25/2024
Permit issued — Sidewalk Shed
M00877207-I1-SH
05/18/2024
Signed off — Alteration
INSTALLATION OF NEW SIDEWALK SHED AT 2660 F DOUGLASS BOULEVARD, MANHATTAN AS INDICATED ON PLANS. THERE WILL BE NO CHANGE IN THE USE, EGRESS, OR OCCUPANCY UNDER THIS APPLICATION.
M00429553-I1
02/20/2024
Permit issued — Suspended Scaffold
M01001017-I1-SC
02/07/2024
Filed — Alteration
M01001017-I1
02/05/2024
Special inspection requirement — Post-installed Anchors
JOEL PHAGOO
12/19/2023
Filed — Alteration
BUILDING #1 STRUCTURAL WORK RELATED TO REPLACEMENT OF ROOF WATERPROOFING. ALL AS PER PLANS FILED HEREWITH. NO CHANGE IN USE, EGRESS OR OCCUPANCY
M00615051-P5
12/08/2023
Special inspection requirement — Insulation placement and R values
GEORGE GHEBRYAL
12/08/2023
Special inspection requirement — Fire-Resistant Penetrations and Joints
GEORGE GHEBRYAL
12/08/2023
Special inspection requirement — Masonry
GEORGE GHEBRYAL
12/08/2023
Special inspection requirement — Final
GEORGE GHEBRYAL
10/26/2023
Filed — Alteration
BUILDING #1 STRUCTURAL WORK RELATED TO REPLACEMENT OF ROOF WATERPROOFING. ALL AS PER PLANS FILED HEREWITH. NO CHANGE IN USE, EGRESS OR OCCUPANCY
M00615051-P4
10/10/2023
Filed — Alteration
INSTALLATION OF TEMPORARY SIDEWALK SHED AS PER PLANS. SIDEWALK SHED SHALL COMPLY WITH CHAPTER 33 OF THE 2022 NYC BUILDING CODE. NO CHANGE IN USE, EGRESS OR OCCUPANCY UNDER THIS APPLICATION.
M00877207-P1
07/13/2023
Permit issued — General Construction
M00615051-I1-GC
07/13/2023
Permit issued — Structural
M00615051-S1-ST
05/22/2023
Filed — Alteration
INSTALLATION OF TEMPORARY SIDEWALK SHED AS PER PLANS. SIDEWALK SHED SHALL COMPLY WITH CHAPTER 33 OF THE 2022 NYC BUILDING CODE. NO CHANGE IN USE, EGRESS OR OCCUPANCY UNDER THIS APPLICATION.
M00877207-I1
05/22/2023
Filed — Alteration
M00877208-I1
05/22/2023
Permit issued — Construction Fence
M00877208-I1-FN
05/22/2023
Permit issued — Sidewalk Shed
M00877207-I1-SH
05/18/2023
Cycle 9 facade report submitted
05/16/2023
Filed — Alteration
BUILDING #1 STRUCTURAL WORK RELATED TO REPLACEMENT OF ROOF WATERPROOFING. ALL AS PER PLANS FILED HEREWITH. NO CHANGE IN USE, EGRESS OR OCCUPANCY
M00615051-P3
05/11/2023
Filed — Alteration
BUILDING #1 STRUCTURAL WORK RELATED TO REPLACEMENT OF ROOF WATERPROOFING. ALL AS PER PLANS FILED HEREWITH. NO CHANGE IN USE, EGRESS OR OCCUPANCY
M00615051-P2
05/09/2023
Special inspection requirement — Structural Steel - Details
GENARO VELEZ
05/09/2023
Special inspection requirement — Final
05/09/2023
Special inspection requirement — Concrete - Cast-In-Place
GENARO VELEZ
05/09/2023
Special inspection requirement — Masonry
GENARO VELEZ
05/09/2023
Special inspection requirement — Post-installed Anchors
GENARO VELEZ
05/09/2023
Special inspection requirement — Structural Stability – Alterations of existing buildings
GENARO VELEZ
05/08/2023
Special inspection requirement — Fire-Resistant Penetrations and Joints
GENARO VELEZ
05/08/2023
Special inspection requirement — Masonry
GENARO VELEZ
05/08/2023
Special inspection requirement — Final
05/08/2023
Special inspection requirement — Insulation placement and R values
05/05/2023
Filed — Alteration
BUILDING #1 STRUCTURAL WORK RELATED TO REPLACEMENT OF ROOF WATERPROOFING. ALL AS PER PLANS FILED HEREWITH. NO CHANGE IN USE, EGRESS OR OCCUPANCY
M00615051-P1
04/21/2023
Cycle 9 facade report signed — UNSAFE
03/27/2023
Violation issued (ECB, closed)
Boilers
03/20/2023
Cycle 9 facade inspection completed
03/03/2023
Permit issued — Sidewalk Shed
M00429553-I1-SH
03/02/2023
Permit issued — Construction Fence
M00515615-I1-FN
02/22/2023
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
04/11/2022
Permit issued — Sidewalk Shed
M00429553-I1-SH
04/07/2022
Permit issued — Construction Fence
M00515615-I1-FN
01/25/2022
Filed — Alteration
BUILDING #1 STRUCTURAL WORK RELATED TO REPLACEMENT OF ROOF WATERPROOFING. ALL AS PER PLANS FILED HEREWITH. NO CHANGE IN USE, EGRESS OR OCCUPANCY
M00615051-S2
01/20/2022
Filed — Alteration
BUILDING #1 STRUCTURAL WORK RELATED TO REPLACEMENT OF ROOF WATERPROOFING. ALL AS PER PLANS FILED HEREWITH. NO CHANGE IN USE, EGRESS OR OCCUPANCY
M00615051-S1
01/12/2022
Filed — Alteration
BUILDING #1 STRUCTURAL WORK RELATED TO REPLACEMENT OF ROOF WATERPROOFING. ALL AS PER PLANS FILED HEREWITH. NO CHANGE IN USE, EGRESS OR OCCUPANCY
M00615051-I1
01/12/2022
Permit issued — Sidewalk Shed
M00429553-I1-SH
Latest 60 of 101 events.
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWStructuralPermit IssuedJCC CONSTRUCTION CORP09/29/2026
DOB NOWSuspended ScaffoldSigned-offZORIA HOUSING LLC10/16/2025
DOB NOWSidewalk ShedSigned-offMNK ENTERPRISES LLC06/25/2024
DOB NOWSuspended ScaffoldSigned-offZORIA HOUSING LLC02/20/2024
DOB NOWGeneral ConstructionSigned-offZORIA HOUSING, LLC07/13/2023
DOB NOWStructuralSigned-offZORIA HOUSING, LLC07/13/2023
DOB NOWConstruction FenceSigned-offZORIA HOUSING, LLC05/22/2023
DOB NOWSidewalk ShedSigned-offMNK ENTERPRISES LLC05/22/2023
DOB NOWSidewalk ShedSigned-offMNK ENTERPRISES LLC03/03/2023
DOB NOWConstruction FenceSigned-offMNK ENTERPRISES LLC03/02/2023
DOB NOWSidewalk ShedSigned-offSKYWORX CONTRACTING INC04/11/2022
DOB NOWConstruction FenceSigned-offSKYWORX CONTRACTING INC04/07/2022
DOB NOWSidewalk ShedSigned-offSKYWORX CONTRACTING INC01/12/2022
DOB NOWConstruction FenceSigned-offSKYWORX CONTRACTING INC05/05/2021
DOB NOWSidewalk ShedSigned-offSKYWORX CONTRACTING INC01/12/2021
BISPLISSUEDPERFORMANCE PLBG11/21/2006
BISEQISSUEDZORIA CONSTRUCTION CORP03/05/2004
BISEQISSUEDZORIA CONSTRUCTION CORP05/07/2003
BISEQISSUEDSAFWAY STEEL PRODUCTS11/13/2001
BISOTISSUEDAAH CONTRUCTION CORP02/01/2001
BISOTISSUEDAAH CONTRUCTION CORP11/14/2000
BISEQISSUEDPHOENIX CONSTRUCTION06/08/2000
BISPLISSUEDASPRO MECHNICAL CONTRACTING INC01/28/1999
BISOTISSUEDD&S PLBG & HTG CORP/ZAFFUTO CONS11/18/1997
BISPLISSUEDD&S PLBG & HTG ZAFFUTO CONST11/18/1997
BISOTISSUEDMILLAR ELEVATOR INDUSTRIES, INC11/29/1994
6 projects · most recent 03/30/2026
General Wiring
FiledStatusContractorScope
03/30/2026CompleteSEZEKCOL ELECTRIC INCGeneral Wiring
06/23/2023CompleteQ.Y. ELECTRIC, INC—
05/24/2023CompleteQ.Y. ELECTRIC, INC—
05/11/2023CompleteQ.Y. ELECTRIC, INC—
01/12/2021Permit IssuedAMIN ELECTRICAL CORP—
02/06/2018CompleteCHARAN ELEC'L ENTERP'S INGeneral Wiring
2 projects · most recent 01/21/2026
Concrete Steel Masonry
FiledStatusContractorScope
01/21/2026Permit IssuedJCC CONSTRUCTION CORPConcrete
12/19/2023Signed-offZORIA HOUSING, LLCSteel, Concrete, Masonry
1 project · most recent 01/11/2021
Fence
FiledStatusContractorScope
01/11/2021——Fence
▾Special Inspection Requirements (DOB NOW) — 15
DateRequirementInspectorRole
02/05/2024Post-installed AnchorsJOEL PHAGOOspecial
12/08/2023Insulation placement and R valuesGEORGE GHEBRYALenergy_progress
12/08/2023Fire-Resistant Penetrations and JointsGEORGE GHEBRYALspecial
12/08/2023MasonryGEORGE GHEBRYALspecial
12/08/2023FinalGEORGE GHEBRYALprogress
05/09/2023Structural Steel - DetailsGENARO VELEZspecial
05/09/2023Final—progress
05/09/2023Concrete - Cast-In-PlaceGENARO VELEZspecial
05/09/2023MasonryGENARO VELEZspecial
05/09/2023Post-installed AnchorsGENARO VELEZspecial
05/09/2023Structural Stability – Alterations of existing buildingsGENARO VELEZspecial
05/08/2023Fire-Resistant Penetrations and JointsGENARO VELEZspecial
05/08/2023MasonryGENARO VELEZspecial
05/08/2023Final—progress
05/08/2023Insulation placement and R values—energy_progress
▾Documents — 65 on file (BIS + DOB NOW)
▸Plans & Drawings15
▸DOB NOWPlans/Sketch13
09/03/2026M00515615-I1Request digital key ↗
08/31/2026M00615051-I1Request digital key ↗
08/31/2026M00615051-P5Request digital key ↗
Showing 3 of 13 on file for this type
▸DOB NOWPlans/Sketch - Construction Fence1
09/04/2026M00429570-I1Request digital key ↗
▸DOB NOWPlans/Sketch - Sidewalk Shed1
09/04/2026M00429553-I1Request digital key ↗
▸Seals & Professional Certifications18
▸DOB NOWDPL-1: Design Professional Seal & Signature14
09/04/2026M00429553-I1Open ↗
09/04/2026M00429570-I1Open ↗
08/31/2026M00615051-P5Open ↗
Showing 3 of 14 on file for this type
▸DOB NOWProgress Inspector Seal & Signature2
09/01/2026M00615051-P5Open ↗
09/01/2026M00615051-P5Open ↗
▸DOB NOWSpecial Inspector Seal & Signature2
09/01/2026M00615051-P5Open ↗
08/25/2026M01001017-I1Open ↗
▸Safety & Tenant Protection2
▸DOB NOWTenant Protection Plan2
09/04/2026M00429553-I1Open ↗
09/04/2026M00429570-I1Open ↗
▸Environmental & Asbestos3
▸DOB NOWDEP ACP-20/ACP-21: Asbestos Project Conditional Completion Form/Asbestos Project Completion Form2
08/31/2026M00615051-S1Open ↗
08/31/2026M00615051-I1Open ↗
▸DOB NOWDEP ACP-5: Asbestos Assessment Report1
08/15/2026M01304510-I1Open ↗
▸Energy Compliance1
▸DOB NOWEN2: As Built Energy Analysis.1
08/13/2026M00615051-I1Open ↗
▸Approvals, Objections & Sign-offs22
▸DOB NOWFee Exempt Supporting Document - DOF ACRIS report or BIB letter15
09/04/2026M00429553-I1Open ↗
09/04/2026M00429570-I1Open ↗
08/31/2026M00877208-I1Open ↗
Showing 3 of 15 on file for this type
▸DOB NOWDesign Commission Sign Off City Owned (Exterior Work)3
09/04/2026M00429553-I1Open ↗
09/04/2026M00429570-I1Open ↗
08/13/2026M00515615-I1Open ↗
▸DOB NOWDesign Commission Approval City Owned (Exterior Work)2
08/13/2026M01304510-I1Open ↗
08/13/2026M01304510-S1Open ↗
▸DOB NOWDEP Variance (V5) letter2
08/13/2026M00615051-S1Open ↗
08/13/2026M00615051-I1Open ↗
▸Other Documents4
▸DOB NOWFee Exempt Supporting Document - DOF Property Tax Assessment Roll2
08/13/2026M00877207-P1Open ↗
08/13/2026M00877207-I1Open ↗
▸DOB NOWCalculations1
08/13/2026M01001017-I1Open ↗
▸DOB NOWManufacturer's Specifications1
08/13/2026M01001017-I1Open ↗