Condo, residential tower (mixed-use, multi-family elevator) [derived]
The Balton Commons Condominium
267 WEST 126 STREET · Harlem (North) · BIN 1091580
💬 Discuss this project
0Year Built
7Stories
RMBuilding Class
R7-2Zoning
32,813 sfGross Floor Area
3Units
LL97 CoveredRent Stabilized33 Open Violations ▸
Condo, residential tower (mixed-use, multi-family elevator) [derived] · Owner of record: HCCI BALTON HOUSING DEVELOPMENT FUND COR PORATION · 8,493 sf lot · 3.86 FAR built · Flood zone X
Locations of Work
ArchitectureStructuralElectricalMechanicalPlumbingFire ProtectionGeneralOther
Roof13p · 5 filings · 20 docs
Floor 78p · 2 filings · 20 docs
Floor 68p · 2 filings · 20 docs
Floor 57p · 2 filings · 20 docs
Floor 48p · 2 filings · 20 docs
Floor 37p · 2 filings · 20 docs
Floor 27p · 2 filings · 20 docs
Floor 117p · 3 filings · 20 docs
Cellar11p · 3 filings · 20 docs
Site & exterior13p · 5 filings · 20 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
407 LENOX AVENUE6207/08/2026
HOUSING PRESERVATION DEVELOP2903/21/2026
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
JOHNSON & URBAN711/14/2023
DAMORE STUDIO111/09/2023
HM LOKE CONSULTING ENGINEERING PC208/27/2021
HSU & ASSOCIATES208/23/2021
PAUL PERDEK, PROF. ENG. PLLC508/12/2021
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
W J PROFESSIONAL EXPEDITING COMPANY1603/21/2026
BUILD TEAM403/21/2026
A1 EXPEDITING SERVICE1003/21/2026
HM LOKE CONSULTING ENGINEERING PC203/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
BENT MECHANICAL CORPFire Protection407/08/2026
MILLER PLUMBING & HTG INCFire Protection407/08/2026
ROCKLEDGE SCAFFOLD CORPGeneral Contractor307/08/2026
4 BROTHERS & SONS FENCEGeneral Contractor307/08/2026
APEX BUILDING COMPANY INCGeneral Contractor307/08/2026
WOODHAVEN MASON LLCGeneral Contractor207/08/2026
NATIONWIDE MECHANICAL INCPlumbing207/08/2026
MILLER PLBG & HTG INCPlumbing207/08/2026
MAJOR GENERAL CON 1 CORPGeneral Contractor107/08/2026
METROPOLIS ELECTRIC CORPElectrical103/22/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
VIBRANALYSIS INC., DBA VT6864511/14/2023
Building Lifecycle
All (135)Filed (17)Permit Issued (22)Signed Off (7)Violation (60)Inspection (5)Special Inspection (24)
06/04/2026
Violation issued (HPD, closed)
C
05/28/2026
Violation issued (HPD, open)
C
05/08/2026
Violation issued (HPD, open)
A
04/25/2026
Violation issued (HPD, closed)
B
04/25/2026
Violation issued (HPD, closed)
C
04/17/2026
Violation issued (HPD, closed)
B
04/17/2026
Violation issued (HPD, open)
C
04/17/2026
Violation issued (HPD, open)
C
04/17/2026
Violation issued (HPD, closed)
B
04/17/2026
Violation issued (HPD, closed)
B
04/04/2026
Violation issued (HPD, closed)
B
04/04/2026
Violation issued (HPD, closed)
B
04/04/2026
Violation issued (HPD, closed)
B
01/22/2026
Violation issued (HPD, closed)
B
01/22/2026
Violation issued (HPD, closed)
A
01/22/2026
Violation issued (HPD, closed)
B
01/22/2026
Violation issued (HPD, open)
A
12/17/2025
Violation issued (HPD, open)
B
11/17/2025
Violation issued (HPD, closed)
I
09/19/2025
Violation issued (HPD, closed)
C
09/19/2025
Violation issued (HPD, open)
C
09/19/2025
Violation issued (HPD, open)
A
09/19/2025
Violation issued (HPD, closed)
C
08/28/2025
Violation issued (HPD, open)
A
08/28/2025
Violation issued (HPD, open)
B
08/28/2025
Violation issued (HPD, closed)
B
08/28/2025
Violation issued (HPD, open)
B
08/28/2025
Violation issued (HPD, closed)
A
08/28/2025
Violation issued (HPD, open)
B
08/28/2025
Violation issued (HPD, closed)
C
08/28/2025
Violation issued (HPD, closed)
B
08/27/2025
Violation issued (HPD, closed)
C
08/05/2025
Violation issued (HPD, open)
A
08/05/2025
Violation issued (HPD, open)
A
08/05/2025
Violation issued (HPD, open)
B
08/05/2025
Violation issued (HPD, open)
B
06/13/2025
Violation issued (HPD, open)
A
11/16/2024
Violation issued (HPD, closed)
B
11/16/2024
Violation issued (HPD, closed)
B
11/15/2024
Violation issued (HPD, closed)
B
11/15/2024
Violation issued (HPD, closed)
B
11/15/2024
Violation issued (HPD, closed)
B
11/15/2024
Violation issued (HPD, closed)
B
11/15/2024
Violation issued (HPD, closed)
C
11/15/2024
Violation issued (HPD, closed)
B
11/15/2024
Violation issued (HPD, closed)
C
11/15/2024
Violation issued (HPD, closed)
B
11/15/2024
Violation issued (HPD, closed)
B
11/15/2024
Violation issued (HPD, closed)
B
11/15/2024
Violation issued (HPD, closed)
B
11/15/2024
Violation issued (HPD, closed)
B
11/11/2024
Violation issued (HPD, closed)
C
11/11/2024
Violation issued (HPD, closed)
B
11/11/2024
Violation issued (HPD, closed)
B
11/11/2024
Violation issued (HPD, closed)
B
11/11/2024
Violation issued (HPD, closed)
B
11/11/2024
Violation issued (HPD, closed)
B
11/11/2024
Violation issued (HPD, closed)
C
11/11/2024
Violation issued (HPD, closed)
B
11/11/2024
Violation issued (HPD, closed)
B
Latest 60 of 135 events.
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWPlumbingSigned-offNATIONWIDE MECHANICAL INC01/03/2024
DOB NOWPlumbingSigned-offNATIONWIDE MECHANICAL INC12/21/2023
DOB NOWGeneral ConstructionPermit IssuedAPEX BUILDING COMPANY INC12/18/2023
DOB NOWMechanical SystemsPermit IssuedAPEX BUILDING COMPANY INC12/18/2023
DOB NOWStandpipeSigned-offBENT MECHANICAL CORP05/23/2022
DOB NOWBoiler EquipmentSigned-offMILLER PLBG & HTG INC11/19/2021
DOB NOWBoiler EquipmentPermit IssuedMILLER PLBG & HTG INC09/14/2021
DOB NOWSupported ScaffoldSigned-offWOODHAVEN MASON LLC09/14/2021
DOB NOWStandpipeSigned-offMILLER PLUMBING & HTG INC09/08/2021
DOB NOWSprinklersSigned-offMILLER PLUMBING & HTG INC09/08/2021
DOB NOWConstruction FenceSigned-offMAJOR GENERAL CON 1 CORP08/25/2021
DOB NOWStandpipeSigned-offBENT MECHANICAL CORP08/17/2021
DOB NOWStandpipeSigned-offBENT MECHANICAL CORP03/12/2021
DOB NOWStandpipeSigned-offMILLER PLUMBING & HTG INC01/13/2021
DOB NOWSprinklersSigned-offMILLER PLUMBING & HTG INC01/13/2021
DOB NOWConstruction FenceSigned-off4 BROTHERS SONS FENCE01/11/2021
DOB NOWSupported ScaffoldSigned-offWOODHAVEN MASON LLC11/02/2020
DOB NOWSidewalk ShedSigned-offROCKLEDGE SCAFFOLD CORP10/17/2020
DOB NOWSidewalk ShedSigned-offROCKLEDGE SCAFFOLD CORP10/15/2020
DOB NOWConstruction FenceSigned-off4 BROTHERS SONS FENCE01/24/2020
DOB NOWStandpipeSigned-offBENT MECHANICAL CORP01/13/2020
DOB NOWConstruction FenceSigned-off4 BROTHERS SONS FENCE12/06/2019
BIS—ISSUEDAPEX BUILDING COMPANY INC08/23/2022
BIS—ISSUEDAPEX BUILDING COMPANY INC03/07/2022
BIS—ISSUEDWJ PROFESSIONAL EXPEDITIN12/23/2021
BISPLISSUEDBENT MECHANICAL CORP08/16/2021
BISEQISSUEDROCKLEDGE SCAFFOLD CORP07/21/2021
BIS—ISSUEDAPEX BUILDING COMPANY INC04/26/2021
BIS—ISSUEDAPEX BUILDING COMPANY INC04/26/2021
BIS—ISSUEDAPEX BUILDING COMPANY INC04/08/2021
BIS—ISSUEDAPEX BUILDING COMPANY INC04/08/2021
BIS—ISSUEDAPEX BUILDING COMPANY INC01/07/2021
BIS—ISSUEDAPEX BUILDING COMPANY INC01/07/2021
BISEQISSUEDROCKLEDGE SCAFFOLD CORP08/31/2020
BISPLISSUEDBENT MECHANICAL CORP07/27/2020
BIS—ISSUEDAPEX BUILDING COMPANY INC01/27/2020
BIS—ISSUEDAPEX BUILDING COMPANY INC01/27/2020
1 project · most recent 11/14/2023
Heating and Air Conditioning Systems Heating Systems Ventilation Systems
FiledStatusContractorScopeMake / Model / Capacity
11/14/2023Permit IssuedAPEX BUILDING COMPANY INCHeating and Air Conditioning Systems, Heating Systems, Ventilation Systems
Heat / Cool
Daikin FXAQ07PVJU 8,700 BTU · Vrf Indoor ×4
FXAQ12PVJU 14,000 BTU · Vrf Indoor ×3
RXTQ48TAVJUA 49,500 BTU · Vrf Outdoor ×2
FXAQ24PVJU 26,500 BTU · Vrf Indoor ×1
Heating
Markel F3052T2DWB 6,826 BTU · Electric Heater ×2
Ventilation
Greenheck GRSI-12 450 CFM ×1
GRSR-12 450 CFM · Exhaust Fan ×1
Daikin VAM470GVJU 450 CFM · Erv ×1
1 project · most recent 11/14/2023
Water/Sanitary
FiledStatusContractorScope
11/14/2023Signed-offNATIONWIDE MECHANICAL INCWater/Sanitary
5 projects · most recent 07/18/2022
General Wiring
FiledStatusContractorScope
07/18/2022CompleteMETROPOLIS ELECTRIC CORPGeneral Wiring
01/06/2021CompleteTUXEDO ELEC'L CONTR'G INC—
09/30/2020CompleteANTHONY G FERRY INC—
07/30/2020CompleteMETROPOLIS ELECTRIC CORP—
04/13/2020CompleteMETROPOLIS ELECTRIC CORP1 meters, 1 new_meters
▾Field Inspections (DOB CAP) — 5
DateTypeResultReport
02/23/2024Pass-Final Antenna WithdrawalPassView ↗
01/23/2024Certified Water and Sanitary-WS-Fixtures-FinishCertifiedView ↗
01/12/2024Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
12/16/2021Pass-Final Boiler Equipment InspectionPassView ↗
09/21/2021Fail-Final Boiler Equipment InspectionFailView ↗
▾Special Inspection Requirements (DOB NOW) — 24
DateRequirementInspectorRole
11/13/2023Maintenance informationJUAN GOMEZenergy_progress
11/13/2023HVAC-R and service water heating equipmentJUAN GOMEZenergy_progress
11/13/2023HVAC-R and service water piping design and insulationJUAN GOMEZenergy_progress
11/13/2023HVAC-R and service water heating system controlsJUAN GOMEZenergy_progress
11/02/2023Tenant Protection Plan ComplianceJUAN GOMEZspecial
11/02/2023Fire-Resistant Penetrations and JointsJUAN GOMEZspecial
11/02/2023Mechanical SystemsJUAN GOMEZspecial
11/02/2023FinalJUAN GOMEZprogress
11/02/2023Tenant Protection Plan ComplianceJUAN GOMEZspecial
11/02/2023Tenant Protection Plan ComplianceJUAN GOMEZspecial
11/02/2023Fire-Resistant Penetrations and JointsJUAN GOMEZspecial
11/02/2023FinalJUAN GOMEZprogress
12/13/2021Sprinkler Systems—special
12/13/2021Standpipe Systems—special
10/29/2021Maintenance informationJUAN GOMEZenergy_progress
10/27/2021HVAC-R and service water heating system controlsJUAN GOMEZenergy_progress
10/27/2021Heating SystemsJUAN GOMEZspecial
10/27/2021HVAC-R and service water heating equipmentJUAN GOMEZenergy_progress
09/14/2021Standpipe Systems—special
08/27/2021FinalHENG LOKEprogress
08/24/2021FinalChih Hsuprogress
08/17/2021FinalPaul Perdekprogress
09/28/2020FinalPaul Perdekprogress
11/26/2019FinalPaul Perdekprogress
▾Documents — 289 on file (BIS + DOB NOW)
▸Plans & Drawings15
▸DOB NOWPlans/Sketch6
09/03/2026M00576911-P1Request digital key ↗
09/03/2026M00576911-I1Request digital key ↗
09/03/2026M00619523-I1Request digital key ↗
Showing 3 of 6 on file for this type
▸DOB NOWPlans/Sketch - Sidewalk Shed4
09/04/2026M00405392-I1Request digital key ↗
09/03/2026M00413673-I1Request digital key ↗
09/03/2026M00413673-P2Request digital key ↗
Showing 3 of 4 on file for this type
▸DOB NOWPlans/Sketch - Standpipe2
09/05/2026M00278490-P1Request digital key ↗
09/05/2026M00278490-I1Request digital key ↗
▸DOB NOWPlans/Sketch - Supported Scaffold2
09/03/2026M00421208-P1Request digital key ↗
09/03/2026M00421208-I1Request digital key ↗
▸DOB NOWPlans/Sketch - Construction Fence1
09/05/2026M00272444-I1Request digital key ↗
▸Applications & Permits47
▸BISPLAN / WORK APPROVAL APPLICATION32
05/08/2023121189579Open ↗
04/24/2023121189579Open ↗
06/28/2022121189579Open ↗
Showing 3 of 32 on file for this type
▸BISWORK PERMIT APPLICATION14
08/24/2022121189579Open ↗
08/23/2022121189579Open ↗
03/09/2022121189579Open ↗
Showing 3 of 14 on file for this type
▸BISCERTIFICATE OF OCCUPANCY: APPLICATION1
02/26/2021121189579Open ↗
▸Zoning, Tax Lot & Property Records12
▸BISZONING EXHIBIT III:DESC. & OWNRSHP.STMNT2
08/10/2022123915380Open ↗
10/29/2019121189579Open ↗
▸BISTAX LOT: TENTATIVE LOT NUMBER ISSUED2
08/10/2022123915380Open ↗
07/24/2019121189579Open ↗
▸BISADDRESS: NEW HOUSE NUMBER APPROVED2
05/18/2023121189579Open ↗
08/10/2022123915380Open ↗
▸BISZONING DIAGRAM2
03/31/2021121189579Open ↗
11/01/2019121189579Open ↗
▸BISZONING EXHIBIT II: CERTIFICATION2
08/10/2022123915380Open ↗
10/29/2019121189579Open ↗
▸BISVERIFY TAX LOT1
05/18/2023121189579Open ↗
▸BISCO OBJ: VERIFY ADDRESS-TOPO STAMP1
03/10/2023121189579Open ↗
▸Seals & Professional Certifications40
▸DOB NOWDPL-1: Design Professional Seal & Signature15
09/05/2026M00278490-I1Open ↗
09/05/2026M00278490-P1Open ↗
09/04/2026M00405392-I1Open ↗
Showing 3 of 15 on file for this type
▸DOB NOWProgress Inspector Seal & Signature11
09/23/2026M00619523-I1Open ↗
09/23/2026M00619523-I1Open ↗
09/23/2026M00619523-I1Open ↗
Showing 3 of 11 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature10
09/23/2026M00619523-I1Open ↗
09/01/2026M00955616-S2Open ↗
08/27/2026M00955616-I1Open ↗
Showing 3 of 10 on file for this type
▸BISAPPLICANT OWNER SIGNATURE1
05/21/2020140855787Open ↗
▸BISTECHNICAL REPORT STATEMENT OF RESPONSIBILITY1
08/26/2020140944744Open ↗
▸BISTECHNICAL REPORT: RESPONSIBILITY/CERTIFICATION1
01/28/2020121189579Open ↗
▸BISREQUIRED ITEMS CHECKLIST FOR PROFESSIONAL CERTIFICATION1
08/26/2020140944744Open ↗
▸Trade Schedules & Equipment6
▸BISSCHEDULE B - PLUMBING2
05/05/2022121189579Open ↗
10/05/2021121189579Open ↗
▸BISDETECTOR:SMOKE-CERT. OF INSTALLATION1
11/03/2021121189579Open ↗
▸BISEQUIPMENT USE APPLICATION/PERMIT1
04/18/2022121189579Open ↗
▸BIS* SEWER CONNECTION: DEP SD1 & SD21
09/25/2019121189579Open ↗
▸BISEQUIPMENT USE PERMITS1
04/18/2022121189579Open ↗
▸Safety & Tenant Protection6
▸BISSTREET TREE CHECKLIST2
05/21/2020140855787Open ↗
07/24/2019121189579Open ↗
▸BISSTREET TREE SUPPORTING DOCUMENT1
01/28/2020121189579Open ↗
▸BISBPP: STREET TREES SITE PLAN1
04/27/2020140855787Open ↗
▸BISSTREET TREE SIGNOFF1
03/10/2023121189579Open ↗
▸BISEXCAVATION - SHEETING, SHORING, AND BRACING1
03/15/2021121189579Open ↗
▸Environmental & Asbestos19
▸DOB NOWOER: Notice to Proceed11
09/05/2026M00278490-P1Open ↗
09/05/2026M00278490-I1Open ↗
09/04/2026M00405392-I1Open ↗
Showing 3 of 11 on file for this type
▸BISENVIRONMENTAL RESTRICTIONS - OER NOTICE OF SATISFACTION3
02/07/2023123729821Open ↗
01/24/2023140855787Open ↗
10/29/2021121189579Open ↗
▸BISENVIRONMENTAL RESTRICTIONS - OER NOTICE TO PROCEED3
08/26/2020140944744Open ↗
04/27/2020140855787Open ↗
Showing 2 of 3 on file for this type
▸DOB NOWOER: Notice of Satisfaction2
09/03/2026M00421208-I1Open ↗
08/13/2026M00619523-I1Open ↗
▸Energy Compliance14
▸BISTECHNICAL REPORT: ENERGY CODE - RESPONSIBILITY10
08/09/2022121189579Open ↗
08/09/2022121189579Open ↗
03/14/2022121189579Open ↗
Showing 3 of 10 on file for this type
▸BISAS-BUILT ENERGY ANALYSIS (EN2)1
03/09/2023121189579Open ↗
▸BISPRELIMINARY COMMISSIONING REPORT CERTIFICATION1
03/22/2023121189579Open ↗
▸DOB NOWEN2: As Built Energy Analysis.1
08/13/2026M00619523-I1Open ↗
▸DOB NOWPreliminary Commissioning Report Certification1
08/13/2026M00619523-I1Open ↗
▸Inspections & Test Reports38
▸BISTECHNICAL REPORT: RESPONSIBILITY25
08/09/2022121189579Open ↗
08/09/2022121189579Open ↗
03/14/2022121189579Open ↗
Showing 3 of 25 on file for this type
▸BISTECHNICAL REPORT: CONCRETE/TEST CYLINDER2
01/17/2020121189579Open ↗
01/15/2020121189579Open ↗
▸BISSTRUCTURAL STEEL - HIGH STRENGTH BOLTING1
03/15/2021121189579Open ↗
▸BISSPRAYED FIRE-RESISTANT MATERIALS1
11/03/2021121189579Open ↗
▸BISSTRUCTURAL STEEL - WELDING1
03/15/2021121189579Open ↗
▸BISSOIL REPORT1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸BISSUBGRADE INSP / SOILS-SITE PREP1
03/15/2021121189579Open ↗
▸BISTECHNICAL REPORT: SOIL INSPECTION1
07/24/2019121189579Open ↗
▸BISTECHNICAL REPORT: CONCRETE DESIGN MIX1
01/17/2020121189579Open ↗
▸BISDEMOLITION (DM) JOB SIGNOFF1
03/10/2023121189579Open ↗
▸BISSUBSURFACE / SOILS-FILL PLACEMENT IN-PLACE DENSITY1
03/15/2021121189579Open ↗
▸BISCONCRETE - CAST-IN-PLACE1
03/15/2021121189579Open ↗
▸BISTR2: CONCRETE FIELD TESTING TECHNICAL REPORT1
03/15/2021121189579Open ↗
▸Approvals, Objections & Sign-offs31
▸BISSCHEDULE A - OCCUPANCY / USE9
06/28/2022121189579Open ↗
05/17/2022121189579Open ↗
04/13/2022121189579Open ↗
Showing 3 of 9 on file for this type
▸DOB NOWFee Exempt Supporting Document - DOF ACRIS report or BIB letter5
09/03/2026M00576911-I1Open ↗
09/03/2026M00576911-P1Open ↗
09/03/2026M00421208-P1Open ↗
Showing 3 of 5 on file for this type
▸BISSUPERSEDING LETTER4
08/24/2022121189579Open ↗
03/09/2022121189579Open ↗
04/26/2021121189579Open ↗
Showing 3 of 4 on file for this type
▸BISLETTERS - SUPPORTING DOCUMENTATION4
05/18/2023121189579Open ↗
05/18/2023121189579Open ↗
09/25/2019121189579Open ↗
Showing 3 of 4 on file for this type
▸DOB NOWDesign Commission Approval City Owned (Exterior Work)3
09/05/2026M00278490-I1Open ↗
09/05/2026M00278490-P1Open ↗
08/13/2026M00272444-I1Open ↗
▸BISCERTIFICATE OF OCCUPANCY/LOC: REQUEST2
02/09/2023123729821Open ↗
08/26/2021140944744Open ↗
▸BISDESIGN COMM. APPROVAL: CITY-OWNED PROPERTY (EXTERIOR WORK)2
04/27/2020140855787Open ↗
Showing 1 of 2 on file for this type
▸BISDESIGN COMM. SIGNOFF: CITY-OWNED PROPERTY (EXTERIOR WORK)2
03/09/2023121189579Open ↗
01/24/2023140855787Open ↗
▸Cost, Insurance & Ownership10
▸BISPROJECT-SPECIFIC GL INSURANCE5
12/27/2021121189579Open ↗
04/26/2021121189579Open ↗
04/15/2021121189579Open ↗
Showing 3 of 5 on file for this type
▸BISAcord 25 (Acord Certificate of Liability Insurance)2
04/15/2021121189579Open ↗
04/15/2021121189579Open ↗
▸BISINSURANCE: LIABILITY1
02/09/2023123729821Open ↗
▸BISINSURANCE: WORKERS' COMPENSATION1
02/09/2023123729821Open ↗
▸BISINSURANCE: DISABILITY1
02/09/2023123729821Open ↗
▸Filing & Intake Forms34
▸BISADDITIONAL INFORMATION24
03/22/2023121189579Open ↗
09/22/2022123915380Open ↗
07/07/2022121189579Open ↗
Showing 3 of 24 on file for this type
▸BISEFILING COVER SHEET6
05/17/2022123915380Open ↗
Showing 1 of 6 on file for this type
▸BISBOROUGH INTAKE FORM2
04/26/2021121189579Open ↗
04/15/2021121189579Open ↗
▸BISEFILING JOB APPLICATION COVER SHEET1
08/26/2020140944744Open ↗
▸DOB NOWAI1 Form (from plan PDF)1
08/16/2026M00421208-P1Open ↗
▸Other Documents7
▸BISCONSTRUCTION - SUPPORTING DOCUMENTATION5
05/18/2023121189579Open ↗
08/10/2022123915380Open ↗
08/10/2022123915380Open ↗
Showing 3 of 5 on file for this type
▸BISTCO - Supporting Documents1
05/18/2023121189579Open ↗
▸BISON-SITE STORM WATER DRAIN. DISP. /DETENT INSTALL (DRYWELL)1
03/09/2022121189579Open ↗