← Back
Hospital, sanitarium, mental institution
2661 OCEAN PARKWAY
BROOKLYN · BIN 3425771
💬 Discuss this project
1931Year Built
14Stories
I1Building Class
R4Zoning
1,085,103 sfGross Floor Area
2Units
LL97 Covered15 Open Violations 8 unresolved · 7 paperwork only ▸FDNY Report ↗
Hospital, sanitarium, mental institution · 455,333 sf lot · 2.38 FAR built · Flood zone X500
Locations of Work
MechanicalPlumbingFire Protection
Floor 33p · 1 filing · 16 docs
Floor 2
Floor 1
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
CONEY ISLAND HOSPITAL6807/08/2026
TURNER CONSTRUCTION CO403/22/2026
TRI BOROUGH SCAFFOLDING103/22/2026
ON POINT HVAC CORP103/22/2026
OUTSOURCE CONSULTANTS103/22/2026
VIK XS SERVICES203/21/2026
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
DOUGLAS P. GONZALEZ103/10/2026
Moody Nolan403/05/2026
INSIGHT CIVIL ENGINEERING, PLLC811/04/2024
BR+A CONSULTING ENGINEERS401/05/2023
JMV ARCHITECT, PLLC109/22/2022
AFRIDI ASSOCIATES205/24/2019
DONALD VAN GERVE PE108/16/2018
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
OUTSOURCE CONSULTANTS, INC.2403/21/2026
A1 EXPEDITING SERVICE403/21/2026
MUNICIPAL BUILDING CONSULTANTS103/21/2026
JMV ASSOCIATES LLC103/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
TURNER MCKISSACK, A JOINTGeneral Contractor1807/08/2026
UNITED HOISTING & SCAFF CGeneral Contractor1607/08/2026
ALEX PRIMIANO.JRElectrical503/21/2026
JOE CINA & SONS CONTRACTGeneral Contractor503/22/2026
MULTI-PHASE ELECL SVCS 004120General Contractor203/22/2026
PRIMIANO CORP DBAElectrical103/22/2026
A.S.R. ELEC'L CONTR'G INCElectrical103/22/2026
MACCARONE PLUMBING INCPlumbing107/08/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
FUTURE TECH CONSULTANTS O589401/05/2023
Building Lifecycle
All (162)Filed (21)Permit Issued (27)Signed Off (13)Violation (60)Inspection (6)Objection (12)Special Inspection (23)
03/10/2026
Filed — Alteration
STRUCTURAL FILING FOR ADDITION OF MODULAR CEILING SYSTEM SUPPORT & MEDICAL EQUIP SUPPORT ON FL 3 CEILING AS SHOWN HERWITH. NO CHANGES TO EGRESS, OCCIPANCY OR USE
B01297605-S4
03/09/2026
Special inspection requirement — Designated Seismic System
03/05/2026
Filed — Alteration
STRUCTURAL FILING FOR ADDITION OF MODULAR CEILING SYSTEM SUPPORT & MEDICAL EQUIP SUPPORT ON FL 3 CEILING AS SHOWN HERWITH. NO CHANGES TO EGRESS, OCCIPANCY OR USE
B01297605-S3
02/26/2026
Filed — Alteration
STRUCTURAL FILING FOR ADDITION OF MODULAR CEILING SYSTEM SUPPORT & MEDICAL EQUIP SUPPORT ON FL 3 CEILING AS SHOWN HERWITH. NO CHANGES TO EGRESS, OCCIPANCY OR USE
B01297605-S2
02/13/2026
Filed — Alteration
STRUCTURAL FILING FOR ADDITION OF MODULAR CEILING SYSTEM SUPPORT & MEDICAL EQUIP SUPPORT ON FL 3 CEILING AS SHOWN HERWITH. NO CHANGES TO EGRESS, OCCIPANCY OR USE
B01297605-S1
02/02/2026
Special inspection requirement — Post-installed Anchors
02/02/2026
Special inspection requirement — Structural Stability – Alterations of existing buildings
02/02/2026
Special inspection requirement — Structural Steel - Welding
02/02/2026
Special inspection requirement — Structural Steel - High Strength Bolting
02/02/2026
Special inspection requirement — Structural Steel - Details
02/02/2026
Special inspection requirement — Preliminary
01/28/2026
Filed — Alteration
STRUCTURAL FILING FOR ADDITION OF MODULAR CEILING SYSTEM SUPPORT & MEDICAL EQUIP SUPPORT ON FL 3 CEILING AS SHOWN HERWITH. NO CHANGES TO EGRESS, OCCIPANCY OR USE
B01297605-I1
01/22/2026
Special inspection requirement — Fire-Resistant Penetrations and Joints
01/22/2026
Special inspection requirement — Fire-Resistant Penetrations and Joints
11/14/2025
Signed off — Alteration
B01134189-I1
11/14/2025
Signed off — Alteration
B00466404-I1
11/14/2025
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
11/14/2025
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
11/14/2025
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
11/14/2025
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
11/14/2025
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
11/14/2025
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
11/14/2025
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
11/14/2025
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
11/14/2025
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
11/14/2025
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
11/14/2025
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
11/14/2025
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
11/14/2025
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
11/14/2025
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
11/14/2025
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
11/14/2025
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
11/14/2025
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
11/14/2025
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
11/14/2025
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
10/21/2025
Signed off — Alteration
B00472582-I1
10/17/2025
Inspection — Pass-Final Curb Cut Non-Directive 14
Pass
View inspection ↗
10/10/2025
Signed off — Alteration
B00472625-I1
10/10/2025
Signed off — Alteration
B00472630-I1
10/03/2025
Signed off — Alteration
B00070597-I1
10/03/2025
Special inspection requirement — Sprinkler Systems
10/03/2025
Special inspection requirement — Final
10/02/2025
Inspection — Pass-Final Curb Cut Non-Directive 14
Pass
View inspection ↗
08/19/2025
Signed off — Alteration
B00472530-I1
08/18/2025
Signed off — Alteration
B00472565-I1
08/18/2025
Signed off — Alteration
B00472637-I1
07/31/2025
Inspection — Pass-Final Curb Cut Non-Directive 14
Pass
View inspection ↗
01/22/2025
Inspection — Certified Storm Drainage-ST-Fixtures-Finish
Certified
View inspection ↗
12/20/2024
Inspection — Certified Storm Drainage-ST-Piping-Underground
Certified
View inspection ↗
12/04/2024
Permit issued — Plumbing
B01134189-I1-PL
11/04/2024
Filed — Alteration
B01134189-I1
10/31/2024
Permit issued — Construction Fence
B00070597-I1-FN
09/23/2024
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
09/23/2024
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
09/23/2024
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
09/23/2024
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
09/23/2024
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
09/23/2024
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
09/23/2024
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
09/23/2024
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
Latest 60 of 162 events.
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWPlumbingSigned-offMACCARONE PLUMBING INC12/04/2024
DOB NOWConstruction FenceSigned-offTURNER MCKISSACK, A JOINT10/31/2024
DOB NOWConstruction FenceSigned-offTURNER MCKISSACK, A JOINT10/19/2023
DOB NOWBoiler EquipmentSigned-offCHAMPION COMBUSTION CORP12/13/2022
DOB NOWConstruction FenceSigned-offTURNER MCKISSACK, A JOINT10/19/2022
DOB NOWCurb CutSigned-offTURNER MCKISSACK, A JOINT12/17/2021
DOB NOWCurb CutSigned-offTURNER MCKISSACK, A JOINT12/17/2021
DOB NOWCurb CutSigned-offTURNER MCKISSACK, A JOINT12/17/2021
DOB NOWCurb CutSigned-offTURNER MCKISSACK, A JOINT12/17/2021
DOB NOWCurb CutSigned-offTURNER MCKISSACK, A JOINT12/17/2021
DOB NOWCurb CutSigned-offTURNER MCKISSACK, A JOINT12/17/2021
DOB NOWCurb CutSigned-offTURNER MCKISSACK, A JOINT12/17/2021
DOB NOWConstruction FencePermit IssuedUNITED HOISTING & SCAFF C12/07/2021
DOB NOWSidewalk ShedSigned-offUNITED HOISTING & SCAFF C12/07/2021
DOB NOWConstruction FenceSigned-offTURNER MCKISSACK, A JOINT10/27/2021
DOB NOWBoiler EquipmentSigned-offCHAMPION COMBUSTION CORP09/17/2021
DOB NOWBoiler EquipmentSigned-offCHAMPION COMBUSTION CORP09/17/2021
DOB NOWBoiler EquipmentSigned-offCHAMPION COMBUSTION CORP02/04/2021
DOB NOWConstruction FencePermit IssuedUNITED HOISTING & SCAFF C01/21/2021
DOB NOWSidewalk ShedSigned-offUNITED HOISTING & SCAFF C01/19/2021
DOB NOWSidewalk ShedSigned-offUNITED HOISTING & SCAFF C12/23/2019
DOB NOWConstruction FencePermit IssuedUNITED HOISTING & SCAFF C12/16/2019
DOB NOWConstruction FenceSigned-offTURNER MCKISSACK, A JOINT10/29/2019
DOB NOWConstruction FenceSigned-offTURNER MCKISSACK, A JOINT09/09/2019
DOB NOWSidewalk ShedSigned-offUNITED HOISTING & SCAFF C05/28/2019
DOB NOWConstruction FencePermit IssuedUNITED HOISTING & SCAFF C05/28/2019
DOB NOWConstruction FenceSigned-offTURNER MCKISSACK, A JOINT09/06/2018
BISOTISSUEDTURNER MCKISSACK, A JOINT10/21/2025
BIS—ISSUEDTURNER MCKISSACK, A JOINT10/21/2025
BIS—ISSUEDTURNER MCKISSACK, A JOINT10/21/2025
BISSDISSUEDRAEL AUTOMATIC SPR.CO INC02/06/2025
BISSPISSUEDRAEL AUTOMATIC SPR. CO.IN02/06/2025
BIS—ISSUEDTURNER MCKISSACK, A JOINT10/29/2024
BIS—ISSUEDTURNER MCKISSACK, A JOINT10/22/2024
BISOTISSUEDTURNER MCKISSACK, A JOINT10/22/2024
BIS—ISSUEDTURNER MCKISSACK, A JOINT10/22/2024
BISPLISSUEDALLIANCE PLUMBING CORP08/23/2024
BIS—ISSUEDTURNER MCKISSACK, A JOINT08/02/2024
BIS—ISSUEDTURNER MCKISSACK, A JOINT08/02/2024
BISEQISSUEDUNITED HOISTING & SCAFF C06/27/2024
+ 37 more permits on file
1 project · most recent 03/10/2026
Medical Gas Water/Sanitary
FiledStatusContractorScope
03/10/2026——Medical Gas, Water/Sanitary
7 projects · most recent 09/11/2025
General Wiring HVAC Wiring Lighting
FiledStatusContractorScope
09/11/2025CompletePRIMIANO CORP DBAGeneral Wiring
08/09/2022CompleteLCJ ELEC'L CONTR'S INC—
07/07/2021CompleteE-J ELEC. INSTALLATION CO—
12/01/2020CompleteMULTI-PHASE ELEC'L SVCSHVAC Wiring
03/20/2020Permit IssuedTRANSEL ELEV. & ELEC. INCGeneral Wiring
02/18/2020CompleteA.S.R. ELEC'L CONTR'G INCGeneral Wiring, Lighting
01/10/2019CancelledVERDE ELECTRIC CORP.—
1 project · most recent 03/10/2026
Steel Concrete
FiledStatusContractorScope
03/10/2026——Steel, Concrete
▾Field Inspections (DOB CAP) — 6
DateTypeResultReport
10/17/2025Pass-Final Curb Cut Non-Directive 14PassView ↗
10/02/2025Pass-Final Curb Cut Non-Directive 14PassView ↗
07/31/2025Pass-Final Curb Cut Non-Directive 14PassView ↗
01/22/2025Certified Storm Drainage-ST-Fixtures-FinishCertifiedView ↗
12/20/2024Certified Storm Drainage-ST-Piping-UndergroundCertifiedView ↗
12/29/2022Pass-Final Boiler Equipment InspectionPassView ↗
▾Special Inspection Requirements (DOB NOW) — 23
DateRequirementInspectorRole
03/09/2026Designated Seismic System—special
02/02/2026Post-installed Anchors—special
02/02/2026Structural Stability – Alterations of existing buildings—special
02/02/2026Structural Steel - Welding—special
02/02/2026Structural Steel - High Strength Bolting—special
02/02/2026Structural Steel - Details—special
02/02/2026Preliminary—progress
01/22/2026Fire-Resistant Penetrations and Joints—special
01/22/2026Fire-Resistant Penetrations and Joints—special
10/03/2025Sprinkler Systems—special
10/03/2025Final—progress
01/08/2023Maintenance informationStephen Marcheseenergy_progress
01/08/2023Heating SystemsStephen Marchesespecial
01/08/2023Fuel-Oil Storage and Fuel-Oil Piping SystemsStephen Marchesespecial
01/08/2023HVAC-R and service water heating equipmentStephen Marcheseenergy_progress
01/08/2023HVAC-R and service water heating system controlsStephen Marcheseenergy_progress
01/05/2023HVAC-R and service water heating equipmentStephen Marcheseenergy_progress
01/05/2023Heating SystemsStephen Marchesespecial
01/05/2023Fuel-Oil Storage and Fuel-Oil Piping SystemsStephen Marchesespecial
01/05/2023Maintenance informationStephen Marcheseenergy_progress
01/05/2023HVAC-R and service water heating system controlsStephen Marcheseenergy_progress
04/21/2022Fuel-Oil Storage and Fuel-Oil Piping SystemsStephen Marchesespecial
12/22/2021Fuel-Oil Storage and Fuel-Oil Piping SystemsStephen Marchesespecial
▾Tenants in the building
TenantSpaceFloorsRenovation projects
H+H Coney Island HospitalMedical / HealthcareFloor 5
Project B07994870 Alteration · LOC Issued · 09/12/2022
Read from each project’s drawing title blocks and cover sheets and checked twice; a name appears only when it is the occupant, never the owner, landlord or designer.
▾Documents — 682 on file (BIS + DOB NOW)
▸Plans & Drawings21
▸DOB NOWPlans/Sketch9
09/03/2026B00070597-I1Request digital key ↗
08/28/2026B07994870-I1Request digital key ↗
08/28/2026B07994870-P1Request digital key ↗
Showing 3 of 9 on file for this type
▸DOB NOWPlans/Sketch - Curb Cut7
09/01/2026B00472625-I1Request digital key ↗
09/01/2026B00472630-I1Request digital key ↗
09/01/2026B00472565-I1Request digital key ↗
Showing 3 of 7 on file for this type
▸DOB NOWPlans/Sketch - Boiler Equipment2
09/02/2026B00419115-I1Request digital key ↗
08/14/2026B00419115-P1Request digital key ↗
▸DOB NOWPlans/Sketch - Construction Fence1
09/02/2026B00172111-I1Request digital key ↗
▸DOB NOWPlans/Sketch - Sidewalk Shed1
09/02/2026B00172098-I1Request digital key ↗
▸DOB NOWPlans/Sketch - Temporary Place of Assembly1
08/28/2026B08004574-I1Request digital key ↗
▸Applications & Permits149
▸BISPLAN / WORK APPROVAL APPLICATION96
01/28/2026321385826Open ↗
08/13/2025340608104Open ↗
06/16/2025320911171Open ↗
Showing 3 of 96 on file for this type
▸BISWORK PERMIT APPLICATION47
10/30/2024320911171Open ↗
11/21/2023320911171Open ↗
11/21/2023320911171Open ↗
Showing 3 of 47 on file for this type
▸BISPLAN - WORK & PERMITS - SUPPPORTING DOCUMENTATION3
04/21/2023321465543Open ↗
Showing 1 of 3 on file for this type
▸BISBPP-5 - Authorization to the Department of Transportation3
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 3 on file for this type
▸Zoning, Tax Lot & Property Records11
▸BISFLOOD ZONE COMPLIANCE8
06/27/2025321071594Open ↗
02/22/2024340655295Open ↗
05/05/2023340655231Open ↗
Showing 3 of 8 on file for this type
▸BISZONING EXHIBIT I: CERTIFICATION2
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 2 on file for this type
▸BISFLOOD ZONE DESIGN CERTIFICATION PRIOR TO FULL NB APPROVAL1
08/09/2022320911171Open ↗
▸Seals & Professional Certifications70
▸DOB NOWDPL-1: Design Professional Seal & Signature21
09/03/2026B00070597-I1Open ↗
09/02/2026B00172098-I1Open ↗
09/02/2026B00172111-I1Open ↗
Showing 3 of 21 on file for this type
▸BISTECHNICAL REPORT: RESPONSIBILITY/CERTIFICATION11
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 11 on file for this type
▸BISPROFESSIONAL CERTIFICATION STATEMENT9
03/16/2023340883299Open ↗
Showing 1 of 9 on file for this type
▸BISTECHNICAL REPORT STATEMENT OF RESPONSIBILITY8
03/16/2023340883299Open ↗
Showing 1 of 8 on file for this type
▸BISREQUIRED ITEMS CHECKLIST FOR PROFESSIONAL CERTIFICATION8
03/16/2023340883299Open ↗
Showing 1 of 8 on file for this type
▸BISAPPLICANT OWNER SIGNATURE4
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 4 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature4
09/23/2026B00419115-I1Open ↗
08/24/2026B00419115-P1Open ↗
08/23/2026B07994870-P1Open ↗
Showing 3 of 4 on file for this type
▸BISPROFESSIONAL CERTIFIED CHECKLIST3
04/21/2023321465543Open ↗
Showing 1 of 3 on file for this type
▸DOB NOWProgress Inspector Seal & Signature2
08/23/2026B07994870-P1Open ↗
08/23/2026B07994870-I1Open ↗
▸Trade Schedules & Equipment41
▸BISSCHEDULE B - PLUMBING20
06/16/2025320911171Open ↗
10/06/2023340655295Open ↗
09/06/2023320911171Open ↗
Showing 3 of 20 on file for this type
▸BISSCHEDULE C - HEATING & COMBUSTION EQUIPMENT7
09/09/2022340655231Open ↗
08/30/2022340655231Open ↗
Showing 2 of 7 on file for this type
▸BISEQUIPMENT USE PERMITS3
01/05/2023320911171Open ↗
01/05/2023320911171Open ↗
Showing 2 of 3 on file for this type
▸BISSTANDPIPE SYSTEMS3
06/27/2025321071594Open ↗
02/22/2024340655295Open ↗
11/03/2022321465543Open ↗
▸BISEQUIPMENT USE APPLICATION/PERMIT2
01/05/2023320911171Open ↗
Showing 1 of 2 on file for this type
▸BISSCHEDULE B - PLUMBING/SPRINKLER/STANDPIPE2
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 2 on file for this type
▸BISHVAC & SERVICE WATER HEATING EQUIPMENT2
05/05/2023340655231Open ↗
12/22/2022320911171Open ↗
▸BISHVAC & SERVICE WATER HEATING SYSTEM CONTROLS2
05/05/2023340655231Open ↗
12/22/2022320911171Open ↗
▸Safety & Tenant Protection5
▸BISSTREET TREE CHECKLIST5
08/22/2025340608104Open ↗
04/10/2023320911171Open ↗
Showing 2 of 5 on file for this type
▸Energy Compliance22
▸BISTECHNICAL REPORT: ENERGY CODE - RESPONSIBILITY10
07/28/2022320911171Open ↗
Showing 1 of 10 on file for this type
▸BISAS-BUILT ENERGY ANALYSIS (EN2)4
05/11/2023340659683Open ↗
05/05/2023340655231Open ↗
12/27/2022320911171Open ↗
Showing 3 of 4 on file for this type
▸BISTECHNICAL REPORT: ENERGY CODE PROGRESS INSPS3
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 3 on file for this type
▸BIS* HVAC INSULATION AND SEALING2
05/05/2023340655231Open ↗
12/22/2022320911171Open ↗
▸BISELECTRIC MOTORS2
05/05/2023340655231Open ↗
12/22/2022320911171Open ↗
▸DOB NOWPreliminary Commissioning Report Certification1
08/13/2026B07994870-I1Open ↗
▸Inspections & Test Reports64
▸BISTECHNICAL REPORT: RESPONSIBILITY37
06/27/2025321071594Open ↗
05/15/2023321387110Open ↗
05/05/2023340655231Open ↗
Showing 3 of 37 on file for this type
▸BISTR2: CONCRETE TEST CYLINDERS TECHNICAL REPORT6
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 6 on file for this type
▸BISTECHNICAL REPORT: CONCRETE/TEST CYLINDER3
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 3 on file for this type
▸BISTECHNICAL REPORT: CONCRETE DESIGN MIX2
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 2 on file for this type
▸BISDIR-14 ID OF RESPONSIBILITY (TR1)2
03/16/2023340883299Open ↗
Showing 1 of 2 on file for this type
▸BISSOIL REPORT2
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 2 on file for this type
▸BISSTRUCTURAL STEEL - DETAILS2
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 2 on file for this type
▸BISSTRUCTURAL STEEL - HIGH STRENGTH BOLTING2
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 2 on file for this type
▸BISMECHANICAL SYSTEMS2
05/05/2023340659683Open ↗
12/27/2022320911171Open ↗
▸BISTR3: CONCRETE DESIGN MIX TECHNICAL REPORT2
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 2 on file for this type
▸BISSTRUCTURAL STEEL - WELDING2
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 2 on file for this type
▸BISPOST-INSTALLED ANCHORS1
08/12/2022320911171Open ↗
▸BISHYDRAULIC FLOW CALCULATIONS1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸Approvals, Objections & Sign-offs101
▸DOB NOWFee Exempt Supporting Document - DOF ACRIS report or BIB letter20
09/02/2026B00172098-I1Open ↗
09/02/2026B00172111-I1Open ↗
09/02/2026B00419115-I1Open ↗
Showing 3 of 20 on file for this type
▸BISLETTERS - SUPPORTING DOCUMENTATION19
05/02/2025321829722Open ↗
05/02/2025321829722Open ↗
05/02/2025321829722Open ↗
Showing 3 of 19 on file for this type
▸BISCERTIFICATE OF OCCUPANCY/LOC: REQUEST15
07/23/2025321071594Open ↗
05/05/2025340655295Open ↗
05/02/2025321829722Open ↗
Showing 3 of 15 on file for this type
▸BISFINAL12
06/27/2025321071594Open ↗
07/09/2024340688303Open ↗
02/22/2024340655295Open ↗
Showing 3 of 12 on file for this type
▸DOB NOWDesign Commission Approval City Owned (Exterior Work)12
09/02/2026B00419115-I1Open ↗
08/14/2026B00419115-P1Open ↗
08/13/2026B00472637-I1Open ↗
Showing 3 of 12 on file for this type
▸BISSCHEDULE A - OCCUPANCY / USE11
02/24/2023320911171Open ↗
02/21/2023320911171Open ↗
02/16/2023320911171Open ↗
Showing 3 of 11 on file for this type
▸DOB NOWDesign Commission Sign Off City Owned (Exterior Work)8
09/02/2026B00419115-I1Open ↗
08/13/2026B00472582-I1Open ↗
08/13/2026B00472637-I1Open ↗
Showing 3 of 8 on file for this type
▸BISSUPERSEDING LETTER4
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 4 on file for this type
▸Cost, Insurance & Ownership34
▸BISCOST AFFIDAVIT (FINAL): PW313
07/22/2025321071594Open ↗
04/23/2025321829722Open ↗
06/27/2023340883299Open ↗
Showing 3 of 13 on file for this type
▸BISCOST AFFIDAVIT13
03/16/2023340883299Open ↗
Showing 1 of 13 on file for this type
▸BISAcord 25 (Acord Certificate of Liability Insurance)5
10/30/2024320911171Open ↗
11/21/2023320911171Open ↗
11/03/2023320911171Open ↗
Showing 3 of 5 on file for this type
▸BISPROJECT-SPECIFIC GL INSURANCE3
11/21/2023320911171Open ↗
11/03/2023320911171Open ↗
Showing 2 of 3 on file for this type
▸Filing & Intake Forms92
▸BISADDITIONAL INFORMATION65
08/22/2025340608104Open ↗
06/27/2024340608104Open ↗
11/02/2023340655295Open ↗
Showing 3 of 65 on file for this type
▸BISEFILING JOB APPLICATION COVER SHEET12
03/16/2023340883299Open ↗
Showing 1 of 12 on file for this type
▸BISEFILING COVER SHEET10
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 10 on file for this type
▸BISBOROUGH INTAKE FORM4
08/08/2023320911171Open ↗
Showing 1 of 4 on file for this type
▸DOB NOWAI1 Form1
08/13/2026B08004574-I1Open ↗
▸Other Documents24
▸BISEXTERNAL FORMS - SUPPORTING DOCUMENTATION7
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 7 on file for this type
▸BISLOWEST FLOOR ELEVATION5
02/22/2024340655295Open ↗
06/13/2023321387110Open ↗
05/05/2023340655231Open ↗
Showing 3 of 5 on file for this type
▸BISFEMA ELEVATION CERT (086-0-33)/ FLOODPROOFING CERT (086-0-34)4
11/02/2023340655295Open ↗
06/16/2023321387110Open ↗
05/12/2023340659683Open ↗
Showing 3 of 4 on file for this type
▸BISFUEL-OIL STORAGE AND FUEL-OIL PIPING SYSTEMS2
05/05/2023340659683Open ↗
08/12/2022320911171Open ↗
▸BISSHUTOFF DAMPERS2
05/05/2023340655231Open ↗
12/22/2022320911171Open ↗
▸BISBPP - SUPPORTING DOCUMENTATION2
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 2 on file for this type
▸BISEMERGENCY & STANDBY POWER SYSTEMS (GENERATORS)2
05/05/2023340659683Open ↗
08/12/2022320911171Open ↗