← Back
BuildNYC
Elevator apt, semi-fireproof without stores
2670 COLBY COURT
BROOKLYN · BIN 3320675
💬 Discuss this project
1951Year Built
6Stories
D1Building Class
R5Zoning
98,300 sfGross Floor Area
120Units
LL97 CoveredRent Stabilized21 Active Violations 19 unresolved · 2 paperwork only 6 old, status unconfirmed ▸FISP: No Report FiledFDNY Report ↗
Elevator apt, semi-fireproof without stores · Owner of record: Beach Haven Group · 54,405 sf lot · 1.81 FAR built · Flood zone X500
Locations of Work
ArchitectureStructuralElectricalMechanicalEquipmentGeneral
Names shown beside floors are taken automatically from the text of filed documents and may be incomplete or wrong.
Floor 6Beach Haven Facade Restoration7p · 1 filing · 3 docs
Floor 5Beach Haven Facade Restoration7p · 1 filing · 3 docs
Floor 4Beach Haven Facade Restoration7p · 1 filing · 3 docs
Floor 3Beach Haven Facade Restoration7p · 1 filing · 3 docs
Floor 2Beach Haven Facade Restoration7p · 1 filing · 3 docs
Floor 1Beach Haven Facade Restoration11p · 3 filings · 8 docs
Site & exteriorGarage repair work4p · 2 filings · 7 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
Beach Haven Apts Associates603/22/2026
Beach Haven Group103/22/2026
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
Saleh and Associates107/25/2023
Superstructures Engineering +108/30/2021
Arquitectura Varela208/05/2021
Enthink Engineers103/30/2021
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
Atlantic Building Supply203/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
R&A Construction ServicesGeneral Contractor703/22/2026
R&A Construction ServicesScaffold407/08/2026
New American ConstructionScaffold107/08/2026
Premier BuildersGeneral Contractor103/21/2026
WCK ElectricElectrical103/21/2026
A & C Combustion SerbvicesGeneral Contractor107/11/2000
RMZ ContractingGeneral Contractor106/30/2014
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
M. Saleh Engineering8427107/25/2023
Crosscheck Inspection Services544108/30/2021
Building Lifecycle
02/20/2029
Facade inspection report due (FISP Cycle 9, sub-cycle C)
The filing window opened 02/21/2027. No Cycle 9 filing on record yet
09/16/2026
Boiler inspection report filed
Initial · no defects · Accepted
02/10/2026
Elevator Category 1 inspection report filed
09/11/2025
Boiler inspection report filed
Initial · no defects · Accepted
06/04/2025
The applicant of record for job # 320266127 has informed the department that she or he has withdrawn from the project. Application fails to set…
DOB violation · open
203 history events on file for this building. Sign in free to see the full history. Sign in · Create account
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWGeneral ConstructionSigned-offR&A Construction Services09/07/2023
DOB NOWGeneral ConstructionPermit IssuedR&A Construction Services09/16/2021
DOB NOWConstruction FenceSigned-offR&A Construction Services08/11/2021
DOB NOWSidewalk ShedSigned-offR&A Construction Services08/10/2021
DOB NOWSidewalk ShedSigned-offNew American Construction03/30/2021
BISOTISSUEDR&A Construction Services10/24/2019
BISOTISSUEDRMZ Contracting06/30/2014
BISOTISSUEDPremier Builders02/18/2011
BISOTISSUEDA & C Combustion Serbvices07/11/2000
BISOTISSUEDThe Baranello Organization11/26/1996
BISOTISSUEDThe Baranello Organization11/26/1996
BISBLISSUEDA & C Combustion Services12/17/1993
3 projects · most recent 08/20/2021
FiledStatusContractorScope
08/20/2021Permit IssuedWCK Electric—
03/30/2021CompleteRichard Neu—
03/31/2020Permit IssuedStar Electrical Contractors—
▾Field Inspections (DOB CAP) — 2
DateTypeResultReport
08/21/2024Pass-Final General Construction Non-Directive 14PassView ↗
05/16/2024Fail-Final General Construction Non-Directive 14FailView ↗
▾Special Inspection Requirements (DOB NOW) — 7
DateRequirementInspectorRole
07/25/2023Structural Cold-Formed SteelMohamed Salehspecial
07/25/2023Tenant Protection Plan ComplianceMohamed Salehspecial
07/25/2023MasonryMohamed Salehspecial
07/25/2023Structural Steel - DetailsMohamed Salehspecial
07/25/2023Structural Stability – Alterations of existing buildingsMohamed Salehspecial
07/12/2023FinalMohamed Salehprogress
08/05/2021FinalVicente Varelaprogress
50 filed documents on file for this building. Sign in free to see the full history. Sign in · Create account