267 KOSCIUSZKO STREET
BROOKLYN · BIN 3392728
💬 Discuss this project
1931Year Built
4Stories
C3Building Class
R6BZoning
8,975 sfGross Floor Area
4Units
Rent Stabilized0 Active ViolationsFDNY Report ↗
Four families · Owner of record: 267 Kosciuszko · 2,550 sf lot · 3.52 FAR built · Flood zone X
Locations of Work
ArchitectureStructuralMechanicalPlumbingGeneral
Names shown beside floors are taken automatically from the text of filed documents and may be incomplete or wrong.
Roof9p · 3 filings · 20 docs
Bulkhead1p · 1 filing · 20 docs
Floor 4Plumbing and gas piping work23p · 4 filings · 20 docs
Floor 3Plumbing and gas piping work23p · 4 filings · 20 docs
Floor 2Plumbing and gas piping work23p · 4 filings · 20 docs
Floor 1Plumbing and gas piping work23p · 4 filings · 20 docs
CellarPlumbing and gas piping work25p · 4 filings · 20 docs
Site & exteriorTemporary Construction Fence1p · 1 filing · 2 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
267 Kosciuszko4307/08/2026
▾Sales History (ACRIS)
DatePriceUnitSeller → Buyer$/sf
08/25/2022$3.4M—Private party → 267 KOSCIUSZKO LLC$373/sf building
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
Cavalry Associates907/12/2023
Chun Engineering Consultant106/20/2023
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
Cavalry1203/21/2026
Cavalry Management803/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
Method General ContractorGeneral Contractor1007/08/2026
Method General Contractorspecialty_contractor603/21/2026
Overall RenovationScaffold303/21/2026
Overall Renovationspecialty_contractor303/21/2026
Method General ContractorScaffold207/08/2026
P.H. WorksPlumbing107/08/2026
Starlite PlumbingPlumbing107/08/2026
M Marin RestorationGeneral Contractor109/08/2006
Theodore Wagner PLG HeatingPlumbing109/22/1999
Vigo ConstructionGeneral Contractor109/22/1999
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
M. International Engineering3129807/12/2023
Building Lifecycle
06/12/2025
(a) § hmc:file annual bedbug report in accordance with HPD rule as described on the back of this notice of violation or as described on HPDs…
HPD violation · closed
11/27/2024
§27-2107 ADM code owner failed to file a valid registration statement with the department as required by ADM code §27-2097 and is therefore subject…
HPD violation · closed
04/16/2024
(a) § hmc:file annual bedbug report in accordance with HPD rule as described on the back of this notice of violation or as described on HPDs…
HPD violation · closed
11/21/2023
§27-2107 ADM code owner failed to file a valid registration statement with the department as required by ADM code §27-2097 and is therefore subject…
HPD violation · closed
11/08/2023
Signed off — Alteration
Minor Interior renovation of existing 4-family 4-story building with general construction work. No change in use, egress or occupancy
B00891011-I1
90 history events on file for this building. Sign in free to see the full history. Sign in · Create account
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWGeneral ConstructionSigned-offMethod General Contractor06/30/2023
DOB NOWStructuralSigned-offMethod General Contractor05/16/2023
DOB NOWMechanical SystemsSigned-offMethod General Contractor02/25/2023
DOB NOWConstruction FenceSigned-offMethod General Contractor02/24/2023
DOB NOWGeneral ConstructionSigned-offMethod General Contractor02/24/2023
DOB NOWPlumbingSigned-offB-EZ Plumbing & Heating02/22/2023
DOB NOWPlumbingSigned-offP.H. Works11/30/2022
DOB NOWGeneral ConstructionSigned-offMethod General Contractor10/26/2022
DOB NOWConstruction FenceSigned-offMethod General Contractor10/19/2022
DOB NOWMechanical SystemsSigned-offMethod General Contractor10/19/2022
DOB NOWMechanical SystemsSigned-offOverall Renovation09/28/2022
DOB NOWConstruction FenceSigned-offOverall Renovation09/23/2022
BISOTISSUEDM. Marin Restoration09/08/2006
BIS—RE-ISSUEDMediterranean Construction09/22/1999
BISPLISSUEDTheodore Wagner PLG Heating09/22/1999
2 projects · most recent 08/03/2023
General Wiring
FiledStatusContractorScope
08/03/2023CompleteS&R ElectricalGeneral Wiring
12/06/2022CompleteS&R Electrical—
▾Field Inspections (DOB CAP) — 4
DateTypeResultReport
07/20/2023Certified Water and Sanitary-WS-Fixtures-FinishCertifiedView ↗
05/23/2023Certified Water and Sanitary-WS-Sanitary Piping-UndergroundCertifiedView ↗
03/30/2023Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
03/28/2023Certified Remove/Cap - work done in accordance with codeCertifiedView ↗
▾Special Inspection Requirements (DOB NOW) — 34
DateRequirementInspectorRole
06/29/2023Mechanical SystemsNANIK MASSANDspecial
06/29/2023Energy Code Compliance InspectionsNANIK MASSANDprogress
06/29/2023Post-installed AnchorsNANIK MASSANDspecial
06/29/2023Fire-Resistant Penetrations and JointsNANIK MASSANDspecial
06/29/2023HVAC-R and service water heating equipmentNANIK MASSANDenergy_progress
06/29/2023HVAC-R and service water piping design and insulationNANIK MASSANDenergy_progress
06/29/2023Shutoff dampersNANIK MASSANDenergy_progress
06/29/2023Maintenance informationNANIK MASSANDenergy_progress
06/29/2023HVAC-R and service water heating system controlsNANIK MASSANDenergy_progress
06/29/2023Duct leakage testing, insulation and designNANIK MASSANDenergy_progress
06/29/2023FinalNANIK MASSANDprogress
06/15/2023Fire-Resistance Rated ConstructionNANIK MASSANDprogress
06/15/2023FinalNANIK MASSANDprogress
06/15/2023Fire-Resistant Penetrations and JointsNANIK MASSANDspecial
04/11/2023Structural Cold-Formed SteelNANIK MASSANDspecial
04/11/2023Structural Steel - High Strength BoltingNANIK MASSANDspecial
04/11/2023Structural Steel - WeldingNANIK MASSANDspecial
04/11/2023Structural Steel - DetailsNANIK MASSANDspecial
02/28/2023Energy Code Compliance InspectionsNANIK MASSANDprogress
02/28/2023Fire-Resistant Penetrations and JointsNANIK MASSANDspecial
02/28/2023Lighting in dwelling unitsNANIK MASSANDenergy_progress
02/28/2023Fire-Resistance Rated ConstructionNANIK MASSANDprogress
02/28/2023FinalNANIK MASSANDprogress
10/21/2022Fire-Resistant Penetrations and JointsNANIK MASSANDspecial
10/21/2022FinalNANIK MASSANDprogress
Latest 25 of 34.
45 filed documents on file for this building. Sign in free to see the full history. Sign in · Create account