← Back
Over six families without stores
268 WEST 73 STREET
MANHATTAN · BIN 1030532
💬 Discuss this project
1888Year Built
5Stories
C1Building Class
R8BZoning
6,360 sfGross Floor Area
10Units
Rent Stabilized2 Open Violations ▸
Over six families without stores · Owner of record: USC 268 WEST 73 LLC · 1,800 sf lot · 3.53 FAR built · Flood zone X
Locations of Work
ArchitectureStructuralMechanicalPlumbing
Roof5p · 3 filings · 20 docs
Floor 41p · 1 filing · 19 docs
Floor 3
Floor 24p · 2 filings · 20 docs
Floor 1
Cellar4p · 3 filings · 20 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
URBAN STANDARD DEVELOPMENT1107/08/2026
USC 268 WEST 731103/22/2026
METHOD GENERAL CONTRACTOR103/22/2026
JAMES MCCULLAR ASSOCIATES103/22/2026
▾Sales History (ACRIS)
DatePriceUnitSeller → Buyer$/sf
09/29/2020$3.4M—Private party → USC 268 WEST 73 LLC$535/sf building
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
SHARON ENGINEERING, P.C611/30/2022
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
BMB BUILDING CONSULTING1203/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
METHOD GENERAL CONTRACTORGeneral Contractor407/08/2026
P.H. WORKS INCPlumbing207/08/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
SIA INSPECTIONS LLC7306811/30/2022
Building Lifecycle
All (90)Filed (6)Permit Issued (4)Signed Off (3)Violation (60)Special Inspection (17)
01/23/2025
Violation issued (HPD, closed)
C
01/23/2025
Violation issued (HPD, closed)
C
03/01/2024
Violation issued (HPD, closed)
C
03/01/2024
Violation issued (HPD, closed)
B
03/01/2024
Violation issued (HPD, closed)
C
03/01/2024
Violation issued (HPD, closed)
C
03/01/2024
Violation issued (HPD, closed)
C
03/01/2024
Violation issued (HPD, closed)
C
09/18/2023
Violation issued (HPD, closed)
C
09/18/2023
Violation issued (HPD, closed)
B
09/18/2023
Violation issued (HPD, closed)
A
09/18/2023
Violation issued (HPD, closed)
B
09/18/2023
Violation issued (HPD, closed)
C
09/18/2023
Violation issued (HPD, closed)
A
04/25/2023
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
04/07/2023
Violation issued (HPD, closed)
A
04/07/2023
Violation issued (HPD, closed)
A
04/07/2023
Violation issued (HPD, closed)
A
04/07/2023
Violation issued (HPD, closed)
A
03/28/2023
Signed off — Alteration
M00419433-I1
03/28/2023
Signed off — Alteration
PROPOSE MECHANICAL SCOPE OF WORK FILED IN CONJUNCTION WITH ALT 1 # 121208790
M00419269-I1
03/16/2023
Violation issued (HPD, closed)
A
03/14/2023
Permit issued — Structural
M00419433-I1-ST
03/12/2023
Violation issued (HPD, closed)
C
02/02/2023
Violation issued (HPD, closed)
A
02/02/2023
Violation issued (HPD, closed)
C
02/02/2023
Violation issued (HPD, open)
A
12/28/2022
Signed off — Alteration
PROPOSE TO INSTALL PLUMBING SCOPE OF WORK & CAP/REMOVE EXISTING BOILER FILED IN CONJUNCTION WITH ALT 1 # 121208790.
M00419450-I1
12/06/2022
Special inspection requirement — Fire-Resistant Penetrations and Joints
JEFF AKERMAN
12/05/2022
Special inspection requirement — HVAC and service water heating equipment
JEFF AKERMAN
12/05/2022
Special inspection requirement — HVAC and service water heating system controls
JEFF AKERMAN
12/05/2022
Special inspection requirement — HVAC insulation and sealing
JEFF AKERMAN
12/05/2022
Special inspection requirement — Shutoff dampers
JEFF AKERMAN
12/05/2022
Special inspection requirement — Maintenance information
JEFF AKERMAN
12/05/2022
Special inspection requirement — Fire-Resistant Penetrations and Joints
JEFF AKERMAN
12/05/2022
Special inspection requirement — Final
SOFIA KAPELYAN
12/05/2022
Special inspection requirement — Mechanical Systems
JEFF AKERMAN
11/30/2022
Filed — Alteration
PROPOSE TO INSTALL PLUMBING SCOPE OF WORK & CAP/REMOVE EXISTING BOILER FILED IN CONJUNCTION WITH ALT 1 # 121208790.
M00419450-P2
11/30/2022
Filed — Alteration
PROPOSE MECHANICAL SCOPE OF WORK FILED IN CONJUNCTION WITH ALT 1 # 121208790
M00419269-P1
07/30/2022
Filed — Alteration
PROPOSE TO INSTALL PLUMBING SCOPE OF WORK & CAP/REMOVE EXISTING BOILER FILED IN CONJUNCTION WITH ALT 1 # 121208790.
M00419450-P1
07/21/2022
Special inspection requirement — Fire-Resistant Penetrations and Joints
JEFF AKERMAN
06/16/2022
Violation issued (HPD, closed)
A
06/16/2022
Violation issued (HPD, closed)
C
06/16/2022
Violation issued (HPD, closed)
A
06/16/2022
Violation issued (HPD, closed)
C
06/16/2022
Violation issued (HPD, closed)
A
06/09/2022
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
05/26/2022
Violation issued (ECB, closed)
Unknown
05/25/2022
Violation issued (HPD, closed)
B
05/25/2022
Violation issued (HPD, closed)
C
05/25/2022
Violation issued (HPD, closed)
B
05/25/2022
Violation issued (HPD, closed)
B
05/25/2022
Violation issued (HPD, closed)
B
05/25/2022
Violation issued (HPD, closed)
B
05/25/2022
Violation issued (HPD, closed)
B
05/25/2022
Violation issued (HPD, closed)
B
05/25/2022
Violation issued (HPD, closed)
C
05/25/2022
Violation issued (HPD, closed)
B
05/25/2022
Violation issued (HPD, closed)
B
05/25/2022
Violation issued (HPD, closed)
B
Latest 60 of 90 events.
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWStructuralSigned-offMETHOD GENERAL CONTRACTOR03/14/2023
DOB NOWMechanical SystemsSigned-offMETHOD GENERAL CONTRACTOR02/25/2022
DOB NOWPlumbingSigned-offP.H. WORKS INC02/08/2022
DOB NOWPlumbingSigned-offP.H. WORKS INC02/10/2021
BIS—ISSUEDMETHOD GENERAL CONTRACTOR08/22/2022
BIS—ISSUEDMETHOD GENERAL CONTRACTOR08/16/2022
BIS—ISSUEDMETHOD GENERAL CONTRACTOR06/24/2022
BIS—ISSUEDMETHOD GENERAL CONTRACTOR03/08/2022
BIS—ISSUEDC AND E BUILDERS INC02/23/2021
BIS—ISSUEDC AND E BUILDERS INC02/04/2021
BISOTISSUEDJAMES MCULLAR ARCH05/28/1996
BISPLISSUEDVINRAY PLUMBING & HEATING, INC.12/28/1993
BISBLISSUEDVINRAY PLUMBING & HEATING, INC.12/28/1993
2 projects · most recent 01/25/2023
General Wiring
FiledStatusContractorScope
01/25/2023CompleteFOSTER ELEC'L SVC., INC.General Wiring
02/24/2021CompleteE G ELECTRIC INCGeneral Wiring
▾Special Inspection Requirements (DOB NOW) — 17
DateRequirementInspectorRole
12/06/2022Fire-Resistant Penetrations and JointsJEFF AKERMANspecial
12/05/2022HVAC and service water heating equipment JEFF AKERMANenergy_progress
12/05/2022HVAC and service water heating system controls JEFF AKERMANenergy_progress
12/05/2022HVAC insulation and sealing JEFF AKERMANenergy_progress
12/05/2022Shutoff dampersJEFF AKERMANenergy_progress
12/05/2022Maintenance informationJEFF AKERMANenergy_progress
12/05/2022Fire-Resistant Penetrations and JointsJEFF AKERMANspecial
12/05/2022FinalSOFIA KAPELYANprogress
12/05/2022Mechanical SystemsJEFF AKERMANspecial
07/21/2022Fire-Resistant Penetrations and JointsJEFF AKERMANspecial
04/28/2021Structural Steel - DetailsSOFIA KAPELYANspecial
10/27/2020Structural Steel - WeldingSOFIA KAPELYANspecial
10/27/2020Structural Steel - High Strength BoltingSOFIA KAPELYANspecial
10/27/2020Post-installed AnchorsSOFIA KAPELYANspecial
10/27/2020MasonrySOFIA KAPELYANspecial
10/27/2020Structural Stability – Alterations of existing buildingsSOFIA KAPELYANspecial
10/26/2020FinalSOFIA KAPELYANprogress
▾Documents — 146 on file (BIS + DOB NOW)
▸Plans & Drawings6
▸DOB NOWPlans/Sketch - Plumbing3
09/02/2026M00419450-P1Request digital key ↗
09/02/2026M00419450-P2Request digital key ↗
09/02/2026M00419450-I1Request digital key ↗
▸DOB NOWPlans/Sketch - Mechanical Systems2
09/03/2026M00419269-I1Request digital key ↗
09/03/2026M00419269-P1Request digital key ↗
▸DOB NOWPlans/Sketch - Structural1
09/04/2026M00419433-I1Request digital key ↗
▸Applications & Permits31
▸BISPLAN / WORK APPROVAL APPLICATION14
07/27/2023121208790Open ↗
07/26/2023121208790Open ↗
07/06/2023121208790Open ↗
Showing 3 of 14 on file for this type
▸BISWORK PERMIT APPLICATION7
08/23/2022121208790Open ↗
08/16/2022121208790Open ↗
08/15/2022121208790Open ↗
Showing 3 of 7 on file for this type
▸DOB NOWLPC Approval/Permit6
09/02/2026M00419450-P1Open ↗
09/02/2026M00419450-I1Open ↗
08/13/2026M00419450-P2Open ↗
Showing 3 of 6 on file for this type
▸BISLL104/19 REQUEST FOR EXECEPTION TO PERMIT RESTRICTION1
10/05/2023121208790Open ↗
▸BISPARTIAL DEMO PLAN & DS1 (FOR AL/EW-OT PERMITS)1
01/27/2021121208790Open ↗
▸BISCERTIFICATE OF OCCUPANCY: APPLICATION1
08/23/2022121208790Open ↗
▸BISPARTIAL DEMO: 10-DAY NOTICE (FOR AL/EW-OT PERMITS)1
01/27/2021121208790Open ↗
▸Zoning, Tax Lot & Property Records4
▸BISZONING EXHIBIT III:DESC. & OWNRSHP.STMNT1
12/29/2020121208790Open ↗
▸BISVERIFY TAX LOT1
01/13/2023121208790Open ↗
▸BISZONING DIAGRAM1
12/29/2020121208790Open ↗
▸BISZONING EXHIBIT I: CERTIFICATION1
12/29/2020121208790Open ↗
▸Seals & Professional Certifications25
▸DOB NOWSpecial Inspector Seal & Signature10
09/02/2026M00419450-P1Open ↗
09/01/2026M00419450-I1Open ↗
08/31/2026M00419433-I1Open ↗
Showing 3 of 10 on file for this type
▸DOB NOWProgress Inspector Seal & Signature7
08/31/2026M00419433-I1Open ↗
08/25/2026M00419269-I1Open ↗
08/25/2026M00419269-I1Open ↗
Showing 3 of 7 on file for this type
▸DOB NOWDPL-1: Design Professional Seal & Signature6
09/02/2026M00419450-I1Open ↗
09/02/2026M00419450-P1Open ↗
08/13/2026M00419269-I1Open ↗
Showing 3 of 6 on file for this type
▸BISTECHNICAL REPORT: RESPONSIBILITY/CERTIFICATION2
02/05/2021121208790Open ↗
02/05/2021121208790Open ↗
▸Trade Schedules & Equipment2
▸BISDETECTOR:SMOKE-CERT. OF INSTALLATION1
01/27/2023121208790Open ↗
▸BISDETECTOR:CARBON MONOXIDE-CERT.OF INSTALL1
01/27/2023121208790Open ↗
▸Safety & Tenant Protection8
▸DOB NOWTenant Protection Plan6
09/02/2026M00419450-I1Open ↗
09/02/2026M00419450-P1Open ↗
08/13/2026M00419269-P1Open ↗
Showing 3 of 6 on file for this type
▸BISSTREET TREE CHECKLIST1
12/29/2020121208790Open ↗
▸BISTenant Protection Plan and Notes1
12/29/2020121208790Open ↗
▸Environmental & Asbestos4
▸DOB NOWDEP ACP-20/ACP-21: Asbestos Project Conditional Completion Form/Asbestos Project Completion Form3
08/13/2026M00419450-I1Open ↗
08/13/2026M00419433-I1Open ↗
08/13/2026M00419269-I1Open ↗
▸BISDEP ASBESTOS PROJECT COMPLETION FORM1
02/05/2021121208790Open ↗
▸Energy Compliance14
▸BISFENESTRATION AREAS2
01/13/2023121208790Open ↗
01/13/2023121208790Open ↗
▸BISTECHNICAL REPORT: ENERGY CODE - RESPONSIBILITY2
04/26/2021121208790Open ↗
12/29/2020121208790Open ↗
▸BISFENESTRATION AIR LEAKAGE2
01/13/2023121208790Open ↗
01/13/2023121208790Open ↗
▸BISFENESTRATION U-FACTOR & PRODUCT RATING2
01/13/2023121208790Open ↗
01/13/2023121208790Open ↗
▸BISINSULATION PLACEMENT & R VALUES1
01/13/2023121208790Open ↗
▸BISLIGHTING IN DWELLING UNITS1
01/13/2023121208790Open ↗
▸BISENERGY CODE COMPLIANCE INSPECTIONS1
01/13/2023121208790Open ↗
▸BISAS-BUILT ENERGY ANALYSIS (EN2)1
01/13/2023121208790Open ↗
▸BISTECHNICAL REPORT: ENERGY CODE PROGRESS INSPS1
02/05/2021121208790Open ↗
▸DOB NOWEN2: As Built Energy Analysis.1
08/13/2026M00419269-I1Open ↗
▸Inspections & Test Reports5
▸BISTECHNICAL REPORT: RESPONSIBILITY2
02/01/2021121208790Open ↗
12/29/2020121208790Open ↗
▸BISSTRUCTURAL STABILITY - ALTERATIONS OF EXISTING BUILDINGS1
01/13/2023121208790Open ↗
▸BISFIRE-RESISTANT PENETRATIONS AND JOINTS (FIRESTOP)1
01/13/2023121208790Open ↗
▸BISFIRE-RESISTIVE RATED CONSTRUCTION1
01/13/2023121208790Open ↗
▸Approvals, Objections & Sign-offs21
▸BISLETTERS - SUPPORTING DOCUMENTATION10
07/28/2023121208790Open ↗
08/23/2022121208790Open ↗
08/17/2022121208790Open ↗
Showing 3 of 10 on file for this type
▸BISSCHEDULE A - OCCUPANCY / USE5
07/27/2023121208790Open ↗
07/26/2023121208790Open ↗
07/06/2023121208790Open ↗
Showing 3 of 5 on file for this type
▸BISLANDMARKS APPROVAL2
04/26/2021121208790Open ↗
12/11/2020121208790Open ↗
▸BISSUPERSEDING LETTER2
06/27/2022121208790Open ↗
03/09/2022121208790Open ↗
▸BISCONSTRUCTION (OT) SIGNOFF1
08/24/2023121208790Open ↗
▸BISLANDMARKS SIGNOFF1
01/30/2023121208790Open ↗
▸Cost, Insurance & Ownership2
▸BISCOST AFFIDAVIT (FINAL): PW31
01/13/2023121208790Open ↗
▸BISCOST AFFIDAVIT1
12/29/2020121208790Open ↗
▸Filing & Intake Forms23
▸BISADDITIONAL INFORMATION15
10/05/2023121208790Open ↗
07/28/2023121208790Open ↗
07/28/2023121208790Open ↗
Showing 3 of 15 on file for this type
▸BISBOROUGH INTAKE FORM7
08/23/2022121208790Open ↗
08/17/2022121208790Open ↗
08/15/2022121208790Open ↗
Showing 3 of 7 on file for this type
▸BISEFILING COVER SHEET1
10/14/2020121208790Open ↗
▸Other Documents1
▸BISPLOT DIAGRAM1
12/29/2020121208790Open ↗