← Back
BuildNYC
Two family converted from one family
267 RUTLAND ROAD
BROOKLYN · BIN 3115270
💬 Discuss this project
1899Year Built
2Stories
B3Building Class
R6Zoning
1,998 sfGross Floor Area
2Units
Two family converted from one family · 4,000 sf lot · 0.5 FAR built · Flood zone X
Locations of Work
Architecture
Names shown beside floors are taken automatically from the text of filed documents and may be incomplete or wrong.
Permit Issued — active, not yet Signed-off
RoofDemolition and Shoring2 filings · 20 docs
AtticDemolition and Shoring1 filing · 3 docs
Floor 2Demolition and Shoring1 filing · 3 docs
Floor 1Demolition and Shoring2 filings · 20 docs
CellarDemolition and Shoring2 filings · 20 docs
Site & exteriorConcrete garage signUnder Construction1p · 1 filing · 2 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
BJLK Development1310/28/2026
▾Sales History (ACRIS)
DatePriceUnitSeller → Buyer$/sf
03/27/2026$1.9M—Private party → BJLK Development$951/sf building
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
Jian Deng610/23/2026
Yang Engineering607/15/2026
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
SD Design Studio403/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
Mega General Construction NYCScaffold104/09/2026
Building Lifecycle
11/12/2026
Objection raised — Other
11/12/2026
Objection resolved — Resolved
11/02/2026
Objection raised — Other
10/23/2026
Filed — ALT-CO - New Building with Existing Elements to Remain
CONVERT EXISTING 1-FAMILY TO 10-FAMILY WITH HORIZONTAL AND VERTICAL ENLARGEMENT. OBTAIN NEW CERTIFICATE OF OCCUPANCY.
B01366365-S8
10/23/2026
Filed — ALT-CO - New Building with Existing Elements to Remain
CONVERT EXISTING 1-FAMILY TO 10-FAMILY WITH HORIZONTAL AND VERTICAL ENLARGEMENT. OBTAIN NEW CERTIFICATE OF OCCUPANCY.
B01366365-Z1
68 history events on file for this building. Sign in free to see the full history. Sign in · Create account
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWConstruction FencePermit IssuedMega General Construction NYC04/07/2026
1 project · most recent 10/23/2026
Heating and Air Conditioning Systems Ventilation Systems
FiledStatusContractorScope
10/23/2026——Heating and Air Conditioning Systems, Ventilation Systems
1 project · most recent 10/23/2026
Sprinkler System
FiledStatusContractorScope
10/23/2026——Sprinkler System
1 project · most recent 10/23/2026
Gas Storm Water/Sanitary
FiledStatusContractorScope
10/23/2026——Gas, Storm, Water/Sanitary
1 project · most recent 10/06/2026
FiledStatusContractorScope
10/06/2026Permit IssuedKwong Ming Electric—
2 projects · most recent 10/23/2026
Steel Concrete Masonry
FiledStatusContractorScope
10/23/2026——Steel, Concrete, Masonry
06/13/2026———
1 project · most recent 03/31/2026
Fence
FiledStatusContractorScope
03/31/2026Permit IssuedMega General Construction NYCFence
▾Special Inspection Requirements (DOB NOW) — 64
DateRequirementInspectorRole
10/23/2026Footing and Foundation—progress
10/23/2026Subsurface Investigations (Borings/Test Pits)—special
10/23/2026Subgrade Inspections—special
10/23/2026Excavations - Sheeting, Shoring, and Bracing—special
10/23/2026Concrete - Cast-In-Place—special
10/23/2026Structural Stability – Alterations of existing buildings—special
10/23/2026Structural Stability – Alterations of existing buildings—special
10/23/2026Subgrade Inspections—special
10/23/2026Excavations - Sheeting, Shoring, and Bracing—special
10/23/2026Concrete - Cast-In-Place—special
10/23/2026Subsurface Investigations (Borings/Test Pits)—special
10/23/2026Structural Steel - Details—special
10/23/2026Final—progress
10/23/2026Underpinning—special
07/02/2026Subsurface Conditions – Fill Placement & In-Place Density—special
07/02/2026Subsurface Investigations (Borings/Test Pits)—special
07/02/2026Subgrade Inspections—special
07/02/2026Structural Steel - Details—special
07/02/2026Concrete - Cast-In-Place—special
07/02/2026Excavations - Sheeting, Shoring, and Bracing—special
05/15/2026Final—progress
05/15/2026Structural Stability – Alterations of existing buildings—special
05/15/2026Footing and Foundation—progress
05/15/2026Sprinkler Systems—special
04/01/2026Subgrade Inspections—special
Latest 25 of 64.
37 filed documents on file for this building. Sign in free to see the full history. Sign in · Create account