← Back
Two family brick
266 MONROE STREET
BROOKLYN · BIN 3051394
💬 Discuss this project
1882Year Built
2Stories
B1Building Class
R6BZoning
2,400 sfGross Floor Area
2Units
Rent Stabilized9 Open Violations ▸FDNY Report ↗
Two family brick · 2,000 sf lot · 1.2 FAR built · Flood zone X
Locations of Work
ArchitectureStructuralMechanicalFire Protection
Floor 225p · 1 filing · 20 docs
Floor 124p · 1 filing · 20 docs
Cellar24p · 1 filing · 20 docs
Basement23p · 1 filing · 20 docs
1 job · most recent 12/01/2023
Heating and Air Conditioning Systems
FiledStatusContractorScopeMake / Model / Capacity
12/01/2023Signed-offSUPREME RENOVATION A2Z INHeating and Air Conditioning Systems
Heat / Cool
Mitsubishi Electric SUZ-KA24NAHZ 24,000 BTU · Condensing Unit ×6
1 job · most recent 12/01/2023
Gas Water/Sanitary
FiledStatusContractorScope
12/01/2023Signed-offSMART PLBG & HTG CORPGas, Water/Sanitary
2 jobs · most recent 06/22/2023
General Wiring
FiledStatusContractorScope
06/22/2023CompleteBROOKYLN SOLARWORKS, LLC—
02/21/2023CompleteLENS ELECTRIC, INCGeneral Wiring
1 job · most recent 12/01/2023
Fence
FiledStatusContractorScope
12/01/2023Permit IssuedSUPREME RENOVATION A2Z INFence
Building Lifecycle
All (97)Filed (8)Permit Issued (9)Signed Off (4)Violation (15)Inspection (6)Objection (26)Special Inspection (29)
05/01/2024
Inspection — Pass-Final CND-Occupancy Inspection
Pass
View inspection ↗
04/27/2024
Signed off — Alteration CO
Convert from three to two family residence. Partition and mechanical work. New steps to rear yard. Replace windows.
B08020615-S1
04/22/2024
Special inspection requirement — Lighting in dwelling units
Sarah Jacoby
04/22/2024
Special inspection requirement — HVAC-R and service water heating system controls
ALBERT ZIRINO
04/22/2024
Special inspection requirement — Air barrier - visual inspection
Sarah Jacoby
04/22/2024
Special inspection requirement — HVAC-R and service water piping design and insulation
ALBERT ZIRINO
04/22/2024
Special inspection requirement — HVAC-R and service water heating equipment
ALBERT ZIRINO
04/22/2024
Special inspection requirement — Fenestration and door U-factor and product ratings
Sarah Jacoby
04/22/2024
Special inspection requirement — Fire-Resistant Penetrations and Joints
Sarah Jacoby
04/22/2024
Special inspection requirement — Mechanical Systems
ALBERT ZIRINO
04/22/2024
Special inspection requirement — Structural Stability – Alterations of existing buildings
Celin Munoz
04/22/2024
Special inspection requirement — Energy Code Compliance Inspections
Sarah Jacoby
04/22/2024
Special inspection requirement — Final
Sarah Jacoby
04/22/2024
Special inspection requirement — Maintenance information
ALBERT ZIRINO
04/22/2024
Special inspection requirement — Permanent certificate
ALBERT ZIRINO
04/22/2024
Special inspection requirement — Fenestration areas
Sarah Jacoby
04/18/2024
Signed off — Alteration CO
Convert from three to two family residence. Partition and mechanical work. New steps to rear yard. Replace windows.
B08020615-S3
04/15/2024
Objection raised — Zoning
04/15/2024
Objection resolved — Addressed
04/15/2024
Objection raised — Zoning
04/15/2024
Objection resolved — Addressed
04/08/2024
Objection resolved — Addressed
03/28/2024
Signed off — Alteration CO
Convert from three to two family residence. Partition and mechanical work. New steps to rear yard. Replace windows.
B08020615-S5
02/09/2024
Inspection — Certified Sprinkler-SP-Fixtures-Finish
Certified
View inspection ↗
02/09/2024
Inspection — Pass-Final CND-Occupancy Inspection
Pass
View inspection ↗
02/07/2024
Inspection — Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic Test
Certified
View inspection ↗
01/19/2024
Permit issued — Mechanical Systems
B08020615-I1-GC
01/19/2024
Permit issued — Mechanical Systems
B08020615-I1-MS
01/19/2024
Permit issued — Construction Fence
B08020615-S5-FN
12/15/2023
Signed off — Alteration CO
Convert from three to two family residence. Partition and mechanical work. New steps to rear yard. Replace windows.
B08020615-S2
12/05/2023
Objection raised — Fire_Protection
12/01/2023
Filed — Alteration CO
Convert from three to two family residence. Partition and mechanical work. New steps to rear yard. Replace windows.
B08020615-P3
06/08/2023
Inspection — Certified Gas-Gas-Piping-Roughing
Certified
View inspection ↗
06/05/2023
Inspection — Certified Remove/Cap - work done in accordance with code
Certified
View inspection ↗
06/04/2023
Special inspection requirement — Energy Code Compliance Inspections
Sarah Jacoby
06/04/2023
Special inspection requirement — HVAC-R and service water heating system controls
ALBERT ZIRINO
06/04/2023
Special inspection requirement — HVAC-R and service water heating equipment
ALBERT ZIRINO
06/04/2023
Special inspection requirement — HVAC-R and service water piping design and insulation
ALBERT ZIRINO
06/02/2023
Filed — Alteration CO
Convert from three to two family residence. Partition and mechanical work. New steps to rear yard. Replace windows.
B08020615-P2
03/24/2023
Violation issued (HPD, closed)
A
03/01/2023
Permit issued — Construction Fence
B08020615-S5-FN
02/28/2023
Filed — Alteration CO
Convert from three to two family residence. Partition and mechanical work. New steps to rear yard. Replace windows.
B08020615-S5
02/24/2023
Permit issued — Structural
B08020615-S2-ST
02/22/2023
Permit issued — Plumbing
B08020615-S1-PL
02/16/2023
Permit issued — Sprinklers
B08020615-S3-EW-SP
02/13/2023
Permit issued — General Construction
B08020615-I1-MS
02/13/2023
Permit issued — General Construction
B08020615-I1-GC
02/02/2023
Filed — Alteration CO
Convert from three to two family residence. Partition and mechanical work. New steps to rear yard. Replace windows.
B08020615-S2
02/01/2023
Filed — Alteration CO
Convert from three to two family residence. Partition and mechanical work. New steps to rear yard. Replace windows.
B08020615-S3
01/31/2023
Special inspection requirement — Structural Wood Frame
Celin Munoz
01/31/2023
Special inspection requirement — Fire-Resistant Penetrations and Joints
Sarah Jacoby
01/31/2023
Special inspection requirement — Post-installed Anchors
Celin Munoz
01/31/2023
Special inspection requirement — Structural Steel - High Strength Bolting
Celin Munoz
01/31/2023
Special inspection requirement — Structural Steel - Welding
Celin Munoz
01/31/2023
Special inspection requirement — Concrete - Cast-In-Place
Celin Munoz
01/30/2023
Filed — Alteration CO
Convert from three to two family residence. Partition and mechanical work. New steps to rear yard. Replace windows.
B08020615-P1
01/30/2023
Special inspection requirement — Structural Steel - Details
Celin Munoz
01/26/2023
Filed — Alteration CO
Convert from three to two family residence. Partition and mechanical work. New steps to rear yard. Replace windows.
B08020615-S1
01/26/2023
Special inspection requirement — Construction Operations Influencing Adjacent Structures
Celin Munoz
01/26/2023
Special inspection requirement — Structural Stability – Alterations of existing buildings
Celin Munoz
Latest 60 of 97 events.
▾Sales History (ACRIS)
DatePriceUnitSeller → Buyer$/sf
12/06/2021$1.4M—— → —$588/sf building
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
SARAH JACOBY ARCHITECT, DPC712/01/2023
ANZ CONSULTING ENGINEERING, PLLC102/01/2023
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
JOSEPH FELLNER803/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
SUPREME RENOVATION A2Z INGeneral Contractor1507/08/2026
HF GROUP PLMBG & SPNKLERFire Protection107/08/2026
SMART PLBG & HTG CORPPlumbing107/08/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
ANZ CONSULTING ENGINEERIN3946312/01/2023
CELIN MUNOZ CONSULTING EN1064312/01/2023
SARAH JACOBY ARCHITECT5641412/01/2023
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWMechanical SystemsPermit IssuedSUPREME RENOVATION A2Z IN01/19/2024
DOB NOWMechanical SystemsSigned-offSUPREME RENOVATION A2Z IN01/19/2024
DOB NOWConstruction FenceSigned-offSUPREME RENOVATION A2Z IN01/19/2024
DOB NOWConstruction FenceSigned-offSUPREME RENOVATION A2Z IN03/01/2023
DOB NOWStructuralSigned-offSUPREME RENOVATION A2Z IN02/24/2023
DOB NOWPlumbingSigned-offSMART PLBG & HTG CORP02/22/2023
DOB NOWSprinklersSigned-offHF GROUP PLMBG & SPNKLER02/16/2023
DOB NOWGeneral ConstructionSigned-offSUPREME RENOVATION A2Z IN02/13/2023
DOB NOWGeneral ConstructionPermit IssuedSUPREME RENOVATION A2Z IN02/13/2023
BISOTISSUEDBROOKLYN SOLARWORKS LLC02/07/2023
▾Field Inspections (DOB CAP) — 6
DateTypeResultReport
05/01/2024Pass-Final CND-Occupancy InspectionPassView ↗
02/09/2024Certified Sprinkler-SP-Fixtures-FinishCertifiedView ↗
02/09/2024Pass-Final CND-Occupancy InspectionPassView ↗
02/07/2024Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic TestCertifiedView ↗
06/08/2023Certified Gas-Gas-Piping-RoughingCertifiedView ↗
06/05/2023Certified Remove/Cap - work done in accordance with codeCertifiedView ↗
▾Special Inspection Requirements (DOB NOW) — 29
DateRequirementInspectorRole
04/22/2024Lighting in dwelling unitsSarah Jacobyenergy_progress
04/22/2024HVAC-R and service water heating system controlsALBERT ZIRINOenergy_progress
04/22/2024Air barrier - visual inspectionSarah Jacobyenergy_progress
04/22/2024HVAC-R and service water piping design and insulationALBERT ZIRINOenergy_progress
04/22/2024HVAC-R and service water heating equipmentALBERT ZIRINOenergy_progress
04/22/2024Fenestration and door U-factor and product ratingsSarah Jacobyenergy_progress
04/22/2024Fire-Resistant Penetrations and JointsSarah Jacobyspecial
04/22/2024Mechanical SystemsALBERT ZIRINOspecial
04/22/2024Structural Stability – Alterations of existing buildingsCelin Munozspecial
04/22/2024Energy Code Compliance InspectionsSarah Jacobyprogress
04/22/2024FinalSarah Jacobyprogress
04/22/2024Maintenance informationALBERT ZIRINOenergy_progress
04/22/2024Permanent certificateALBERT ZIRINOenergy_progress
04/22/2024Fenestration areasSarah Jacobyenergy_progress
06/04/2023Energy Code Compliance InspectionsSarah Jacobyprogress
06/04/2023HVAC-R and service water heating system controlsALBERT ZIRINOenergy_progress
06/04/2023HVAC-R and service water heating equipmentALBERT ZIRINOenergy_progress
06/04/2023HVAC-R and service water piping design and insulationALBERT ZIRINOenergy_progress
01/31/2023Structural Wood FrameCelin Munozprogress
01/31/2023Fire-Resistant Penetrations and JointsSarah Jacobyspecial
01/31/2023Post-installed AnchorsCelin Munozspecial
01/31/2023Structural Steel - High Strength BoltingCelin Munozspecial
01/31/2023Structural Steel - WeldingCelin Munozspecial
01/31/2023Concrete - Cast-In-PlaceCelin Munozspecial
01/30/2023Structural Steel - DetailsCelin Munozspecial
Latest 25 of 29.
▾Documents — 78 on file (BIS + DOB NOW)
▸Plans & Drawings8
▸DOB NOWPlans/Sketch8
08/27/2026B08020615-S5Request digital key ↗
08/27/2026B08020615-S1Request digital key ↗
08/27/2026B08020615-S2Request digital key ↗
Showing 3 of 8 on file for this type
▸Applications & Permits8
▸DOB NOWLPC Approval/Permit6
08/13/2026B08020615-S2Open ↗
08/13/2026B08020615-P2Open ↗
08/13/2026B08020615-P3Open ↗
Showing 3 of 6 on file for this type
▸BISWORK PERMIT APPLICATION1
02/07/2023340878777Open ↗
▸BISPLAN / WORK APPROVAL APPLICATION1
02/06/2023340878777Open ↗
▸Zoning, Tax Lot & Property Records1
▸DOB NOWHouse Number Verification: TOPO Stamp1
08/13/2026B08020615-I1Open ↗
▸Seals & Professional Certifications34
▸DOB NOWProgress Inspector Seal & Signature13
09/01/2026B08020615-S1Open ↗
09/01/2026B08020615-S1Open ↗
09/01/2026B08020615-S1Open ↗
Showing 3 of 13 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature12
08/27/2026B08020615-S3Open ↗
08/27/2026B08020615-S3Open ↗
08/25/2026B08020615-I1Open ↗
Showing 3 of 12 on file for this type
▸DOB NOWDPL-1: Design Professional Seal & Signature8
08/27/2026B08020615-S5Open ↗
08/27/2026B08020615-P1Open ↗
08/27/2026B08020615-I1Open ↗
Showing 3 of 8 on file for this type
▸BISAPPLICANT OWNER SIGNATURE1
02/06/2023340878777Open ↗
▸Safety & Tenant Protection4
▸DOB NOWStreet Tree Checklist3
08/13/2026B08020615-P3Open ↗
08/13/2026B08020615-P1Open ↗
08/13/2026B08020615-I1Open ↗
▸BISTPP1: TENANT PROTECTION PLAN1
02/07/2023340878777Open ↗
▸Environmental & Asbestos6
▸DOB NOWDEP ACP-20/ACP-21: Asbestos Project Conditional Completion Form/Asbestos Project Completion Form5
08/27/2026B08020615-S1Open ↗
08/27/2026B08020615-S2Open ↗
08/27/2026B08020615-S3Open ↗
Showing 3 of 5 on file for this type
▸BISASBESTOS: CERTIFICATION (DEP ACP5)1
02/06/2023340878777Open ↗
▸Energy Compliance5
▸BISTECHNICAL REPORT: ENERGY CODE - RESPONSIBILITY2
08/16/2023340878777Open ↗
02/06/2023340878777Open ↗
▸BISSOLAR TAX ABATEMENT APPLICATION1
08/17/2023340878777Open ↗
▸BISPTA4: SOLAR TAX ABATEMENT APPLICATION (PRELIMINARY)1
02/06/2023340878777Open ↗
▸BISAS-BUILT ENERGY ANALYSIS1
08/16/2023340878777Open ↗
▸Inspections & Test Reports2
▸BISTECHNICAL REPORT: RESPONSIBILITY2
08/16/2023340878777Open ↗
02/06/2023340878777Open ↗
▸Approvals, Objections & Sign-offs4
▸BISLANDMARKS APPROVAL2
08/17/2023340878777Open ↗
02/06/2023340878777Open ↗
▸BISLETTERS - SUPPORTING DOCUMENTATION1
08/17/2023340878777Open ↗
▸BISCERTIFICATE OF OCCUPANCY/LOC: REQUEST1
08/17/2023340878777Open ↗
▸Cost, Insurance & Ownership2
▸BISCOST AFFIDAVIT2
08/16/2023340878777Open ↗
02/06/2023340878777Open ↗
▸Filing & Intake Forms1
▸BISEFILING JOB APPLICATION COVER SHEET1
02/06/2023340878777Open ↗
▸Other Documents3
▸DOB NOWProperty Ownership Certification3
08/27/2026B08020615-P1Open ↗
08/14/2026B08020615-I1Open ↗
08/14/2026B08020615-P3Open ↗