← Back
Three families
267 EAST 175 STREET
BRONX · Mount Hope · BIN 2007540
💬 Discuss this project
1899Year Built
3Stories
C0Building Class
R7-1Zoning
3,300 sfGross Floor Area
3Units
Rent Stabilized39 Open Violations ▸
Three families · 2,375 sf lot · 1.39 FAR built · Flood zone X
Locations of Work
ArchitectureElectricalMechanicalPlumbingFire ProtectionGeneral
Filed — no permit issued18p · 1 filing · 1 doc
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
VASILIOS ARTEMIOU PE101/14/2025
ADB ASSOCIATES312/03/2024
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
EXPRESS FILING INC803/21/2026
Building Lifecycle
All (94)Filed (4)Violation (58)Objection (2)Special Inspection (30)
04/30/2026
Violation issued (HPD, open)
A
11/17/2025
Violation issued (HPD, closed)
I
06/05/2025
Violation issued (HPD, open)
A
01/23/2025
Objection resolved — Addressed
01/21/2025
Objection raised — Fire_Protection
01/14/2025
Filed — Alteration CO
SPRINKLER SPECIFICATIONS FILED IN CONJUNCTION WITH GC APPLICATION X01116423-I1
X01116423-S3
01/10/2025
Special inspection requirement — Sprinkler Systems
01/10/2025
Special inspection requirement — Post-installed Anchors
01/10/2025
Special inspection requirement — Fire-Resistant Penetrations and Joints
12/03/2024
Filed — Alteration CO
SPRINKLER SPECIFICATIONS FILED IN CONJUNCTION WITH GC APPLICATION X01116423-I1
X01116423-S2
12/03/2024
Special inspection requirement — HVAC-R and service water heating system controls
12/03/2024
Special inspection requirement — HVAC-R and service water heating equipment
12/03/2024
Special inspection requirement — Fire-Resistant Penetrations and Joints
12/03/2024
Special inspection requirement — Energy Code Compliance Inspections
12/03/2024
Special inspection requirement — Maintenance information
12/03/2024
Special inspection requirement — HVAC-R and service water piping design and insulation
11/28/2024
Filed — Alteration CO
SPRINKLER SPECIFICATIONS FILED IN CONJUNCTION WITH GC APPLICATION X01116423-I1
X01116423-S1
11/26/2024
Special inspection requirement — HVAC-R and service water piping design and insulation
11/26/2024
Special inspection requirement — Mechanical Systems
11/26/2024
Special inspection requirement — Heating Systems
11/26/2024
Special inspection requirement — Post-installed Anchors
11/26/2024
Special inspection requirement — Fire-Resistant Penetrations and Joints
11/26/2024
Special inspection requirement — Final
11/26/2024
Special inspection requirement — Fire-Resistance Rated Construction
11/26/2024
Special inspection requirement — Maintenance information
11/26/2024
Special inspection requirement — Permanent certificate
11/26/2024
Special inspection requirement — Ventilation and air distribution system
11/26/2024
Special inspection requirement — HVAC-R and service water heating equipment
11/26/2024
Special inspection requirement — HVAC-R and service water heating system controls
11/26/2024
Special inspection requirement — Duct leakage testing, insulation and design
11/22/2024
Violation issued (HPD, closed)
I
09/26/2024
Filed — Alteration CO
SPRINKLER SPECIFICATIONS FILED IN CONJUNCTION WITH GC APPLICATION X01116423-I1
X01116423-I1
09/24/2024
Special inspection requirement — Structural Stability – Alterations of existing buildings
09/24/2024
Special inspection requirement — Interior lighting power
09/24/2024
Special inspection requirement — Permanent certificate
09/24/2024
Special inspection requirement — Fenestration air leakage
09/24/2024
Special inspection requirement — Fenestration areas
09/24/2024
Special inspection requirement — Air barrier - visual inspection
09/24/2024
Special inspection requirement — Metering
09/24/2024
Special inspection requirement — Insulation placement and R values
04/02/2024
Violation issued (HPD, open)
A
11/16/2023
Violation issued (HPD, closed)
I
03/16/2023
Violation issued (HPD, open)
A
11/03/2022
Violation issued (HPD, closed)
I
02/17/2022
Violation issued (HPD, closed)
I
02/17/2022
Violation issued (HPD, open)
A
04/02/2021
Violation issued (HPD, open)
A
10/28/2019
Violation issued (HPD, closed)
I
10/11/2018
Violation issued (HPD, closed)
I
10/28/2016
Violation issued (HPD, closed)
I
10/05/2015
Violation issued (HPD, closed)
I
12/11/2012
Violation issued (HPD, closed)
C
12/11/2012
Violation issued (HPD, closed)
C
12/11/2012
Violation issued (HPD, closed)
C
12/11/2012
Violation issued (HPD, closed)
C
12/11/2012
Violation issued (HPD, closed)
C
12/11/2012
Violation issued (HPD, closed)
C
12/11/2012
Violation issued (HPD, open)
A
12/11/2012
Violation issued (HPD, open)
B
12/11/2012
Violation issued (HPD, open)
A
Latest 60 of 94 events.
Nothing on file for this building.
1 project · most recent 01/14/2025
Sprinkler System
FiledStatusContractorScope
01/14/2025——Sprinkler System
1 project · most recent 07/07/2026
FiledStatusContractorScope
07/07/2026Permit IssuedTRIPLE D ELECTRIC INC4 meters, 4 new_meters
▾Special Inspection Requirements (DOB NOW) — 35
DateRequirementInspectorRole
01/10/2025Sprinkler Systems—special
01/10/2025Post-installed Anchors—special
01/10/2025Fire-Resistant Penetrations and Joints—special
12/03/2024HVAC-R and service water heating system controls—energy_progress
12/03/2024HVAC-R and service water heating equipment—energy_progress
12/03/2024Fire-Resistant Penetrations and Joints—special
12/03/2024Energy Code Compliance Inspections—progress
12/03/2024Maintenance information—energy_progress
12/03/2024HVAC-R and service water piping design and insulation—energy_progress
11/26/2024HVAC-R and service water piping design and insulation—energy_progress
11/26/2024Mechanical Systems—special
11/26/2024Heating Systems—special
11/26/2024Post-installed Anchors—special
11/26/2024Fire-Resistant Penetrations and Joints—special
11/26/2024Final—progress
11/26/2024Fire-Resistance Rated Construction—progress
11/26/2024Maintenance information—energy_progress
11/26/2024Permanent certificate—energy_progress
11/26/2024Ventilation and air distribution system—energy_progress
11/26/2024HVAC-R and service water heating equipment—energy_progress
11/26/2024HVAC-R and service water heating system controls—energy_progress
11/26/2024Duct leakage testing, insulation and design—energy_progress
09/24/2024Structural Stability – Alterations of existing buildings—special
09/24/2024Interior lighting power—energy_progress
09/24/2024Permanent certificate—energy_progress
Latest 25 of 35.
▾Documents — 1 on file (BIS + DOB NOW)
▸Safety & Tenant Protection1
▸DOB NOWStreet Tree Checklist1
08/13/2026X01116423-I1Open ↗