← Back
City residence, one family
267 PUTNAM AVENUE
BROOKLYN · Bedford-Stuyvesant (West) · BIN 3051592
💬 Discuss this project
1910Year Built
2Stories
A4Building Class
R6BZoning
2,400 sfGross Floor Area
1Units
1 Open Violation 0 unresolved · 1 paperwork only ▸FDNY Report ↗
City residence, one family · 2,000 sf lot · 1.2 FAR built · Flood zone X
Locations of Work
ArchitectureStructuralMechanicalPlumbing
Permit Issued — active, not yet Signed-off
RoofUnder Construction31p · 4 filings · 20 docs
Floor 2Under Construction26p · 2 filings · 20 docs
Floor 1Under Construction25p · 2 filings · 20 docs
CellarUnder Construction31p · 4 filings · 20 docs
Basement1p · 1 filing · 20 docs
Sub-BasementUnder Construction25p · 2 filings · 20 docs
▾Sales History (ACRIS)
DatePriceUnitSeller → Buyer$/sf
10/19/2021$1.5M—267 GOLDIE PARTNERS LLC → Private party$625/sf building
07/02/2020$850K—Private party → 267 GOLDIE PARTNERS LLC$354/sf building
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
ALL CITY ENGINEERING, P.C.512/02/2025
DAVID KEANE P.E., P.C.203/11/2025
PILLORI ASSOCIATES303/05/2025
MICHAEL K CHEN ARCHITECTURE203/05/2025
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
CODE2403/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
CORNERSTONE STRUCTURES LLGeneral Contractor304/09/2026
BYPASS MECHANICAL CORPPlumbing207/08/2026
RELIABLE ELEC'L CONTR'SElectrical103/22/2026
FILLER CONSTRUCTION MANGeneral Contractor107/08/2026
UNIQUE CONST CONCEPTS INCGeneral Contractor104/08/2026
AMERICAN STANDARD P&H CORORP.Plumbing107/08/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
ALL CITY ENGINEERING PC7115712/02/2025
DAVID KEANE PE, P.C.2835203/11/2025
IVAN DESIGN ENGINEERING &6983203/11/2025
MICHAEL K CHEN ARCHITECTU7544203/05/2025
PILLORI ASSOCIATES2317403/05/2025
Building Lifecycle
All (80)Filed (12)Permit Issued (8)Signed Off (2)Violation (5)Inspection (3)Objection (20)Special Inspection (30)
05/22/2026
Signed off — Alteration
ALTERATION RESIDENCE, NO CHANGE OF OCCUPANCY, USE, EGRESS OR ZONING IN THISAPPLICATION
B08011405-I1
12/31/2025
Signed off — Alteration
PROVIDE NEW MECHANICAL SYSTEM FOR SINGLE FAMILY HOUSE.NO CHANGE IN USE, EGRESS OR OCCUPANCY
B08011687-I1
12/04/2025
Special inspection requirement — Fire-Resistant Penetrations and Joints
Liangkai Xia
12/04/2025
Special inspection requirement — Maintenance information
Liangkai Xia
12/04/2025
Special inspection requirement — Mechanical Systems
Liangkai Xia
12/04/2025
Special inspection requirement — HVAC-R and service water piping design and insulation
Liangkai Xia
12/04/2025
Special inspection requirement — Final
Liangkai Xia
12/04/2025
Special inspection requirement — Energy Code Compliance Inspections
Liangkai Xia
12/04/2025
Special inspection requirement — HVAC-R and service water heating equipment
Liangkai Xia
12/04/2025
Special inspection requirement — HVAC-R and service water heating system controls
Liangkai Xia
12/04/2025
Special inspection requirement — Permanent certificate
Liangkai Xia
12/02/2025
Filed — Alteration
PROVIDE NEW MECHANICAL SYSTEM FOR SINGLE FAMILY HOUSE.NO CHANGE IN USE, EGRESS OR OCCUPANCY
B08011687-P1
10/21/2025
Special inspection requirement — HVAC-R and service water piping design and insulation
Liangkai Xia
10/21/2025
Special inspection requirement — Maintenance information
Liangkai Xia
10/21/2025
Special inspection requirement — HVAC-R and service water heating equipment
Liangkai Xia
10/21/2025
Special inspection requirement — Final
Liangkai Xia
10/21/2025
Special inspection requirement — Permanent certificate
Liangkai Xia
10/21/2025
Special inspection requirement — Mechanical Systems
Liangkai Xia
10/21/2025
Special inspection requirement — Energy Code Compliance Inspections
Liangkai Xia
10/21/2025
Special inspection requirement — Fire-Resistant Penetrations and Joints
Liangkai Xia
10/21/2025
Special inspection requirement — HVAC-R and service water heating system controls
Liangkai Xia
10/15/2025
Special inspection requirement — Permanent certificate
Liangkai Xia
10/15/2025
Special inspection requirement — HVAC-R and service water heating system controls
Liangkai Xia
10/15/2025
Special inspection requirement — Maintenance information
Liangkai Xia
10/15/2025
Special inspection requirement — HVAC-R and service water heating equipment
Liangkai Xia
10/15/2025
Special inspection requirement — HVAC-R and service water piping design and insulation
Liangkai Xia
10/15/2025
Special inspection requirement — Energy Code Compliance Inspections
Liangkai Xia
10/15/2025
Special inspection requirement — Fire-Resistant Penetrations and Joints
Liangkai Xia
10/14/2025
Filed — Alteration
this application is plumbing work type only and propose plumbing scope of work filed. there is no change of use, egress or occupancy filed under this application
B08011627-P2
09/29/2025
Permit issued — General Construction
B08011405-I1-GC
09/16/2025
Special inspection requirement — Fire-Resistant Penetrations and Joints
Liangkai Xia
09/16/2025
Special inspection requirement — Permanent certificate
Liangkai Xia
09/16/2025
Special inspection requirement — Maintenance information
Liangkai Xia
09/16/2025
Special inspection requirement — HVAC-R and service water heating equipment
Liangkai Xia
09/16/2025
Special inspection requirement — HVAC-R and service water piping design and insulation
Liangkai Xia
08/26/2025
Permit issued — Plumbing
B08011627-I1-PL
08/04/2025
Permit issued — General Construction
B08011405-I1-GC
03/11/2025
Filed — Alteration
Vertical soil cuts, lagging trenches & slope excavation will be used in the excavation for the new foundation elements. Concrete underpinning will be performed under the section of the existing retaining wall that is not demolished.
B00881154-P2
03/06/2025
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Roughing
Certified
View inspection ↗
03/05/2025
Filed — Alteration
Vertical soil cuts, lagging trenches & slope excavation will be used in the excavation for the new foundation elements. Concrete underpinning will be performed under the section of the existing retaining wall that is not demolished.
B00881154-P1
03/05/2025
Filed — Alteration
ALTERATION RESIDENCE, NO CHANGE OF OCCUPANCY, USE, EGRESS OR ZONING IN THISAPPLICATION
B08011405-P1
01/31/2025
Filed — Alteration
this application is plumbing work type only and propose plumbing scope of work filed. there is no change of use, egress or occupancy filed under this application
B08011627-P1
10/25/2024
Violation issued (ECB, open)
Construction
09/03/2024
Inspection — Certified Storm Drainage-ST-Piping-Underground
Certified
View inspection ↗
09/03/2024
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Underground
Certified
View inspection ↗
06/20/2024
Permit issued — Plumbing
B08011627-I1-PL
01/16/2024
Objection resolved — Addressed
12/20/2023
Objection raised — Other
12/20/2023
Objection raised — Structural
12/20/2023
Objection resolved — Addressed
12/20/2023
Objection raised — Admin
12/20/2023
Objection resolved — Addressed
12/15/2023
Filed — Alteration
Vertical soil cuts, lagging trenches & slope excavation will be used in the excavation for the new foundation elements. Concrete underpinning will be performed under the section of the existing retaining wall that is not demolished.
B00881154-S2
12/07/2023
Permit issued — Plumbing
B08011627-I1-PL
11/28/2023
Permit issued — Structural
B00881154-I1-ST
11/02/2023
Objection resolved — Addressed
10/27/2023
Objection resolved — Addressed
10/16/2023
Objection raised — Scope
10/10/2023
Objection raised — Other
10/10/2023
Objection resolved — Addressed
Latest 60 of 80 events.
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWGeneral ConstructionSigned-offFILLER CONSTRUCTION MAN09/29/2025
DOB NOWPlumbingSigned-offBYPASS MECHANICAL CORP08/26/2025
DOB NOWGeneral ConstructionSigned-offUNIQUE CONST CONCEPTS INC08/04/2025
DOB NOWPlumbingSigned-offBYPASS MECHANICAL CORP06/20/2024
DOB NOWPlumbingPermit IssuedAMERICAN STANDARD P&H CORORP.12/07/2023
DOB NOWStructuralPermit IssuedCORNERSTONE STRUCTURES LL11/28/2023
DOB NOWMechanical SystemsSigned-offCORNERSTONE STRUCTURES LL07/31/2023
DOB NOWGeneral ConstructionSigned-offCORNERSTONE STRUCTURES LL07/31/2023
1 project · most recent 10/14/2025
Gas Storm Water/Sanitary
FiledStatusContractorScope
10/14/2025Signed-offPLUMBING WORKS CORPGas, Storm, Water/Sanitary
2 projects · most recent 02/19/2025
General Wiring
FiledStatusContractorScope
02/19/2025CompleteRELIABLE ELEC'L CONTR'SGeneral Wiring
08/18/2024CompleteRELIABLE ELEC'L CONTR'SGeneral Wiring
1 project · most recent 03/11/2025
Steel Concrete Masonry
FiledStatusContractorScope
03/11/2025Permit IssuedCORNERSTONE STRUCTURES LLSteel, Concrete, Masonry
▾Field Inspections (DOB CAP) — 3
DateTypeResultReport
03/06/2025Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
09/03/2024Certified Storm Drainage-ST-Piping-UndergroundCertifiedView ↗
09/03/2024Certified Water and Sanitary-WS-Sanitary Piping-UndergroundCertifiedView ↗
▾Special Inspection Requirements (DOB NOW) — 75
DateRequirementInspectorRole
12/04/2025Maintenance informationLiangkai Xiaenergy_progress
12/04/2025HVAC-R and service water piping design and insulationLiangkai Xiaenergy_progress
12/04/2025HVAC-R and service water heating equipmentLiangkai Xiaenergy_progress
12/04/2025HVAC-R and service water heating system controlsLiangkai Xiaenergy_progress
12/04/2025Permanent certificateLiangkai Xiaenergy_progress
12/04/2025Mechanical SystemsLiangkai Xiaspecial
12/04/2025Fire-Resistant Penetrations and JointsLiangkai Xiaspecial
12/04/2025Energy Code Compliance InspectionsLiangkai Xiaprogress
12/04/2025FinalLiangkai Xiaprogress
10/21/2025Fire-Resistant Penetrations and JointsLiangkai Xiaspecial
10/21/2025HVAC-R and service water heating equipmentLiangkai Xiaenergy_progress
10/21/2025HVAC-R and service water heating system controlsLiangkai Xiaenergy_progress
10/21/2025Maintenance informationLiangkai Xiaenergy_progress
10/21/2025Permanent certificateLiangkai Xiaenergy_progress
10/21/2025FinalLiangkai Xiaprogress
10/21/2025Energy Code Compliance InspectionsLiangkai Xiaprogress
10/21/2025Mechanical SystemsLiangkai Xiaspecial
10/21/2025HVAC-R and service water piping design and insulationLiangkai Xiaenergy_progress
10/15/2025Maintenance informationLiangkai Xiaenergy_progress
10/15/2025Fire-Resistant Penetrations and JointsLiangkai Xiaspecial
10/15/2025Permanent certificateLiangkai Xiaenergy_progress
10/15/2025HVAC-R and service water piping design and insulationLiangkai Xiaenergy_progress
10/15/2025Energy Code Compliance InspectionsLiangkai Xiaprogress
10/15/2025HVAC-R and service water heating equipmentLiangkai Xiaenergy_progress
10/15/2025HVAC-R and service water heating system controlsLiangkai Xiaenergy_progress
Latest 25 of 75.
▾Documents — 107 on file (BIS + DOB NOW)
▸Plans & Drawings12
▸DOB NOWPlans/Sketch12
08/27/2026B08011687-I1Request digital key ↗
08/27/2026B08011687-P1Request digital key ↗
08/22/2026B00881154-S2Request digital key ↗
Showing 3 of 12 on file for this type
▸Seals & Professional Certifications79
▸DOB NOWProgress Inspector Seal & Signature42
09/01/2026B00881154-P2Open ↗
09/01/2026B00881154-P2Open ↗
08/29/2026B00881154-S2Open ↗
Showing 3 of 42 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature25
09/01/2026B00881154-P2Open ↗
09/01/2026B00881154-P2Open ↗
09/01/2026B00881154-P2Open ↗
Showing 3 of 25 on file for this type
▸DOB NOWDPL-1: Design Professional Seal & Signature12
08/27/2026B08011687-I1Open ↗
08/22/2026B00881154-S2Open ↗
08/22/2026B00881154-P2Open ↗
Showing 3 of 12 on file for this type
▸Environmental & Asbestos12
▸DOB NOWDEP ACP-5: Asbestos Assessment Report12
08/27/2026B08011687-I1Open ↗
08/22/2026B00881154-P1Open ↗
08/22/2026B00881154-S2Open ↗
Showing 3 of 12 on file for this type
▸Inspections & Test Reports2
▸DOB NOWGeotechnical Report (BC 1803.6)2
08/13/2026B00881154-S2Open ↗
08/13/2026B00881154-S1Open ↗
▸Other Documents2
▸DOB NOWLocal Law 92/94 of 2019 Sustainable Roof Zone2
08/13/2026B08011405-I1Open ↗
08/13/2026B08011405-P1Open ↗