← Back
BuildNYC
Zoned residential, not Manhattan
267 18TH STREET
BROOKLYN · BIN 3016785
💬 Discuss this project
0Year Built
—Stories
V0Building Class
R6BZoning
0 sfGross Floor Area
0Units
Rent Stabilized10 Active Violations ▸FDNY Report ↗
Zoned residential, not Manhattan · Owner of record: 267 18th St · 2,504 sf lot · 0 FAR built · Flood zone X
Locations of Work
ArchitectureStructuralMechanicalPlumbingFire ProtectionEquipmentGeneral
Names shown beside floors are taken automatically from the text of filed documents and may be incomplete or wrong.
Permit Issued — active, not yet Signed-off
RoofInterboro Property Management CORP.Under Construction1p · 1 filing · 20 docs
PenthouseInterboro Property Management CORP.Under Construction30p · 1 filing · 20 docs
Floor 3Interboro Property Management CORP.Under Construction27p · 2 filings · 20 docs
Floor 2Interboro Property Management CORP.Under Construction28p · 2 filings · 20 docs
Floor 1Interboro Property Management CORP.Under Construction27p · 1 filing · 20 docs
CellarInterboro Property Management CORP.Under Construction40p · 2 filings · 20 docs
Site & exteriorInterboro Property Management CORP.Under Construction20p · 3 filings · 20 docs
▾Sales History (ACRIS)
DatePriceUnitSeller → Buyer$/sf
10/26/2024$1.9M—— → —— not available
03/31/2022$1.8M—267 18TH STREET LLC → Private party— not available
02/04/2021$1.1M—Private party → 267 18TH STREET, LLC— not available
02/04/2021$1.1M—Private party → 267 18TH STREET, LLC— not available
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
BNJ Engineering610/13/2025
Design Studio Associates409/25/2025
Arnold Montag Architect AM/PM Desi303/24/2025
Arquitectura Varela101/02/2025
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
Demoworks Expediting603/21/2026
Design Studio Associates403/21/2026
LFNY Consultants603/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
Nicolosi BrothersGeneral Contractor707/08/2026
Paul Toth ExcavationScaffold403/21/2026
Interboro Property ManagementGeneral Contractor307/08/2026
Paul Toth ExcavationGeneral Contractor203/21/2026
Nicolosi BrothersScaffold210/20/2026
Phoenix Sutton STRScaffold203/21/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
Triangle Inspection & Tes7495810/13/2025
Afm Inspections & Engineering4675203/24/2025
Building Lifecycle
All (123)Filed (14)Permit Issued (15)Signed Off (2)Violation (16)Objection (54)Special Inspection (22)
10/19/2026
Permit issued — Construction Fence
B00923927-I1-FN
05/01/2026
Violation issued (HPD, open)
A
03/27/2026
Permit issued — General Construction
B08022178-I1-GC
12/09/2025
Objection resolved — Addressed
11/19/2025
Violation issued (HPD, open)
I
11/19/2025
Objection resolved — Addressed
11/17/2025
Special inspection requirement — Maintenance information
11/17/2025
Special inspection requirement — HVAC-R and service water piping design and insulation
11/17/2025
Special inspection requirement — HVAC-R and service water heating equipment
11/06/2025
Permit issued — Structural
B08022178-S5-ST
11/06/2025
Permit issued — Foundation
B08022178-S4-FO
11/06/2025
Permit issued — Support of Excavation
B08022178-S3-SE
11/06/2025
Permit issued — Structural
B08022178-S5-ST
11/05/2025
Objection raised — Scope
10/30/2025
Objection resolved — Addressed
10/30/2025
Objection resolved — Addressed
10/30/2025
Special inspection requirement — Structural Steel - Welding
Rajasekhar Sakhamuri
10/30/2025
Special inspection requirement — Construction Operations Influencing Adjacent Structures
Rajasekhar Sakhamuri
10/30/2025
Special inspection requirement — Excavations - Sheeting, Shoring, and Bracing
Rajasekhar Sakhamuri
10/30/2025
Special inspection requirement — Structural Stability – Alterations of existing buildings
Rajasekhar Sakhamuri
10/23/2025
Permit issued — Construction Fence
B00923927-I1-FN
10/22/2025
Objection raised — Other
10/21/2025
Objection raised — Scope
10/21/2025
Objection resolved — Addressed
10/21/2025
Objection resolved — Addressed
10/17/2025
Objection raised — Admin
10/15/2025
Objection raised — Admin
10/15/2025
Objection raised — Admin
10/13/2025
Filed — New Building
FOUNDATION WORK RELATED TO UNDERPINNING INSTALLATION
B08022178-P3
10/13/2025
Filed — New Building
FOUNDATION WORK RELATED TO UNDERPINNING INSTALLATION
B08022178-P2
10/09/2025
Special inspection requirement — Excavations - Sheeting, Shoring, and Bracing
Rajasekhar Sakhamuri
10/09/2025
Special inspection requirement — Structural Stability – Alterations of existing buildings
Rajasekhar Sakhamuri
10/09/2025
Special inspection requirement — Structural Steel - Welding
Rajasekhar Sakhamuri
10/09/2025
Special inspection requirement — Structural Stability – Alterations of existing buildings
Rajasekhar Sakhamuri
10/09/2025
Special inspection requirement — Subgrade Inspections
Rajasekhar Sakhamuri
10/09/2025
Special inspection requirement — Subsurface Conditions – Fill Placement & In-Place Density
Rajasekhar Sakhamuri
10/09/2025
Special inspection requirement — Underpinning
Rajasekhar Sakhamuri
10/09/2025
Special inspection requirement — Final
Rajasekhar Sakhamuri
10/09/2025
Special inspection requirement — Footing and Foundation
Rajasekhar Sakhamuri
10/09/2025
Special inspection requirement — Construction Operations Influencing Adjacent Structures
Rajasekhar Sakhamuri
10/08/2025
Signed off — Full Demolition
full demolition
B00900059-I1
10/08/2025
Objection resolved — Addressed
10/06/2025
Special inspection requirement — Structural Stability – Alterations of existing Buildings
Anthony Marmo
09/30/2025
Filed — New Building
FOUNDATION WORK RELATED TO UNDERPINNING INSTALLATION
B08022178-S6
09/25/2025
Filed — New Building
FOUNDATION WORK RELATED TO UNDERPINNING INSTALLATION
B08022178-S2
09/10/2025
Special inspection requirement — Footing and Foundation
Rajasekhar Sakhamuri
09/10/2025
Special inspection requirement — Final
Rajasekhar Sakhamuri
09/08/2025
Filed — New Building
FOUNDATION WORK RELATED TO UNDERPINNING INSTALLATION
B08022178-S5
09/03/2025
Permit issued — Support of Excavation
B08022178-S3-SE
08/12/2025
Permit issued — Foundation
B08022178-S4-FO
07/21/2025
Permit issued — General Construction
B08022178-I1-GC
06/25/2025
Filed — New Building
FOUNDATION WORK RELATED TO UNDERPINNING INSTALLATION
B08022178-P1
06/17/2025
Special inspection requirement — Fire-Resistant Penetrations and Joints
Rajasekhar Sakhamuri
06/06/2025
Violation issued (HPD, open)
A
05/13/2025
Permit issued — General Construction
B08022178-I1-GC
03/26/2025
Signed off — Alteration
INSTALLATION OF TEMPORARY HEAVY DUTY SIDEWALK SHED AS PER PLANS. NO CHANGE IN USE, EGRESS OR OCCUPANCY. SIDEWALK SHED SHALL COMPLY WITH CHAPTER #33 OF 2022 THE NYC BUILDING CODE. LIVE LOAD 300PSF.
B01158286-I1
03/24/2025
Filed — Full Demolition
full demolition
B00900059-P1
01/02/2025
Filed — Alteration
INSTALLATION OF TEMPORARY HEAVY DUTY SIDEWALK SHED AS PER PLANS. NO CHANGE IN USE, EGRESS OR OCCUPANCY. SIDEWALK SHED SHALL COMPLY WITH CHAPTER #33 OF 2022 THE NYC BUILDING CODE. LIVE LOAD 300PSF.
B01158286-I1
01/02/2025
Permit issued — Sidewalk Shed
B01158286-I1-SH
11/29/2024
Permit issued — Construction Fence
B00923927-I1-FN
Latest 60 of 123 events.
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWConstruction FencePermit IssuedNicolosi Brothers10/19/2026
DOB NOWGeneral ConstructionPermit IssuedNicolosi Brothers03/27/2026
DOB NOWStructuralPermit IssuedNicolosi Brothers11/06/2025
DOB NOWFoundationPermit IssuedNicolosi Brothers11/06/2025
DOB NOWSupport of ExcavationPermit IssuedNicolosi Brothers11/06/2025
DOB NOWStructuralPermit IssuedInterboro Property Management11/06/2025
DOB NOWConstruction FencePermit IssuedNicolosi Brothers10/23/2025
DOB NOWSupport of ExcavationPermit IssuedInterboro Property Management09/03/2025
DOB NOWFoundationPermit IssuedInterboro Property Management08/12/2025
DOB NOWGeneral ConstructionPermit IssuedNicolosi Brothers07/21/2025
DOB NOWGeneral ConstructionPermit IssuedNicolosi Brothers05/13/2025
DOB NOWSidewalk ShedSigned-offPhoenix Sutton STR01/02/2025
DOB NOWConstruction FencePermit IssuedPaul Toth Excavation11/29/2024
DOB NOWFull DemolitionSigned-offPaul Toth Excavation07/01/2024
DOB NOWConstruction FencePermit IssuedPaul Toth Excavation06/24/2024
1 project · most recent 10/13/2025
Sprinkler System
FiledStatusContractorScope
10/13/2025——Sprinkler System
1 project · most recent 10/13/2025
Gas Storm Water/Sanitary
FiledStatusContractorScope
10/13/2025——Gas, Storm, Water/Sanitary
3 projects · most recent 06/25/2026
General Wiring
FiledStatusContractorScope
06/25/2026Permit IssuedAround ElectricGeneral Wiring
12/03/2025Permit IssuedRigid ElectricGeneral Wiring
01/03/2025CompleteRichard Neu—
1 project · most recent 10/13/2025
Steel Masonry
FiledStatusContractorScope
10/13/2025Permit IssuedNicolosi BrothersSteel, Masonry
1 project · most recent 12/08/2023
Fence
FiledStatusContractorScope
12/08/2023Permit IssuedNicolosi BrothersFence
▾Special Inspection Requirements (DOB NOW) — 22
DateRequirementInspectorRole
11/17/2025Maintenance information—energy_progress
11/17/2025HVAC-R and service water piping design and insulation—energy_progress
11/17/2025HVAC-R and service water heating equipment—energy_progress
10/30/2025Structural Steel - WeldingRajasekhar Sakhamurispecial
10/30/2025Construction Operations Influencing Adjacent StructuresRajasekhar Sakhamurispecial
10/30/2025Excavations - Sheeting, Shoring, and BracingRajasekhar Sakhamurispecial
10/30/2025Structural Stability – Alterations of existing buildingsRajasekhar Sakhamurispecial
10/09/2025Excavations - Sheeting, Shoring, and BracingRajasekhar Sakhamurispecial
10/09/2025Structural Stability – Alterations of existing buildingsRajasekhar Sakhamurispecial
10/09/2025Structural Steel - WeldingRajasekhar Sakhamurispecial
10/09/2025Structural Stability – Alterations of existing buildingsRajasekhar Sakhamurispecial
10/09/2025Subgrade InspectionsRajasekhar Sakhamurispecial
10/09/2025Subsurface Conditions – Fill Placement & In-Place DensityRajasekhar Sakhamurispecial
10/09/2025UnderpinningRajasekhar Sakhamurispecial
10/09/2025FinalRajasekhar Sakhamuriprogress
10/09/2025Footing and FoundationRajasekhar Sakhamuriprogress
10/09/2025Construction Operations Influencing Adjacent StructuresRajasekhar Sakhamurispecial
10/06/2025Structural Stability – Alterations of existing BuildingsAnthony Marmospecial
09/10/2025Footing and FoundationRajasekhar Sakhamuriprogress
09/10/2025FinalRajasekhar Sakhamuriprogress
06/17/2025Fire-Resistant Penetrations and JointsRajasekhar Sakhamurispecial
03/08/2023Sprinkler SystemsRajasekhar Sakhamurispecial
▾Documents — 79 on file (BIS + DOB NOW)
▸Plans & Drawings14
▸DOB NOWPlans/Sketch14
08/23/2026B01158286-I1Request digital key ↗
08/22/2026B00900059-P1Request digital key ↗
08/22/2026B00900059-I1Request digital key ↗
Showing 3 of 14 on file for this type
▸Zoning, Tax Lot & Property Records4
▸DOB NOWZD1: DOB Zoning Diagram2
08/20/2026B08022178-I1Open ↗
08/13/2026B08022178-P1Open ↗
▸DOB NOWZoning Exhibit form (1-5)2
08/20/2026B08022178-I1Open ↗
08/13/2026B08022178-P1Open ↗
▸Seals & Professional Certifications33
▸DOB NOWSpecial Inspector Seal & Signature15
09/19/2026B00900059-I1Open ↗
09/03/2026B08022178-S2Open ↗
09/03/2026B08022178-S2Open ↗
Showing 3 of 15 on file for this type
▸DOB NOWDPL-1: Design Professional Seal & Signature14
08/22/2026B00900059-P1Open ↗
08/22/2026B00900059-I1Open ↗
08/20/2026B08022178-I1Open ↗
Showing 3 of 14 on file for this type
▸DOB NOWProgress Inspector Seal & Signature4
08/31/2026B08022178-P3Open ↗
08/31/2026B08022178-P3Open ↗
08/27/2026B08022178-S6Open ↗
Showing 3 of 4 on file for this type
▸Trade Schedules & Equipment6
▸DOB NOWDEP: Sewer Certification (Sanitary/Storm)2
08/20/2026B08022178-I1Open ↗
08/13/2026B08022178-P1Open ↗
▸DOB NOWGas Cut-Off1
08/13/2026B00900059-I1Open ↗
▸DOB NOWWater Cut-Off1
08/13/2026B00900059-I1Open ↗
▸DOB NOWSewer Cut-Off1
08/13/2026B00900059-I1Open ↗
▸DOB NOWElectric Cut-Off1
08/13/2026B00900059-I1Open ↗
▸Safety & Tenant Protection3
▸DOB NOWStreet Tree Checklist2
08/20/2026B08022178-I1Open ↗
08/13/2026B08022178-P1Open ↗
▸DOB NOWParks Department Acknowledgment Letter for Street Trees Plan1
08/13/2026B08022178-I1Open ↗
▸Environmental & Asbestos3
▸DOB NOWDEP ACP-5: Asbestos Assessment Report2
08/22/2026B00900059-P1Open ↗
08/22/2026B00900059-I1Open ↗
▸DOB NOWRodent Control1
08/13/2026B00900059-I1Open ↗
▸Inspections & Test Reports3
▸DOB NOWSOIL REPORT2
08/20/2026B08022178-I1Open ↗
08/13/2026B08022178-P1Open ↗
▸DOB NOWTR4 Test Report and Plot Diagram1
08/13/2026B08022178-I1Open ↗
▸Other Documents13
▸DOB NOWProperty Ownership Certification4
08/22/2026B00900059-I1Open ↗
08/22/2026B00900059-P1Open ↗
08/20/2026B08022178-I1Open ↗
Showing 3 of 4 on file for this type
▸DOB NOWStructure Photographs2
08/13/2026B00900059-I1Open ↗
08/13/2026B00900059-P1Open ↗
▸DOB NOWSite Survey: Initial2
08/20/2026B08022178-I1Open ↗
08/13/2026B08022178-P1Open ↗
▸DOB NOWLocal Law 92/94 of 2019 Sustainable Roof Zone2
08/20/2026B08022178-I1Open ↗
08/13/2026B08022178-P1Open ↗
▸DOB NOWAdjoining Owners Notification1
08/13/2026B08022178-S3Open ↗
▸DOB NOWCommunity Board Notification1
08/13/2026B00900059-I1Open ↗
▸DOB NOWFull Demo: 10-Day Notice1
08/13/2026B00900059-I1Open ↗