← Back
BuildNYC
Walk-up cooperative
268 EAST 4TH STREET
MANHATTAN · East Village · BIN 1004616
💬 Discuss this project
1923Year Built
5Stories
C6Building Class
R8BZoning
9,100 sfGross Floor Area
12Units
Rent Stabilized2 Active Violations ▸FDNY Report ↗
Walk-up cooperative · Owner of record: 268 E 4HT St HDFC · 2,382 sf lot · 3.82 FAR built · Flood zone X
Locations of Work
ArchitectureMechanicalPlumbingEquipmentGeneral
Names shown beside floors are taken automatically from the text of filed documents and may be incomplete or wrong.
Permit Issued — active, not yet Signed-off
RoofBoiler room and chimney work1 filing · 6 docs
Floor 5Boiler room and chimney work2 filings · 6 docs
Floor 4Boiler room and chimney work2 filings · 6 docs
Floor 3Boiler room and chimney work2 filings · 6 docs
Floor 2Boiler room and chimney work2 filings · 6 docs
Floor 1Boiler room and chimney work2 filings · 6 docs
BasementLegalize gas fixtures2p · 1 filing · 18 docs
Sub-BasementLegalize gas fixtures9p · 2 filings · 20 docs
Site & exteriorProposed pipe scaffoldUnder Construction6p · 2 filings · 4 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
H F Hewitt Realty2610/15/2026
NYC Department of Housing Preservation and Development403/21/2026
268 E 4HT St HDFC103/22/2026
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
Bitopi Consultants110/14/2026
Always Fast Services209/30/2026
Superior Home Inspection Services510/11/2025
New York & Company110/09/2024
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
New York & Company203/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
Ageless ChimneyGeneral Contractor203/21/2026
Andamio ScaffoldingScaffold210/04/2026
Hepco Heating & PlumbingPlumbing207/08/2026
Star-Del ElectricElectrical103/21/2026
Spectrum ElectricElectrical103/21/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
Bitopi Consultants7036110/14/2026
Superior - Home Inspectio1804510/11/2025
New York Engineering Associates851110/09/2024
Building Lifecycle
All (78)Filed (9)Permit Issued (7)Violation (31)Inspection (4)Objection (12)Special Inspection (15)
10/14/2026
Filed — Alteration
STUCCO REPAIR WORK AS PER PLANS. NO CHANGE IN USE, EGRESS OR OCCUPANCY. WORK SHALL COMPLY WITH CHAPTER 33 OF THE 2022 NYC BUILDING CODE.
M01462118-I1
10/01/2026
Permit issued — Supported Scaffold
M01466850-I1-SF
09/30/2026
Filed — Alteration
PROPOSED INSTALLATION OF TEMPORARY PIPE SCAFFOLD AS PER PLANS. WORK SHALL COMPLY WITH CHAPTER #33 OF 2022 THE NYC BUILDING CODE. NO CHANGE IN USE, OCCUPANCY, OR EGRESS UNDER THIS APPLICATION.
M01466850-I1
09/30/2026
Filed — Alteration
INSTALLATION OF TEMPORARY HEAVY DUTY SIDEWALK SHED AS PER PLANS. NO CHANGE IN USE, EGRESS OR OCCUPANCY. SIDEWALK SHED SHALL COMPLY WITH CHAPTER #33 OF THE NYC BUILDING CODE. LIVE LOAD 300PSF.
M01466847-I1
09/30/2026
Permit issued — Sidewalk Shed
M01466847-I1-SH
09/18/2026
Special inspection requirement — Tenant Protection Plan Compliance
KAMRUL AHSAN
09/18/2026
Special inspection requirement — Masonry
KAMRUL AHSAN
04/29/2026
Violation issued (HPD, open)
A
11/20/2025
Inspection — Pass-Final PL - Up to 3 Requested Floors
Pass
View inspection ↗
11/07/2025
Special inspection requirement — Tenant Protection Plan Compliance
Steven Williams
11/07/2025
Special inspection requirement — Fire-Resistant Penetrations and Joints
Steven Williams
10/11/2025
Filed — Alteration
INSTALL NEW GAS METER TO ACCOMMDATE NEW DUAL BURNER FOR EX. OIL BOILER AND INSTALL NEW HOT WATER HEATER. NO EXISTING BUILDING MATERIAL TO BE DISTURBED UNDER THIS APPLICATION. NO CHANGE IN USE, EGRESS, BULK OR OCCUPANCY.
M00769191-P2
10/10/2025
Special inspection requirement — Fire-Resistant Penetrations and Joints
Steven Williams
10/10/2025
Special inspection requirement — Tenant Protection Plan Compliance
10/03/2025
Permit issued — Boiler Equipment
M00769191-S1-BE
09/23/2025
Inspection — Pass-Final PL - Up to 3 Requested Floors
Pass
View inspection ↗
09/04/2025
Inspection — Pass-Final PL - Up to 3 Requested Floors
Pass
View inspection ↗
08/08/2025
Inspection — Fail-Final PL - Up to 3 Requested Floors
Fail
View inspection ↗
07/22/2025
Permit issued — Plumbing
M00769191-S2-PL
06/04/2025
Filed — Alteration
INSTALL NEW GAS METER TO ACCOMMDATE NEW DUAL BURNER FOR EX. OIL BOILER AND INSTALL NEW HOT WATER HEATER. NO EXISTING BUILDING MATERIAL TO BE DISTURBED UNDER THIS APPLICATION. NO CHANGE IN USE, EGRESS, BULK OR OCCUPANCY.
M00769191-P1
06/04/2025
Violation issued (HPD, open)
A
03/26/2025
Special inspection requirement — Tenant Protection Plan Compliance
03/26/2025
Special inspection requirement — Fire-Resistant Penetrations and Joints
Steven Williams
03/04/2025
Objection resolved — Addressed
02/18/2025
Objection raised — Admin
02/10/2025
Filed — Alteration
INSTALL NEW GAS METER TO ACCOMMDATE NEW DUAL BURNER FOR EX. OIL BOILER AND INSTALL NEW HOT WATER HEATER. NO EXISTING BUILDING MATERIAL TO BE DISTURBED UNDER THIS APPLICATION. NO CHANGE IN USE, EGRESS, BULK OR OCCUPANCY.
M00769191-S2
11/07/2024
Permit issued — General Construction
M00945871-I1-GC
10/09/2024
Filed — Alteration
INSTALL CHIMNEY LINER.
M00945871-I1
12/15/2023
Permit issued — Boiler Equipment
M00769191-S1-BE
11/15/2023
Violation issued (HPD, closed)
I
10/31/2023
Violation issued (FDNY_NOV, closed)
10/10/2023
Special inspection requirement — Tenant Protection Plan Compliance
LOUIS ARENA
10/10/2023
Special inspection requirement — Chimneys and vents
LOUIS ARENA
10/10/2023
Special inspection requirement — Final
LOUIS ARENA
08/22/2023
Permit issued — Plumbing
M00769191-I1-PL
08/22/2023
Objection resolved — Addressed
08/11/2023
Objection raised — Scope
08/10/2023
Filed — Alteration
INSTALL NEW GAS METER TO ACCOMMDATE NEW DUAL BURNER FOR EX. OIL BOILER AND INSTALL NEW HOT WATER HEATER. NO EXISTING BUILDING MATERIAL TO BE DISTURBED UNDER THIS APPLICATION. NO CHANGE IN USE, EGRESS, BULK OR OCCUPANCY.
M00769191-S1
03/22/2023
Special inspection requirement — Tenant Protection Plan Compliance
Steven Williams
03/22/2023
Special inspection requirement — Fire-Resistant Penetrations and Joints
Steven Williams
03/22/2023
Special inspection requirement — Heating Systems
Steven Williams
03/17/2023
Violation issued (HPD, closed)
C
03/15/2023
Violation issued (HPD, closed)
A
03/12/2023
Violation issued (HPD, closed)
C
11/02/2022
Violation issued (HPD, closed)
I
10/17/2022
Violation issued (FDNY_NOV, closed)
08/25/2022
Objection raised — Inspections
08/25/2022
Objection resolved — Addressed
08/25/2022
Objection raised — Zoning
08/25/2022
Objection resolved — Addressed
08/25/2022
Objection raised — Other
08/25/2022
Objection resolved — Addressed
08/25/2022
Objection raised — Inspections
08/25/2022
Objection resolved — Addressed
08/23/2022
Filed — Alteration
INSTALL NEW GAS METER TO ACCOMMDATE NEW DUAL BURNER FOR EX. OIL BOILER AND INSTALL NEW HOT WATER HEATER. NO EXISTING BUILDING MATERIAL TO BE DISTURBED UNDER THIS APPLICATION. NO CHANGE IN USE, EGRESS, BULK OR OCCUPANCY.
M00769191-I1
07/18/2022
Special inspection requirement — Fire-Resistant Penetrations and Joints
Steven Williams
02/15/2022
Violation issued (HPD, closed)
A
08/18/2021
Violation issued (HPD, closed)
A
04/01/2021
Violation issued (HPD, closed)
A
10/25/2019
Violation issued (HPD, closed)
I
Latest 60 of 78 events.
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWSupported ScaffoldPermit IssuedAndamio Scaffolding10/01/2026
DOB NOWSidewalk ShedPermit IssuedAndamio Scaffolding09/30/2026
DOB NOWBoiler EquipmentPermit IssuedDouglas Simmons10/03/2025
DOB NOWPlumbingPermit IssuedHepco Heating & Plumbing07/22/2025
DOB NOWGeneral ConstructionPermit IssuedAgeless Chimney11/07/2024
DOB NOWBoiler EquipmentPermit IssuedDouglas Simmons12/15/2023
DOB NOWPlumbingPermit IssuedHepco Heating & Plumbing08/22/2023
BISSPISSUEDIrwin Friedman & Sons03/02/2001
BISPLISSUEDSt Marks P & H Co03/02/2001
BISFBISSUEDPeter Agliaro MP08/11/2000
BISBLISSUEDC James Plumbing & Heating07/27/2000
BISEQISSUEDRockledge Scaffold06/27/2000
BISPLRE-ISSUEDSt Marks P & H Co06/19/2000
BISOTISSUEDErin Construction & Development06/15/2000
BISBLISSUEDNuway Fuel Oil Co11/21/1990
1 project · most recent 10/11/2025
Gas Water/Sanitary
FiledStatusContractorScope
10/11/2025Permit IssuedHepco Heating & PlumbingGas, Water/Sanitary
2 projects · most recent 09/22/2026
General Wiring
FiledStatusContractorScope
09/22/2026Permit IssuedBorowide Elect'l Contractors—
04/25/2022CompleteVilanova Electrical ContsGeneral Wiring
1 project · most recent 10/09/2024
FiledStatusContractorScope
10/09/2024Permit IssuedAgeless Chimney1 scope_items
2 projects · most recent 09/30/2026
Sidewalk Shed Scaffold
FiledStatusContractorScope
09/30/2026Permit IssuedAndamio ScaffoldingSidewalk Shed
09/30/2026Permit IssuedAndamio ScaffoldingScaffold
▾Field Inspections (DOB CAP) — 4
DateTypeResultReport
11/20/2025Pass-Final PL - Up to 3 Requested FloorsPassView ↗
09/23/2025Pass-Final PL - Up to 3 Requested FloorsPassView ↗
09/04/2025Pass-Final PL - Up to 3 Requested FloorsPassView ↗
08/08/2025Fail-Final PL - Up to 3 Requested FloorsFailView ↗
▾Special Inspection Requirements (DOB NOW) — 15
DateRequirementInspectorRole
09/18/2026Tenant Protection Plan ComplianceKAMRUL AHSANspecial
09/18/2026MasonryKAMRUL AHSANspecial
11/07/2025Tenant Protection Plan ComplianceSteven Williamsspecial
11/07/2025Fire-Resistant Penetrations and JointsSteven Williamsspecial
10/10/2025Fire-Resistant Penetrations and JointsSteven Williamsspecial
10/10/2025Tenant Protection Plan Compliance—special
03/26/2025Tenant Protection Plan Compliance—special
03/26/2025Fire-Resistant Penetrations and JointsSteven Williamsspecial
10/10/2023Tenant Protection Plan ComplianceLOUIS ARENAspecial
10/10/2023Chimneys and ventsLOUIS ARENAspecial
10/10/2023FinalLOUIS ARENAprogress
03/22/2023Tenant Protection Plan ComplianceSteven Williamsspecial
03/22/2023Fire-Resistant Penetrations and JointsSteven Williamsspecial
03/22/2023Heating SystemsSteven Williamsspecial
07/18/2022Fire-Resistant Penetrations and JointsSteven Williamsspecial
▾Documents — 32 on file (BIS + DOB NOW)
▸Plans & Drawings9
▸DOB NOWPlans/Sketch9
10/15/2026M01462118-I1Request digital key ↗
10/04/2026M01466850-I1Request digital key ↗
10/04/2026M01466847-I1Request digital key ↗
Showing 3 of 9 on file for this type
▸Seals & Professional Certifications22
▸DOB NOWSpecial Inspector Seal & Signature12
10/16/2026M01462118-I1Open ↗
10/16/2026M01462118-I1Open ↗
10/04/2026M00769191-I1Open ↗
Showing 3 of 12 on file for this type
▸DOB NOWDPL-1: Design Professional Seal & Signature9
10/15/2026M01462118-I1Open ↗
10/04/2026M01466847-I1Open ↗
10/02/2026M01466850-I1Open ↗
Showing 3 of 9 on file for this type
▸DOB NOWProgress Inspector Seal & Signature1
09/01/2026M00945871-I1Open ↗
▸Environmental & Asbestos1
▸DOB NOWDEP ACP-5: Asbestos Assessment Report1
08/26/2026M00945871-I1Open ↗