← Back
BuildNYC
Condo, residential tower (mixed-use, multi-family elevator) [derived]
The 635 Driggs Avenue Condominium
267 METROPOLITAN AVENUE · BIN 3062373
💬 Discuss this project
1927Year Built
4Stories
RMBuilding Class
M1-2/R6AZoning
31,313 sfGross Floor Area
31Units
LL97 CoveredRent Stabilized0 Active Violations 1 old, status unconfirmed ▸FDNY Report ↗
Condo, residential tower (mixed-use, multi-family elevator) [derived] · 9,322 sf lot · 3.36 FAR built · Flood zone X
Locations of Work
ArchitectureMechanicalPlumbing
Names shown beside floors are taken automatically from the text of filed documents and may be incomplete or wrong.
RoofK Top Chicken3p · 1 filing · 3 docs
Floor 1Hacohen, K Top Chicken21p · 8 filings · 20 docs
Site & exteriorIlluminated business accessory wall sign2p · 4 filings · 20 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
271 Metropolitan5903/21/2026
Zambala807/08/2026
Complete Condo Services103/21/2026
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
MSM Engineering Services301/14/2025
Sandi Lipshitz Hacohen Architect405/26/2022
David Silberman, P.E108/10/2021
Ashraf101/28/2021
Flushing201/15/2021
Edward C. Hicks RA101/05/2021
Allen Shinfeld, P.E205/11/2019
Leon Skvirsky PE202/26/2018
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
Abris Design Studio603/21/2026
A Plus Design403/21/2026
Superior Fire Control103/21/2026
JD Arch603/21/2026
Youn Design403/21/2026
Building Brothers403/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
Rong MaintenanceGeneral Contractor503/22/2026
S & L PlumbingPlumbing407/08/2026
Kadar Elite ConstructionGeneral Contractor303/21/2026
Done Right Kitchen ExhausGeneral Contractor303/21/2026
Neptune Signs & AwningsSign hanger207/08/2026
Paul SignsSign hanger207/08/2026
Jadestone ConstructionGeneral Contractor107/08/2026
Alef Electrical ContractingElectrical103/21/2026
Advanced Plumbing MechanicalPlumbing107/08/2026
PipestylistsPlumbing107/08/2026
Apollo Electric NYGElectrical103/21/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
MSM Engineering Services8449112/03/2024
NKM Engineering6244212/03/2024
Ashraf1973101/28/2021
Flushing Engineering Service4373201/15/2021
AA Building & Inspection1519101/05/2021
Building Lifecycle
All (93)Filed (16)Permit Issued (11)Signed Off (10)Violation (44)Inspection (4)Special Inspection (8)
02/13/2026
Violation issued (FDNY_ORDER, closed)
02/13/2026
Violation issued (FDNY_ORDER, closed)
02/13/2026
Violation issued (FDNY_ORDER, closed)
12/05/2025
Violation issued (FDNY_NOV, closed)
12/03/2025
Violation issued (FDNY_NOV, closed)
06/11/2025
Signed off — Alteration
INTERIRO RENOVATION EXISTING COMMERCIAL SPACE WITH PARTITION AND MECHANICAL WORK ON 1ST FLOOR AND CELLAR.
B01142044-I1
06/09/2025
Inspection — Pass-Final General Construction Non-Directive 14
Pass
View inspection ↗
04/01/2025
Inspection — Fail-Final General Construction Non-Directive 14
Fail
View inspection ↗
03/11/2025
Signed off — Alteration
INTERIOR RENOVATION EXISTING COMMERCIAL SPACE WITH PLUMBING WORK ON THE 1ST FLOOR. NO CHANGE IN USE, EGERES OR OCCUPANCY.
B01142049-I1
02/21/2025
Inspection — Certified Water and Sanitary-WS-Fixtures-Finish
Certified
View inspection ↗
02/05/2025
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Roughing
Certified
View inspection ↗
01/28/2025
Special inspection requirement — Tenant Protection Plan Compliance
NARESH MAHANGU
01/14/2025
Filed — Alteration
INTERIOR RENOVATION EXISTING COMMERCIAL SPACE WITH PLUMBING WORK ON THE 1ST FLOOR. NO CHANGE IN USE, EGERES OR OCCUPANCY.
B01142049-P1
01/09/2025
Special inspection requirement — Tenant Protection Plan Compliance
12/13/2024
Permit issued — Plumbing
B01142049-I1-PL
12/13/2024
Permit issued — General Construction
B01142044-I1-GC-CX
12/03/2024
Filed — Alteration
INTERIRO RENOVATION EXISTING COMMERCIAL SPACE WITH PARTITION AND MECHANICAL WORK ON 1ST FLOOR AND CELLAR.
B01142044-I1
12/03/2024
Filed — Alteration
INTERIOR RENOVATION EXISTING COMMERCIAL SPACE WITH PLUMBING WORK ON THE 1ST FLOOR. NO CHANGE IN USE, EGERES OR OCCUPANCY.
B01142049-I1
12/03/2024
Special inspection requirement — Tenant Protection Plan Compliance
NARESH MAHANGU
11/13/2024
Special inspection requirement — Mechanical Systems
MOHAMED MAHMOUD
11/13/2024
Special inspection requirement — Final
MOHAMED MAHMOUD
06/20/2023
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
04/19/2023
Violation issued (HPD, closed)
C
04/19/2023
Violation issued (HPD, closed)
B
04/19/2023
Violation issued (HPD, closed)
A
04/19/2023
Violation issued (HPD, closed)
C
04/19/2023
Violation issued (HPD, closed)
B
08/02/2022
Signed off — Alteration
Arrangement of new Commercial Kitchen
B00448943-I1
08/02/2022
Signed off — Alteration
B00446762-I1
06/01/2022
Special inspection requirement — Maintenance information
Younes Abouyaala
05/26/2022
Filed — Alteration
Arrangement of new Commercial Kitchen
B00448943-P3
05/23/2022
Special inspection requirement — Maintenance information
Younes Abouyaala
05/17/2022
Filed — Alteration
Arrangement of new Commercial Kitchen
B00448943-P2
02/24/2022
Violation issued (HPD, closed)
A
12/13/2021
Filed — Alteration
Arrangement of new Commercial Kitchen
B00448943-P1
12/13/2021
Special inspection requirement — Maintenance information
Younes Abouyaala
08/10/2021
Filed — Alteration
B00574406-I1
04/29/2021
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
04/05/2021
Permit issued — Plumbing
B00448943-I1-PL
04/01/2021
Permit issued — General Construction
B00446762-I1-GC
03/14/2021
Filed — Alteration
Arrangement of new Commercial Kitchen
B00448943-I1
03/04/2021
Signed off — Alteration
B00448467-I1
03/04/2021
Signed off — Alteration
B00454792-I1
02/19/2021
Permit issued — Mechanical Systems
B00457732-I1-MS
01/28/2021
Filed — Alteration
B00457732-I1
01/26/2021
Permit issued — General Construction
B00454792-I1-GC
01/26/2021
Permit issued — Plumbing
B00448467-I1-PL
01/15/2021
Filed — Alteration
B00448467-I1
01/15/2021
Filed — Alteration
B00454792-I1
01/05/2021
Filed — Alteration
B00446762-I1
03/10/2020
Signed off — Alteration
ILLUMINATED BUSINESS ACCESSORY WALL SIGN. NO CHANGE TO USE, EGRESS OR OCCUPANCY
B00165841-I1
03/09/2020
Signed off — Alteration
ILLUMINATED BUSINESS ACCESSORY WALL SIGN. NO CHANGE TO USE, EGRESS OR OCCUPANCY
B00164125-I1
10/28/2019
Permit issued — Sign
B00164125-I1-SG
10/28/2019
Permit issued — Sign
B00165841-I1-SG
05/25/2019
Violation issued (HPD, closed)
A
05/11/2019
Filed — Alteration
ILLUMINATED BUSINESS ACCESSORY WALL SIGN. NO CHANGE TO USE, EGRESS OR OCCUPANCY
B00165841-I1
05/11/2019
Filed — Alteration
ILLUMINATED BUSINESS ACCESSORY WALL SIGN. NO CHANGE TO USE, EGRESS OR OCCUPANCY
B00164125-I1
05/03/2019
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
02/27/2019
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
03/29/2018
Signed off — Alteration
B00017243-I1
Latest 60 of 93 events.
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWPlumbingSigned-offS & L Plumbing12/13/2024
DOB NOWGeneral ConstructionSigned-offRong Maintenance12/13/2024
DOB NOWPlumbingSigned-offAdvanced Plumbing Mechanical04/05/2021
DOB NOWGeneral ConstructionSigned-offKadar Elite Construction04/01/2021
DOB NOWMechanical SystemsPermit IssuedDone Right Kitchen Exhaus02/19/2021
DOB NOWGeneral ConstructionSigned-offJadestone Construction01/26/2021
DOB NOWPlumbingSigned-offT & T Plumbing01/26/2021
DOB NOWSignSigned-offNeptune Signs & Awnings10/28/2019
DOB NOWSignSigned-offNeptune Signs & Awnings10/28/2019
DOB NOWSignSigned-offPaul Signs03/01/2018
DOB NOWSignSigned-offPaul Signs03/01/2018
BISOTISSUEDPonos Home Improvement06/29/2020
BISOTISSUEDPonos Home Improvement03/19/2020
BISOTISSUEDEmpire Group NYC02/26/2020
BISPLISSUEDAll Pro Plumbing & Heating02/12/2019
BISOTISSUEDAK Premier Contracting02/07/2019
BISOTISSUEDZ Barclay Group NYC06/20/2018
BISPLISSUEDH & F Plumbing05/18/2016
BISOTISSUEDSK One Construction01/27/2016
BISPLISSUEDVMC Plumbing & Heating01/25/2016
BISOTISSUEDSK One Construction01/21/2016
BISMHISSUEDUnique Fire Systems10/20/2015
BISPLISSUEDP.S.I. Mechanical07/30/2015
BISPLISSUEDSuperior Plumbing & Heating06/12/2015
BISOTISSUEDA.D. Custom Interiors06/05/2015
BIS—ISSUEDUnitech Design12/22/2014
BIS—ISSUEDUnitech Design12/22/2014
BISPLISSUEDA.M.N12/08/2014
BISOTISSUEDCKS Construction NY11/24/2014
BISPLISSUEDI Do Plumbing & Heating05/06/2014
BISSPISSUEDAvon Plumbing & Heating05/06/2014
BISEQISSUEDLee & Company of NY04/25/2014
BISOTISSUEDLee & Company of NY04/25/2014
BISPLISSUEDTop Dog Plumbing & Heating02/11/2014
BISOTISSUEDChina CF Construction02/06/2014
BISPLISSUEDA.M.N11/16/2013
BISOTISSUEDInteriors by AJ11/12/2013
BISMHISSUEDMRMD NY02/22/2013
BISOTISSUEDMRMD NY02/22/2013
BIS—ISSUEDMRMD NY02/22/2013
+ 15 more permits on file
6 projects · most recent 03/16/2021
General Wiring
FiledStatusContractorScope
03/16/2021Permit IssuedBlue Seagull ElectricalGeneral Wiring
07/27/2020CompleteJ.S.V. ElectricGeneral Wiring
05/12/2019CompleteJong Hyun Kim—
05/12/2019CompleteJong Hyun Kim—
03/23/2018Permit IssuedRobert S. Covello—
03/23/2018Permit IssuedRobert S. Covello—
▾Field Inspections (DOB CAP) — 4
DateTypeResultReport
06/09/2025Pass-Final General Construction Non-Directive 14PassView ↗
04/01/2025Fail-Final General Construction Non-Directive 14FailView ↗
02/21/2025Certified Water and Sanitary-WS-Fixtures-FinishCertifiedView ↗
02/05/2025Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
▾Special Inspection Requirements (DOB NOW) — 8
DateRequirementInspectorRole
01/28/2025Tenant Protection Plan ComplianceNARESH MAHANGUspecial
01/09/2025Tenant Protection Plan Compliance—special
12/03/2024Tenant Protection Plan ComplianceNARESH MAHANGUspecial
11/13/2024Mechanical SystemsMOHAMED MAHMOUDspecial
11/13/2024FinalMOHAMED MAHMOUDprogress
06/01/2022Maintenance informationYounes Abouyaalaenergy_progress
05/23/2022Maintenance informationYounes Abouyaalaenergy_progress
12/13/2021Maintenance informationYounes Abouyaalaenergy_progress
▾Tenants in the building
TenantSpaceFloorsRenovation projects
K Top ChickenRestaurant / Food ServiceFloor 1, Roof
Project B00574406 Alteration · Objections · 08/10/2021
Project B00457732 Alteration · Permit Entire · 01/28/2021
Project B00446762 Alteration · LOC Issued · 01/05/2021
HacohenRetailFloor 1
Project B00448943 Alteration · LOC Issued · 03/14/2021
Names are taken automatically from the text of each project’s filed documents (title blocks and cover sheets) and screened to exclude owners, landlords and designers. They may be incomplete or wrong; check the filing.
▾Documents — 447 on file (BIS + DOB NOW)
▸Plans & Drawings16
▸DOB NOWPlans/Sketch6
09/03/2026B00017237-I1Request digital key ↗
09/03/2026B00017243-I1Request digital key ↗
09/01/2026B00574406-I1Request digital key ↗
Showing 3 of 6 on file for this type
▸DOB NOWPlans/Sketch - Plumbing5
09/01/2026B00448467-I1Request digital key ↗
09/01/2026B00448943-P3Request digital key ↗
09/01/2026B00448943-P2Request digital key ↗
Showing 3 of 5 on file for this type
▸DOB NOWPlans/Sketch - Sign2
09/02/2026B00164125-I1Request digital key ↗
09/02/2026B00165841-I1Request digital key ↗
▸DOB NOWPlans/Sketch - General Construction2
09/02/2026B00446762-I1Request digital key ↗
09/01/2026B00454792-I1Request digital key ↗
▸DOB NOWPlans/Sketch - Mechanical Systems1
09/01/2026B00457732-I1Request digital key ↗
▸Applications & Permits88
▸BISPLAN / WORK APPROVAL APPLICATION45
09/10/2021321922782Open ↗
03/09/2020321610235Open ↗
02/12/2019321924147Open ↗
Showing 3 of 45 on file for this type
▸BISWORK PERMIT APPLICATION41
03/24/2020321610235Open ↗
02/27/2020321775539Open ↗
02/13/2019321924147Open ↗
Showing 3 of 41 on file for this type
▸BISCERTIFICATE OF OCCUPANCY: APPLICATION1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸DOB NOWHPD Certification Letter or CPC Special Permit1
08/13/2026B01142044-I1Open ↗
▸Zoning, Tax Lot & Property Records1
▸BISZONING DIAGRAM1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸Seals & Professional Certifications82
▸BISTECHNICAL REPORT: RESPONSIBILITY/CERTIFICATION35
03/09/2020321610235Open ↗
02/12/2019321924147Open ↗
02/06/2019321922782Open ↗
Showing 3 of 35 on file for this type
▸DOB NOWDPL-1: Design Professional Seal & Signature16
09/03/2026B00017237-I1Open ↗
09/03/2026B00017243-I1Open ↗
09/02/2026B00446762-I1Open ↗
Showing 3 of 16 on file for this type
▸BISPROFESSIONAL CERTIFIED CHECKLIST12
03/09/2020321610235Open ↗
02/12/2019321924147Open ↗
06/15/2018321775539Open ↗
Showing 3 of 12 on file for this type
▸BISPROFESSIONAL CERTIFICATION STATEMENT6
03/09/2020321610235Open ↗
02/12/2019321924147Open ↗
06/15/2018321775539Open ↗
Showing 3 of 6 on file for this type
▸BISPROFESSIONAL CERTIFICATION STATEMENT FORM5
05/29/2014320861288Open ↗
Showing 1 of 5 on file for this type
▸DOB NOWProgress Inspector Seal & Signature4
08/31/2026B00448943-I1Open ↗
08/26/2026B00448943-P1Open ↗
08/25/2026B01142044-I1Open ↗
Showing 3 of 4 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature3
08/25/2026B01142044-I1Open ↗
08/25/2026B01142044-I1Open ↗
08/24/2026B01142049-I1Open ↗
▸BISProfessional and Owner Certification (POC3)1
12/27/2013320822605Open ↗
▸Trade Schedules & Equipment53
▸BISSELF-CERT PLUMBING NOTICE20
08/04/2015320861288Open ↗
05/21/2015320861288Open ↗
03/23/2015320837029Open ↗
Showing 3 of 20 on file for this type
▸BISSCHEDULE B - PLUMBING10
11/13/2014320861288Open ↗
05/29/2014320861288Open ↗
12/27/2013320822605Open ↗
Showing 3 of 10 on file for this type
▸BISSCHEDULE B - PLUMBING/SPRINKLER/STANDPIPE9
02/12/2019321924147Open ↗
02/06/2019321922782Open ↗
01/19/2016321245862Open ↗
Showing 3 of 9 on file for this type
▸BISEQUIPMENT USE APPLICATION-PERMIT4
06/06/2013320248282Open ↗
04/29/2015320861288Open ↗
Showing 2 of 4 on file for this type
▸BISSPRINKLER INSP REPORT : FP-853
05/21/2015320861288Open ↗
Showing 1 of 3 on file for this type
▸BISWATER METER PERMIT : DEP-METER3
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 3 on file for this type
▸BISWATER CUT-OFF2
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 2 on file for this type
▸BISEQUIPMENT USE PERMITS1
04/29/2015320861288Open ↗
▸BISFA - FDNY APPROVAL : FD-FAA1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸Safety & Tenant Protection32
▸DOB NOWHPD-1: Anti-Harassment Area Checklist11
09/01/2026B00448943-I1Open ↗
09/01/2026B00448943-P1Open ↗
09/01/2026B00448943-P2Open ↗
Showing 3 of 11 on file for this type
▸BISANTI-HARASSMENT CHECKLIST10
02/12/2019321924147Open ↗
02/06/2019321922782Open ↗
06/15/2018321775539Open ↗
Showing 3 of 10 on file for this type
▸BISTenant Protection Plan and Notes4
03/09/2020321610235Open ↗
02/12/2019321924147Open ↗
02/06/2019321922782Open ↗
Showing 3 of 4 on file for this type
▸BISHPD-1 - Anti-Harassment Area Checklist2
12/27/2013320822605Open ↗
11/09/2013320837029Open ↗
▸BISDEMOLITION SUBMITTAL CERTIFICATION FORM2
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 2 on file for this type
▸BISSRO MD ANTI-HARASSMENT CHECKLIST1
03/17/2020321610235Open ↗
▸BISSTREET TREE CHECKLIST1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸DOB NOWCertificate of No Harassment1
08/13/2026B01142044-I1Open ↗
▸Environmental & Asbestos26
▸DOB NOWDEP ACP-5: Asbestos Assessment Report12
09/02/2026B00446762-I1Open ↗
09/01/2026B00448467-I1Open ↗
09/01/2026B00454792-I1Open ↗
Showing 3 of 12 on file for this type
▸BISASBESTOS: CERTIFICATION (DEP ACP5)5
03/09/2020321610235Open ↗
01/19/2016321245862Open ↗
10/13/2015321238530Open ↗
Showing 3 of 5 on file for this type
▸BISASBESTOS EXEMPTION CERTIFICATION LETTER3
11/09/2013320837029Open ↗
Showing 1 of 3 on file for this type
▸BISTHIS IS 'NOT AN ASBESTOS PROJECT'3
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 3 on file for this type
▸BISACP5 ASBESTOS: CERTIFICATION (DEP ACP5)3
05/29/2014320861288Open ↗
12/27/2013320822605Open ↗
12/27/2013320822605Open ↗
▸Energy Compliance30
▸BISTECHNICAL REPORT: ENERGY CODE PROGRESS INSPS16
03/24/2020321610235Open ↗
03/09/2020321610235Open ↗
02/12/2019321924147Open ↗
Showing 3 of 16 on file for this type
▸BISTR8: Energy Code Progress Inspections5
06/26/2014320822605Open ↗
05/29/2014320861288Open ↗
12/27/2013320822605Open ↗
Showing 3 of 5 on file for this type
▸BISAS-BUILT ENERGY ANALYSIS4
06/15/2016321245862Open ↗
10/22/2015321011908Open ↗
04/29/2015320861288Open ↗
Showing 3 of 4 on file for this type
▸DOB NOWEN2: As Built Energy Analysis.4
09/01/2026B00448943-I1Open ↗
08/13/2026B00448467-I1Open ↗
08/13/2026B00454792-I1Open ↗
Showing 3 of 4 on file for this type
▸BISTECHNICAL REPORT: ENERGY1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸Inspections & Test Reports5
▸BISTECHNICAL REPORT: CONCRETE/TEST CYLINDER3
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 3 on file for this type
▸BISTECHNICAL REPORT: CONCRETE DESIGN MIX2
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 2 on file for this type
▸Approvals, Objections & Sign-offs39
▸BISADMINISTRATIVE OBJECTIONS13
01/19/2016321245862Open ↗
09/21/2015321238530Open ↗
10/09/2014321011908Open ↗
Showing 3 of 13 on file for this type
▸BISCERTIFICATE OF OCCUPANCY/LOC: REQUEST12
06/15/2016321245862Open ↗
10/22/2015321011908Open ↗
06/09/2015321215706Open ↗
Showing 3 of 12 on file for this type
▸BISLETTERS - SUPPORTING DOCUMENTATION8
02/27/2020321775539Open ↗
04/29/2015320861288Open ↗
09/04/2013320902662Open ↗
Showing 3 of 8 on file for this type
▸BISSCHEDULE A - OCCUPANCY / USE5
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 5 on file for this type
▸BISSUPERSEDING LETTER1
05/27/2016321245862Open ↗
▸Cost, Insurance & Ownership25
▸BISCOST AFFIDAVIT24
03/09/2020321610235Open ↗
02/12/2019321924147Open ↗
02/06/2019321922782Open ↗
Showing 3 of 24 on file for this type
▸BISDEPT OF FINANCE VERIFICATION1
09/09/2013320902662Open ↗
▸Filing & Intake Forms40
▸BISEFILING COVER SHEET23
03/09/2020321610235Open ↗
02/08/2019321924147Open ↗
02/04/2019321922782Open ↗
Showing 3 of 23 on file for this type
▸BISADDITIONAL INFORMATION15
03/09/2016321245862Open ↗
09/18/2015321107592Open ↗
07/14/2015321107592Open ↗
Showing 3 of 15 on file for this type
▸BISBOROUGH INTAKE FORM2
09/10/2021321922782Open ↗
03/24/2020321610235Open ↗
▸Other Documents10
▸DOB NOWMultiple Dwelling Special District Feasibility of Government Funded Rehabilitation4
08/13/2026B00164125-I1Open ↗
08/13/2026B00017243-I1Open ↗
08/13/2026B00165841-I1Open ↗
Showing 3 of 4 on file for this type
▸DOB NOWMultiple Dwelling Special District Notice to Community Board4
08/13/2026B00165841-I1Open ↗
08/13/2026B00164125-I1Open ↗
08/13/2026B00017243-I1Open ↗
Showing 3 of 4 on file for this type
▸BISOP-4 - Special Report1
06/09/2015321215706Open ↗
▸BISPLOT DIAGRAM1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type