← Back
Miscellaneous one family
2682 FORD STREET
BROOKLYN · BIN 3205648
💬 Discuss this project
1960Year Built
2Stories
A9Building Class
R3-2Zoning
1,863 sfGross Floor Area
1Units
1 Open Violation 0 unresolved · 1 paperwork only ▸FDNY Report ↗
Miscellaneous one family · 1,755 sf lot · 1.06 FAR built · Flood zone AE
Locations of Work
No floor-level scope or drawing coverage on file for this building.
1 job · most recent 03/30/2024
FiledStatusContractorScope
03/30/2024CompleteJSP ELECTL CNTNG CORP—
Building Lifecycle
All (17)Filed (2)Permit Issued (1)Signed Off (1)Violation (1)Special Inspection (12)
06/03/2024
Signed off — Alteration
INSTALLATION OF SOLAR PV SYSTEM ON THE EXISITNG ROOFTOP. NO CHANGES TO THE EGRESS, USE OR OCCUPANCY.
B00996348-I1
05/29/2024
Filed — Alteration
INSTALLATION OF SOLAR PV SYSTEM ON THE EXISITNG ROOFTOP. NO CHANGES TO THE EGRESS, USE OR OCCUPANCY.
B00996348-P1
05/29/2024
Special inspection requirement — Air barrier - visual inspection
VYACHESLAV NECHAYEV
05/29/2024
Special inspection requirement — Fire-Resistant Penetrations and Joints
VYACHESLAV NECHAYEV
05/29/2024
Special inspection requirement — Flood Zone Compliance (attach FEMA elevation/dry floodproofing certificate where applicable)
VYACHESLAV NECHAYEV
05/29/2024
Special inspection requirement — Structural Stability – Alterations of existing buildings
VYACHESLAV NECHAYEV
05/29/2024
Special inspection requirement — Energy Code Compliance Inspections
VYACHESLAV NECHAYEV
05/29/2024
Special inspection requirement — Final
VYACHESLAV NECHAYEV
05/28/2024
Special inspection requirement — Fire-Resistant Penetrations and Joints
VYACHESLAV NECHAYEV
05/28/2024
Special inspection requirement — Flood Zone Compliance (attach FEMA elevation/dry floodproofing certificate where applicable)
VYACHESLAV NECHAYEV
05/28/2024
Special inspection requirement — Structural Stability – Alterations of existing buildings
VYACHESLAV NECHAYEV
05/28/2024
Special inspection requirement — Energy Code Compliance Inspections
VYACHESLAV NECHAYEV
05/28/2024
Special inspection requirement — Final
VYACHESLAV NECHAYEV
05/28/2024
Special inspection requirement — Air barrier - visual inspection
VYACHESLAV NECHAYEV
03/14/2024
Permit issued — Solar
B00996348-I1-SL
02/06/2024
Filed — Alteration
INSTALLATION OF SOLAR PV SYSTEM ON THE EXISITNG ROOFTOP. NO CHANGES TO THE EGRESS, USE OR OCCUPANCY.
B00996348-I1
04/13/2002
Violation issued (ECB, open)
Construction
▾Sales History (ACRIS)
DatePriceUnitSeller → Buyer$/sf
01/15/2014$550K—— → —$295/sf building
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
ETRECTE LLC205/29/2024
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
JSP ELECTL CNTNG CORPElectrical103/22/2026
J.B.I. CONSTRUCTION GROUPGeneral Contractor107/08/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
ETRECTE LLC8116205/29/2024
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWSolarSigned-offJ.B.I. CONSTRUCTION GROUP03/14/2024
▾Special Inspection Requirements (DOB NOW) — 12
DateRequirementInspectorRole
05/29/2024Air barrier - visual inspectionVYACHESLAV NECHAYEVenergy_progress
05/29/2024Fire-Resistant Penetrations and JointsVYACHESLAV NECHAYEVspecial
05/29/2024Flood Zone Compliance (attach FEMA elevation/dry floodproofing certificate where applicable)VYACHESLAV NECHAYEVspecial
05/29/2024Structural Stability – Alterations of existing buildingsVYACHESLAV NECHAYEVspecial
05/29/2024Energy Code Compliance InspectionsVYACHESLAV NECHAYEVprogress
05/29/2024FinalVYACHESLAV NECHAYEVprogress
05/28/2024Fire-Resistant Penetrations and JointsVYACHESLAV NECHAYEVspecial
05/28/2024Flood Zone Compliance (attach FEMA elevation/dry floodproofing certificate where applicable)VYACHESLAV NECHAYEVspecial
05/28/2024Structural Stability – Alterations of existing buildingsVYACHESLAV NECHAYEVspecial
05/28/2024Energy Code Compliance InspectionsVYACHESLAV NECHAYEVprogress
05/28/2024FinalVYACHESLAV NECHAYEVprogress
05/28/2024Air barrier - visual inspectionVYACHESLAV NECHAYEVenergy_progress
▾Documents — 15 on file (BIS + DOB NOW)
▸Plans & Drawings2
▸DOB NOWPlans/Sketch2
08/25/2026B00996348-I1Request digital key ↗
08/25/2026B00996348-P1Request digital key ↗
▸Seals & Professional Certifications10
▸DOB NOWProgress Inspector Seal & Signature4
09/02/2026B00996348-I1Open ↗
09/02/2026B00996348-I1Open ↗
08/28/2026B00996348-P1Open ↗
Showing 3 of 4 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature4
09/02/2026B00996348-I1Open ↗
09/02/2026B00996348-I1Open ↗
08/28/2026B00996348-P1Open ↗
Showing 3 of 4 on file for this type
▸DOB NOWDPL-1: Design Professional Seal & Signature2
08/25/2026B00996348-I1Open ↗
08/25/2026B00996348-P1Open ↗
▸Environmental & Asbestos2
▸DOB NOWDEP ACP-5: Asbestos Assessment Report2
08/25/2026B00996348-I1Open ↗
08/25/2026B00996348-P1Open ↗
▸Approvals, Objections & Sign-offs1
▸DOB NOWUtility Company Final Acceptance Letter1
08/13/2026B00996348-I1Open ↗