Condo, residential unit in elevator building
266 WEST 115 STREET
MANHATTAN · Harlem (South) · BIN 1087692
💬 Discuss this project
2005Year Built
8Stories
R4Building Class
R7AZoning
17,931 sfGross Floor Area
15Units
Rent Stabilized1 Open Violation ▸FISP: SAFE
Condo, residential unit in elevator building · 5,046 sf lot · 3.55 FAR built · Flood zone X
Locations of Work
ArchitectureGeneralOther
Roof3p · 1 filing · 11 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
HSC MANAGEMENT CORP.703/22/2026
OWNER OF 266 WEST 115 STR103/22/2026
266 WEST 115TH STREET1903/21/2026
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
RAND ENGINEERING & ARCHITECTURE DPC207/29/2022
GREEN DESIGN105/05/2021
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
JULIAN A. GOMEZ403/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
GREGORY PAPANTONIOUElectrical203/21/2026
A W R GROUP INCGeneral Contractor203/21/2026
EVEREST SCAFFOLDING INCGeneral Contractor203/21/2026
ANDAMIO SCAFFOLDING LLCGeneral Contractor107/08/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
RAND ENGINEERING & ARCHIT266207/29/2022
Building Lifecycle
All (54)Filed (3)Permit Issued (3)Signed Off (2)Facade (FISP) (6)Violation (22)Special Inspection (18)
11/17/2025
Violation issued (HPD, closed)
I
06/13/2025
Violation issued (HPD, closed)
A
11/22/2024
Violation issued (HPD, closed)
I
11/02/2022
Violation issued (HPD, closed)
I
08/04/2022
Cycle 9 facade report signed — SAFE
08/03/2022
Signed off — Alteration
8th Cycle Facade Repair program. No change to use, egress or occupancy.
M00462911-I1
08/02/2022
Special inspection requirement — Masonry
John Monroe
08/02/2022
Special inspection requirement — Post-installed Anchors
John Monroe
08/02/2022
Special inspection requirement — Energy Code Compliance Inspections
John Monroe
08/02/2022
Special inspection requirement — Final
John Monroe
08/02/2022
Special inspection requirement — Insulation placement and R values
John Monroe
08/02/2022
Special inspection requirement — Fenestration areas
John Monroe
08/02/2022
Special inspection requirement — Fenestration and door U-factor and product ratings
John Monroe
08/02/2022
Special inspection requirement — Air barrier - visual inspection
John Monroe
08/02/2022
Special inspection requirement — Fenestration air leakage
John Monroe
07/29/2022
Filed — Alteration
8th Cycle Facade Repair program. No change to use, egress or occupancy.
M00462911-P1
06/10/2022
Cycle 9 facade report submitted
06/03/2022
Cycle 9 facade inspection completed
06/03/2022
Special inspection requirement — Masonry
John Monroe
06/03/2022
Special inspection requirement — Post-installed Anchors
John Monroe
06/03/2022
Special inspection requirement — Energy Code Compliance Inspections
John Monroe
06/03/2022
Special inspection requirement — Final
John Monroe
06/03/2022
Special inspection requirement — Fenestration air leakage
John Monroe
06/03/2022
Special inspection requirement — Fenestration and door U-factor and product ratings
John Monroe
06/03/2022
Special inspection requirement — Fenestration areas
John Monroe
06/03/2022
Special inspection requirement — Insulation placement and R values
John Monroe
06/03/2022
Special inspection requirement — Air barrier - visual inspection
John Monroe
03/09/2022
Violation issued (HPD, closed)
A
03/09/2022
Violation issued (HPD, closed)
I
12/15/2021
Signed off — Alteration
M00515733-I1
09/20/2021
Permit issued — Sidewalk Shed
M00515733-I1-SH
05/05/2021
Filed — Alteration
M00515733-I1
05/05/2021
Permit issued — Sidewalk Shed
M00515733-I1-SH
04/27/2021
Permit issued — General Construction
M00462911-I1-GC
04/08/2021
Filed — Alteration
8th Cycle Facade Repair program. No change to use, egress or occupancy.
M00462911-I1
10/25/2018
Violation issued (HPD, closed)
I
02/02/2018
Cycle 8 facade report submitted
01/31/2018
Cycle 8 facade report signed — SWARMP
01/09/2018
Cycle 8 facade inspection completed
11/08/2017
Violation issued (DOB, closed)
V*-DOB VIOLATION - Resolved
10/19/2015
Violation issued (HPD, closed)
I
12/19/2014
Violation issued (DOB, closed)
V*-DOB VIOLATION - Resolved
10/17/2013
Violation issued (DOB, closed)
V*-DOB VIOLATION - Resolved
03/01/2013
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
03/01/2013
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
09/10/2012
Violation issued (DOB, closed)
V*-DOB VIOLATION - Resolved
08/27/2012
Violation issued (HPD, open)
B
08/31/2011
Violation issued (DOB, closed)
V*-DOB VIOLATION - Resolved
01/23/2009
Violation issued (DOB, closed)
V*-DOB VIOLATION - Resolved
01/01/2009
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
01/01/2009
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
03/21/2008
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
04/23/2001
Violation issued (ECB, closed)
Zoning
04/04/2001
Violation issued (ECB, closed)
Zoning
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWSidewalk ShedSigned-offANDAMIO SCAFFOLDING LLC09/20/2021
DOB NOWSidewalk ShedSigned-offEVEREST SCAFFOLDING INC05/05/2021
DOB NOWGeneral ConstructionSigned-offA W R GROUP INC04/27/2021
BISSDISSUEDDC BUILDING SERVICES INC03/26/2010
BIS—ISSUEDVERTICLE DESIGN CONSTR. CORP07/30/2008
BIS—ISSUEDVERTICLE DESIGN CONSTR. CORP07/02/2007
BISSDISSUEDCASE PLUMBING LLC02/15/2007
BISBLISSUEDMARATHON MECHANICAL LLC02/08/2007
BISPLISSUEDMARATHON MECHANICAL LLC12/06/2006
BISEQISSUEDVERTICLE DESIGN CONXTRUCTION11/30/2006
BISEQISSUEDPERIMETER BRIDGE & SCAFFOLD01/05/2006
BISEQISSUEDVERTICLE DESIGN CONXTRUCTION12/16/2005
BIS—RE-ISSUEDVERTICLE DESIGN CONSTR. CORP10/25/2005
BISPLISSUEDMARATHON MECHANICAL LLC08/12/2005
BISEQISSUEDVERTICLE DESIGN CONXTRUCTION08/02/2005
2 projects · most recent 05/12/2021
FiledStatusContractorScope
05/12/2021CompleteBOROWIDE ELECT'L CONTR'S—
05/04/2021CompleteBOROWIDE ELECT'L CONTR'S—
▾Special Inspection Requirements (DOB NOW) — 18
DateRequirementInspectorRole
08/02/2022MasonryJohn Monroespecial
08/02/2022Post-installed AnchorsJohn Monroespecial
08/02/2022Energy Code Compliance InspectionsJohn Monroeprogress
08/02/2022FinalJohn Monroeprogress
08/02/2022Insulation placement and R valuesJohn Monroeenergy_progress
08/02/2022Fenestration areasJohn Monroeenergy_progress
08/02/2022Fenestration and door U-factor and product ratingsJohn Monroeenergy_progress
08/02/2022Air barrier - visual inspectionJohn Monroeenergy_progress
08/02/2022Fenestration air leakageJohn Monroeenergy_progress
06/03/2022MasonryJohn Monroespecial
06/03/2022Post-installed AnchorsJohn Monroespecial
06/03/2022Energy Code Compliance InspectionsJohn Monroeprogress
06/03/2022FinalJohn Monroeprogress
06/03/2022Fenestration air leakageJohn Monroeenergy_progress
06/03/2022Fenestration and door U-factor and product ratingsJohn Monroeenergy_progress
06/03/2022Fenestration areasJohn Monroeenergy_progress
06/03/2022Insulation placement and R valuesJohn Monroeenergy_progress
06/03/2022Air barrier - visual inspectionJohn Monroeenergy_progress
▾Documents — 13 on file (BIS + DOB NOW)
▸Plans & Drawings3
▸DOB NOWPlans/Sketch - General Construction2
09/03/2026M00462911-I1Request digital key ↗
09/03/2026M00462911-P1Request digital key ↗
▸DOB NOWPlans/Sketch1
09/03/2026M00515733-I1Request digital key ↗
▸Seals & Professional Certifications9
▸DOB NOWProgress Inspector Seal & Signature4
08/25/2026M00462911-I1Open ↗
08/25/2026M00462911-I1Open ↗
08/23/2026M00462911-P1Open ↗
Showing 3 of 4 on file for this type
▸DOB NOWDPL-1: Design Professional Seal & Signature3
09/03/2026M00515733-I1Open ↗
08/13/2026M00462911-I1Open ↗
08/13/2026M00462911-P1Open ↗
▸DOB NOWSpecial Inspector Seal & Signature2
08/25/2026M00462911-I1Open ↗
08/23/2026M00462911-P1Open ↗
▸Energy Compliance1
▸DOB NOWEN2: As Built Energy Analysis.1
08/13/2026M00462911-I1Open ↗