← Back
Two family frame
2681 BAINBRIDGE AVENUE
BRONX · Bedford Park · BIN 2016855
💬 Discuss this project
1915Year Built
2.5Stories
B2Building Class
R5BZoning
2,640 sfGross Floor Area
2Units
Rent Stabilized8 Open Violations 7 unresolved · 1 paperwork only ▸
Two family frame · 2,092 sf lot · 1.26 FAR built · Flood zone X
Locations of Work
ArchitectureMechanicalPlumbing
Cellar2p · 3 filings · 14 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
AJRIN CONSTRUCTION1507/08/2026
▾Sales History (ACRIS)
DatePriceUnitSeller → Buyer$/sf
06/09/2020$800K—GCI CAPITAL LLC → Private party$303/sf building
05/22/2019$225K—Private party → GCI CAPITAL LLC$85/sf building
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
ASHRAF CORP406/19/2023
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
SHEIKH EXPEDITING803/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
AJRIN CONSTRUCTION INCGeneral Contractor707/08/2026
JOHNNY'S P&H CONTRAC INCPlumbing107/08/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
BANGASH ASSOCIATES INC8488306/19/2023
Building Lifecycle
All (56)Filed (4)Permit Issued (4)Signed Off (2)Violation (36)Inspection (5)Objection (5)
11/24/2025
Violation issued (HPD, open)
I
12/03/2024
Violation issued (HPD, open)
I
11/27/2023
Violation issued (HPD, open)
I
11/20/2023
Signed off — Alteration
APPLICATION FILE TO REMOVE NON-BEARING PARTITIONS AND FINISHING WORK AT CELLAR FLOOR AS PER PLAN. REMOVE VIOLATION#39053332Z PRIOR TO LEGAL CONDITIONS. PLUMBING WORK UNDER SEPARATE APPLICATION. NO CHANGE IN USE, EGRESS OR OCCUPANCY UNDER THIS APPLICATION
X00659409-I1
08/24/2023
Signed off — Alteration
APPLICATION FILE TO REMOVE & REPLACE 03 PCS BATHROOM, REMOVE OIL BOILER AND INSTALL TWO GAS BOILER AND ONE HWH, INSTALL 2 GAS METERS AS PER PLAN. NO CHANGE IN USE, EGRSS OR OCCUPANCY UNDER THIS APPLICATION. Boiler/HW under separate filing JOB#X00672891-I1
X00659411-I1
06/19/2023
Filed — Alteration
APPLICATION FILE TO REMOVE & REPLACE 03 PCS BATHROOM, REMOVE OIL BOILER AND INSTALL TWO GAS BOILER AND ONE HWH, INSTALL 2 GAS METERS AS PER PLAN. NO CHANGE IN USE, EGRSS OR OCCUPANCY UNDER THIS APPLICATION. Boiler/HW under separate filing JOB#X00672891-I1
X00659411-P1
06/05/2023
Inspection — Pass-Final PL - Up to 3 Requested Floors
Pass
View inspection ↗
06/01/2023
Inspection — Pass-Final PL - Up to 3 Requested Floors
Pass
View inspection ↗
05/30/2023
Permit issued — General Construction
X00659409-I1-GC
04/07/2023
Permit issued — General Construction
X00659409-I1-GC
02/03/2023
Inspection — Certified Gas-Gas-Piping-Roughing
Certified
View inspection ↗
02/03/2023
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Roughing
Certified
View inspection ↗
02/03/2023
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Underground
Certified
View inspection ↗
11/16/2022
Violation issued (HPD, open)
I
10/11/2022
Permit issued — Plumbing
X00659411-I1-PL
10/03/2022
Permit issued — General Construction
X00659409-I1-GC
05/17/2022
Objection raised — Admin
05/11/2022
Filed — Alteration
APPLICATION FILE TO INSTALL DUCT FOR NEW BOILER & HWH TO CONNECT EXIST. CHIMNEY AS PER PLAN. NO CHANGE IN USE, EGRESS OR OCCUPANCY UNDER THIS APPLICATION.
X00672891-I1
03/11/2022
Violation issued (ECB, closed)
Construction
02/02/2022
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
01/31/2022
Objection raised — Inspections
01/31/2022
Objection resolved — Addressed
01/24/2022
Filed — Alteration
APPLICATION FILE TO REMOVE NON-BEARING PARTITIONS AND FINISHING WORK AT CELLAR FLOOR AS PER PLAN. REMOVE VIOLATION#39053332Z PRIOR TO LEGAL CONDITIONS. PLUMBING WORK UNDER SEPARATE APPLICATION. NO CHANGE IN USE, EGRESS OR OCCUPANCY UNDER THIS APPLICATION
X00659409-I1
01/24/2022
Objection raised — Scope
01/24/2022
Objection resolved — Addressed
01/23/2022
Filed — Alteration
APPLICATION FILE TO REMOVE & REPLACE 03 PCS BATHROOM, REMOVE OIL BOILER AND INSTALL TWO GAS BOILER AND ONE HWH, INSTALL 2 GAS METERS AS PER PLAN. NO CHANGE IN USE, EGRSS OR OCCUPANCY UNDER THIS APPLICATION. Boiler/HW under separate filing JOB#X00672891-I1
X00659411-I1
12/23/2021
Violation issued (ECB, closed)
Construction
12/23/2021
Violation issued (ECB, closed)
Construction
11/09/2021
Violation issued (ECB, closed)
Construction
07/19/2021
Violation issued (HPD, open)
I
07/09/2021
Violation issued (HPD, closed)
B
07/09/2021
Violation issued (HPD, open)
B
07/09/2021
Violation issued (HPD, open)
B
04/21/2021
Violation issued (HPD, closed)
I
07/16/2009
Violation issued (HPD, closed)
B
07/16/2009
Violation issued (HPD, closed)
B
07/16/2009
Violation issued (HPD, closed)
B
07/16/2009
Violation issued (HPD, closed)
B
07/08/2009
Violation issued (HPD, closed)
B
07/08/2009
Violation issued (HPD, closed)
B
07/08/2009
Violation issued (HPD, closed)
B
07/08/2009
Violation issued (HPD, closed)
C
07/08/2009
Violation issued (HPD, closed)
B
07/08/2009
Violation issued (HPD, closed)
A
05/05/2009
Violation issued (HPD, closed)
B
05/05/2009
Violation issued (HPD, closed)
B
03/17/2009
Violation issued (HPD, closed)
B
03/17/2009
Violation issued (HPD, closed)
B
02/28/2009
Violation issued (HPD, closed)
B
02/28/2009
Violation issued (HPD, closed)
B
02/02/2009
Violation issued (ECB, open)
Construction
12/23/2008
Violation issued (HPD, closed)
B
10/30/2008
Violation issued (HPD, closed)
I
10/29/2008
Violation issued (HPD, closed)
B
10/21/2008
Violation issued (HPD, closed)
B
10/21/2008
Violation issued (HPD, closed)
B
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWGeneral ConstructionSigned-offAJRIN CONSTRUCTION INC05/30/2023
DOB NOWGeneral ConstructionSigned-offAJRIN CONSTRUCTION INC04/07/2023
DOB NOWPlumbingSigned-offJOHNNY NANHU10/11/2022
DOB NOWGeneral ConstructionSigned-offAJRIN CONSTRUCTION INC10/03/2022
1 project · most recent 05/11/2022
Ventilation Systems
FiledStatusContractorScopeMake / Model / Capacity
05/11/2022——Ventilation Systems
Ventilation
__Junk__ N/A 4,800 CFM · Exhaust Fan ×1
▾Field Inspections (DOB CAP) — 5
DateTypeResultReport
06/05/2023Pass-Final PL - Up to 3 Requested FloorsPassView ↗
06/01/2023Pass-Final PL - Up to 3 Requested FloorsPassView ↗
02/03/2023Certified Gas-Gas-Piping-RoughingCertifiedView ↗
02/03/2023Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
02/03/2023Certified Water and Sanitary-WS-Sanitary Piping-UndergroundCertifiedView ↗
▾Documents — 12 on file (BIS + DOB NOW)
▸Plans & Drawings3
▸DOB NOWPlans/Sketch3
08/24/2026X00659411-P1Request digital key ↗
08/15/2026X00659409-I1Request digital key ↗
08/14/2026X00659411-I1Request digital key ↗
▸Zoning, Tax Lot & Property Records3
▸DOB NOWRestrictive Declaration/Easement 13
08/13/2026X00659411-I1Open ↗
08/13/2026X00659411-P1Open ↗
08/13/2026X00659409-I1Open ↗
▸Seals & Professional Certifications3
▸DOB NOWDPL-1: Design Professional Seal & Signature3
08/24/2026X00659411-I1Open ↗
08/24/2026X00659411-P1Open ↗
08/24/2026X00659409-I1Open ↗
▸Environmental & Asbestos3
▸DOB NOWDEP ACP-5: Asbestos Assessment Report3
08/24/2026X00659411-P1Open ↗
08/15/2026X00659409-I1Open ↗
08/14/2026X00659411-I1Open ↗