Miscellaneous two family
266 BROOKLYN AVENUE
BROOKLYN · BIN 3032389
💬 Discuss this project
1909Year Built
4Stories
B9Building Class
R6Zoning
4,641 sfGross Floor Area
2Units
4 Open Violations ▸FDNY Report ↗
Miscellaneous two family · 2,125 sf lot · 2.18 FAR built · Flood zone X
Locations of Work
ArchitectureStructural
Permit Issued — active, not yet Signed-off
RoofUnder Construction60p · 2 filings · 20 docs
Floor 4Under Construction59p · 2 filings · 20 docs
Floor 3Under Construction59p · 2 filings · 20 docs
Floor 2Under Construction58p · 2 filings · 20 docs
Floor 1Under Construction59p · 2 filings · 20 docs
CellarUnder Construction58p · 2 filings · 20 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
TOPLINE NYC CONTRACTING1407/08/2026
ABCAT ASSOCIATES1003/22/2026
TOPLINE CONTRACTING103/22/2026
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
BLACKSTONE ENGINEERING, PLLC111/05/2025
GEORGE ARCHITECT908/17/2025
ZHENG ENGINEERING PLLC107/21/2022
SYED ENGINEERING, P.C.208/04/2021
STRUCTURAL ENGINEERING BURO307/01/2021
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
ADVANCED BUILDERS SERVICES203/21/2026
ABCAT ASSOCIATES INC DBA WILD STONE103/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
ABCAT ASSOCIATES INCGeneral Contractor2007/08/2026
TOPLINE NYC CONTRACTINGGeneral Contractor1607/08/2026
P.S.I. MECHANICALPlumbing807/08/2026
RICHARD NEUElectrical103/22/2026
SHINE CONSTRUCTION & DEVGeneral Contractor104/09/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
GEORGE ARCHITECT PLLC79221208/17/2025
STRUCTURAL ENGINEERING BU5883307/01/2021
Building Lifecycle
All (125)Filed (16)Permit Issued (19)Signed Off (1)Violation (33)Inspection (10)Objection (16)Special Inspection (30)
03/16/2026
Objection resolved — Addressed
02/25/2026
Objection resolved — Addressed
02/05/2026
Objection raised — Cost
01/12/2026
Objection resolved — Addressed
01/11/2026
Objection raised — Scope
12/17/2025
Objection resolved — Addressed
12/11/2025
Objection raised — Scope
12/01/2025
Objection resolved — Addressed
11/16/2025
Objection raised — Scope
11/16/2025
Objection raised — Scope
11/14/2025
Inspection — Pass-Final CND-Occupancy Inspection
Pass
View inspection ↗
11/05/2025
Filed — Alteration
WORK ENTAILED IS THE INSTALLATION OF TWO DRAINAGE STRUCTURES IN THE REAR YARD AND THE ANCILLARY CONCRETE WORK TO ESTABLISH POSITIVE DRAINAGE TOWARD THE STRUCTURES. NO CHANGES TO USE, EGRESS, OR OCCUPANCY.
B01306816-I1
09/09/2025
Permit issued — General Construction
B00486045-I1-GC
08/18/2025
Special inspection requirement — Structural Stability – Alterations of existing buildings
DENNIS GEORGE
08/18/2025
Special inspection requirement — Fire-Resistant Penetrations and Joints
DENNIS GEORGE
08/18/2025
Special inspection requirement — Fire-Resistance Rated Construction
DENNIS GEORGE
08/18/2025
Special inspection requirement — Energy Code Compliance Inspections
DENNIS GEORGE
08/18/2025
Special inspection requirement — Insulation placement and R values
DENNIS GEORGE
08/18/2025
Special inspection requirement — Lighting in dwelling units
DENNIS GEORGE
08/18/2025
Special inspection requirement — Air barrier - visual inspection
DENNIS GEORGE
08/18/2025
Special inspection requirement — Fenestration air leakage
DENNIS GEORGE
08/18/2025
Special inspection requirement — Vestibules
DENNIS GEORGE
08/17/2025
Filed — Alteration
B00486045-P1
01/22/2025
Filed — Alteration
Plumbing fixtures & equipment as per plans
B00483403-P4
01/10/2025
Special inspection requirement — HVAC-R and service water piping design and insulation
DENNIS GEORGE
01/10/2025
Special inspection requirement — Fire-Resistant Penetrations and Joints
DENNIS GEORGE
01/10/2025
Special inspection requirement — Energy Code Compliance Inspections
DENNIS GEORGE
11/25/2024
Filed — Alteration
Plumbing fixtures & equipment as per plans
B00483403-P3
09/16/2024
Filed — Alteration
Plumbing fixtures & equipment as per plans
B00483403-P2
08/26/2024
Inspection — Fail-Final PL - Up to 9 Requested Floors
Fail
View inspection ↗
03/19/2024
Filed — Alteration
Plumbing fixtures & equipment as per plans
B00483403-P1
02/23/2024
Inspection — Certified Storm Drainage-ST-Piping-Roughing
Certified
View inspection ↗
02/23/2024
Inspection — Certified Storm Drainage-ST-Piping-Underground
Certified
View inspection ↗
02/23/2024
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Roughing
Certified
View inspection ↗
12/19/2023
Permit issued — Plumbing
B00483403-I1-PL
12/15/2023
Special inspection requirement — Lighting in dwelling units
DENNIS GEORGE
12/15/2023
Special inspection requirement — Air barrier - visual inspection
DENNIS GEORGE
12/15/2023
Special inspection requirement — Fenestration air leakage
DENNIS GEORGE
12/15/2023
Special inspection requirement — Vestibules
DENNIS GEORGE
12/15/2023
Special inspection requirement — Insulation placement and R values
DENNIS GEORGE
12/15/2023
Special inspection requirement — Fire-Resistant Penetrations and Joints
DENNIS GEORGE
12/15/2023
Special inspection requirement — Energy Code Compliance Inspections
DENNIS GEORGE
12/15/2023
Special inspection requirement — HVAC-R and service water piping design and insulation
DENNIS GEORGE
12/15/2023
Special inspection requirement — Fire-Resistant Penetrations and Joints
DENNIS GEORGE
12/15/2023
Special inspection requirement — Structural Stability – Alterations of existing buildings
DENNIS GEORGE
12/15/2023
Special inspection requirement — Energy Code Compliance Inspections
DENNIS GEORGE
12/15/2023
Special inspection requirement — Fire-Resistance Rated Construction
DENNIS GEORGE
12/12/2023
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Underground
Certified
View inspection ↗
10/03/2023
Permit issued — Supported Scaffold
B00568269-I1-SF
10/03/2023
Permit issued — Sidewalk Shed
B00334761-I1-SH
07/19/2023
Permit issued — Construction Fence
B00777927-I1-FN
02/24/2023
Permit issued — General Construction
B00486045-I1-GC
02/24/2023
Permit issued — Structural
B00489186-I1-ST
02/03/2023
Signed off — Alteration
B00545995-I1
01/19/2023
Permit issued — Support of Excavation
B00545995-I1-SE
01/13/2023
Inspection — Certified Gas-Gas-Piping-Roughing
Certified
View inspection ↗
01/13/2023
Inspection — Certified Storm Drainage-ST-Piping-Roughing
Certified
View inspection ↗
01/13/2023
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Roughing
Certified
View inspection ↗
11/23/2022
Violation issued (ECB, closed)
Construction
11/04/2022
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Underground
Certified
View inspection ↗
Latest 60 of 125 events.
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWGeneral ConstructionPermit IssuedSHINE CONSTRUCTION & DEV09/09/2025
DOB NOWPlumbingSigned-offP.S.I. MECHANICAL12/19/2023
DOB NOWSupported ScaffoldPermit IssuedTOPLINE NYC CONTRACTING10/03/2023
DOB NOWSidewalk ShedPermit IssuedTOPLINE NYC CONTRACTING10/03/2023
DOB NOWConstruction FencePermit IssuedABCAT ASSOCIATES INC07/19/2023
DOB NOWGeneral ConstructionPermit IssuedABCAT ASSOCIATES INC02/24/2023
DOB NOWStructuralPermit IssuedABCAT ASSOCIATES INC02/24/2023
DOB NOWSupport of ExcavationSigned-offABCAT ASSOCIATES INC01/19/2023
DOB NOWSidewalk ShedPermit IssuedTOPLINE NYC CONTRACTING10/27/2022
DOB NOWSupported ScaffoldPermit IssuedTOPLINE NYC CONTRACTING10/26/2022
DOB NOWPlumbingSigned-offP.S.I. MECHANICAL10/24/2022
DOB NOWConstruction FencePermit IssuedABCAT ASSOCIATES INC08/16/2022
DOB NOWGeneral ConstructionPermit IssuedABCAT ASSOCIATES INC01/26/2022
DOB NOWStructuralPermit IssuedABCAT ASSOCIATES INC01/01/2022
DOB NOWSupported ScaffoldPermit IssuedTOPLINE NYC CONTRACTING08/05/2021
DOB NOWSidewalk ShedPermit IssuedTOPLINE NYC CONTRACTING07/27/2021
DOB NOWStructuralPermit IssuedABCAT ASSOCIATES INC07/06/2021
DOB NOWSidewalk ShedPermit IssuedTOPLINE NYC CONTRACTING05/05/2020
DOB NOWSidewalk ShedPermit IssuedTOPLINE NYC CONTRACTING03/25/2020
BISOTISSUEDGALLERY RESTORATION LTD02/06/2020
BISMHISSUEDGALLERY RESTORATION LTD01/31/2020
BISOTISSUEDGALLERY RESTORATION LTD01/29/2020
BISOTISSUEDGALLERY RESTORATION LTD01/03/2019
BISMHISSUEDGALLERY RESTORATION LTD12/03/2018
1 project · most recent 01/22/2025
Gas Storm Water/Sanitary
FiledStatusContractorScope
01/22/2025Signed-offP.S.I. MECHANICALGas, Storm, Water/Sanitary
2 projects · most recent 06/20/2025
General Wiring
FiledStatusContractorScope
06/20/2025CompleteINTERPHASE ELECTRIC CORP.General Wiring
03/19/2020Permit IssuedRICHARD NEU—
1 project · most recent 07/21/2022
Fence
FiledStatusContractorScope
07/21/2022Permit IssuedABCAT ASSOCIATES INCFence
▾Field Inspections (DOB CAP) — 10
DateTypeResultReport
11/14/2025Pass-Final CND-Occupancy InspectionPassView ↗
08/26/2024Fail-Final PL - Up to 9 Requested FloorsFailView ↗
02/23/2024Certified Storm Drainage-ST-Piping-RoughingCertifiedView ↗
02/23/2024Certified Storm Drainage-ST-Piping-UndergroundCertifiedView ↗
02/23/2024Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
12/12/2023Certified Water and Sanitary-WS-Sanitary Piping-UndergroundCertifiedView ↗
01/13/2023Certified Gas-Gas-Piping-RoughingCertifiedView ↗
01/13/2023Certified Storm Drainage-ST-Piping-RoughingCertifiedView ↗
01/13/2023Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
11/04/2022Certified Water and Sanitary-WS-Sanitary Piping-UndergroundCertifiedView ↗
▾Special Inspection Requirements (DOB NOW) — 35
DateRequirementInspectorRole
08/18/2025Structural Stability – Alterations of existing buildingsDENNIS GEORGEspecial
08/18/2025Fire-Resistant Penetrations and JointsDENNIS GEORGEspecial
08/18/2025Fire-Resistance Rated ConstructionDENNIS GEORGEprogress
08/18/2025Energy Code Compliance InspectionsDENNIS GEORGEprogress
08/18/2025Insulation placement and R valuesDENNIS GEORGEenergy_progress
08/18/2025Lighting in dwelling unitsDENNIS GEORGEenergy_progress
08/18/2025Air barrier - visual inspectionDENNIS GEORGEenergy_progress
08/18/2025Fenestration air leakageDENNIS GEORGEenergy_progress
08/18/2025VestibulesDENNIS GEORGEenergy_progress
01/10/2025HVAC-R and service water piping design and insulationDENNIS GEORGEenergy_progress
01/10/2025Fire-Resistant Penetrations and JointsDENNIS GEORGEspecial
01/10/2025Energy Code Compliance InspectionsDENNIS GEORGEprogress
12/15/2023Lighting in dwelling unitsDENNIS GEORGEenergy_progress
12/15/2023Air barrier - visual inspectionDENNIS GEORGEenergy_progress
12/15/2023Fenestration air leakageDENNIS GEORGEenergy_progress
12/15/2023VestibulesDENNIS GEORGEenergy_progress
12/15/2023Insulation placement and R valuesDENNIS GEORGEenergy_progress
12/15/2023Fire-Resistant Penetrations and JointsDENNIS GEORGEspecial
12/15/2023Energy Code Compliance InspectionsDENNIS GEORGEprogress
12/15/2023HVAC-R and service water piping design and insulationDENNIS GEORGEenergy_progress
12/15/2023Fire-Resistant Penetrations and JointsDENNIS GEORGEspecial
12/15/2023Structural Stability – Alterations of existing buildingsDENNIS GEORGEspecial
12/15/2023Energy Code Compliance InspectionsDENNIS GEORGEprogress
12/15/2023Fire-Resistance Rated ConstructionDENNIS GEORGEprogress
07/01/2021Post-installed AnchorsRuslan Solovyevspecial
Latest 25 of 35.
▾Documents — 160 on file (BIS + DOB NOW)
▸Plans & Drawings17
▸DOB NOWPlans/Sketch16
09/01/2026B00545995-I1Request digital key ↗
09/01/2026B00489186-I1Request digital key ↗
09/01/2026B00489186-P2Request digital key ↗
Showing 3 of 16 on file for this type
▸DOB NOWPlans/Sketch - Sidewalk Shed1
09/02/2026B00334761-I1Request digital key ↗
▸Applications & Permits25
▸DOB NOWLPC Approval/Permit12
09/01/2026B00489186-P1Open ↗
08/13/2026B00483403-P3Open ↗
08/13/2026B00484668-I1Open ↗
Showing 3 of 12 on file for this type
▸BISPLAN / WORK APPROVAL APPLICATION8
03/03/2022321804696Open ↗
02/02/2022321804696Open ↗
01/15/2022340682087Open ↗
Showing 3 of 8 on file for this type
▸BISWORK PERMIT APPLICATION4
02/14/2020321804696Open ↗
01/29/2020340682087Open ↗
01/11/2019321804696Open ↗
Showing 3 of 4 on file for this type
▸BISBPP-5 - Authorization to the Department of Transportation1
10/31/2024340913854Open ↗
▸Zoning, Tax Lot & Property Records1
▸DOB NOWZD1: DOB Zoning Diagram1
08/13/2026B00484724-I1Open ↗
▸Seals & Professional Certifications72
▸DOB NOWSpecial Inspector Seal & Signature24
09/02/2026B00486045-P1Open ↗
09/02/2026B00486045-P1Open ↗
09/01/2026B00489186-P1Open ↗
Showing 3 of 24 on file for this type
▸DOB NOWProgress Inspector Seal & Signature22
09/02/2026B00486045-P1Open ↗
09/02/2026B00486045-P1Open ↗
09/02/2026B00486045-P1Open ↗
Showing 3 of 22 on file for this type
▸DOB NOWDPL-1: Design Professional Seal & Signature17
09/01/2026B00545995-I1Open ↗
09/01/2026B00489186-P2Open ↗
09/01/2026B00489186-P1Open ↗
Showing 3 of 17 on file for this type
▸BISTECHNICAL REPORT: RESPONSIBILITY/CERTIFICATION5
12/03/2018321804696Open ↗
11/19/2018321804696Open ↗
11/19/2018321804696Open ↗
Showing 3 of 5 on file for this type
▸BISREQUIRED ITEMS CHECKLIST FOR PROFESSIONAL CERTIFICATION1
06/19/2019340682087Open ↗
▸BISPROFESSIONAL CERTIFICATION STATEMENT1
06/19/2019340682087Open ↗
▸BISAPPLICANT OWNER SIGNATURE1
10/31/2024340913854Open ↗
▸BISTECHNICAL REPORT STATEMENT OF RESPONSIBILITY1
06/19/2019340682087Open ↗
▸Trade Schedules & Equipment1
▸BISSCHEDULE B - PLUMBING/SPRINKLER/STANDPIPE1
07/17/2018321804696Open ↗
▸Safety & Tenant Protection3
▸BISSTREET TREE CHECKLIST2
11/21/2024340913854Open ↗
07/17/2018321804696Open ↗
▸BISBPP: STREET TREES SITE PLAN1
11/21/2024340913854Open ↗
▸Environmental & Asbestos11
▸DOB NOWDEP ACP-5: Asbestos Assessment Report6
08/29/2026B00484668-I1Open ↗
08/29/2026B00483403-P4Open ↗
08/29/2026B00483403-P3Open ↗
Showing 3 of 6 on file for this type
▸BISASBESTOS: COMPLETION OR CLOSEOUT (ACP20/21/5)2
06/19/2019340682087Open ↗
11/19/2018321804696Open ↗
▸DOB NOWDEP ACP-20/ACP-21: Asbestos Project Conditional Completion Form/Asbestos Project Completion Form2
09/01/2026B00489186-I1Open ↗
08/21/2026B00486045-I1Open ↗
▸BISASBESTOS: CERTIFICATION (DEP ACP5)1
12/03/2018321804696Open ↗
▸Energy Compliance6
▸BISTECHNICAL REPORT: ENERGY CODE PROGRESS INSPS3
12/03/2018321804696Open ↗
11/19/2018321804696Open ↗
07/17/2018321804696Open ↗
▸BISTECHNICAL REPORT: ENERGY CODE - RESPONSIBILITY2
11/13/2019340682087Open ↗
06/26/2019340682087Open ↗
▸DOB NOWEN2: As Built Energy Analysis.1
08/13/2026B00486045-I1Open ↗
▸Inspections & Test Reports5
▸BISTECHNICAL REPORT: RESPONSIBILITY5
11/13/2019340682087Open ↗
11/13/2019340682087Open ↗
11/13/2019340682087Open ↗
Showing 3 of 5 on file for this type
▸Approvals, Objections & Sign-offs4
▸BISLANDMARKS APPROVAL3
11/21/2024340913854Open ↗
06/19/2019340682087Open ↗
11/19/2018321804696Open ↗
▸BISBPP-8 - Request Items for Builders Pavement Plan Signoff1
10/31/2024340913854Open ↗
▸Cost, Insurance & Ownership3
▸BISCOST AFFIDAVIT3
06/19/2019340682087Open ↗
11/19/2018321804696Open ↗
07/17/2018321804696Open ↗
▸Filing & Intake Forms8
▸BISADDITIONAL INFORMATION4
02/17/2021340682087Open ↗
06/12/2020340682087Open ↗
06/12/2020340682087Open ↗
Showing 3 of 4 on file for this type
▸BISEFILING JOB APPLICATION COVER SHEET2
10/31/2024340913854Open ↗
06/19/2019340682087Open ↗
▸BISEFILING COVER SHEET1
07/17/2018321804696Open ↗
▸BISBPP: CHECKLIST IN LIEU OF PLANS-ALT31
10/31/2024340913854Open ↗
▸Other Documents4
▸BISBPP: PHOTOS-SIGNED/SEALED BY APPLICANT1
11/21/2024340913854Open ↗
▸BISRECORDS MGMT FEE PAYMENT RECEIPT1
10/31/2024340913854Open ↗
▸DOB NOWLocal Law 92/94 of 2019 Sustainable Roof Zone1
08/13/2026B00484724-I1Open ↗
▸DOB NOWAdjoining Owners Notification1
08/13/2026B00545995-I1Open ↗