Two family converted from one family
2683 CRESTON AVENUE
BRONX · BIN 2017482
💬 Discuss this project
1910Year Built
2.75Stories
B3Building Class
R8Zoning
2,728 sfGross Floor Area
2Units
98 Open Violations ▸
Two family converted from one family · Owner of record: 2683 CRESTON LLC · 2,500 sf lot · 1.09 FAR built · Flood zone X
Locations of Work
ArchitectureStructuralMechanicalPlumbingFire Protection
Permit Issued — active, not yet Signed-off
RoofUnder Construction23p · 2 filings · 20 docs
Floor 6Under Construction23p · 1 filing · 20 docs
Floor 5Under Construction21p · 1 filing · 20 docs
Floor 4Under Construction21p · 1 filing · 20 docs
Floor 3Under Construction21p · 1 filing · 20 docs
Floor 2Under Construction15p · 2 filings · 20 docs
Floor 1Under Construction19p · 2 filings · 20 docs
1 job · most recent 10/02/2025
Heating and Air Conditioning Systems Ventilation Systems
FiledStatusContractorScopeMake / Model / Capacity
10/02/2025Signed-offFRD CONSTRUCTION LLCHeating and Air Conditioning Systems, Ventilation Systems
Heat / Cool
General Electric AZ65H09DAB 8,100 BTU · Ptac ×22
Ventilation
Panasonic FV-0511VKS2 50 BTU · Exhaust Fan ×22
Summit ADAH1624W 100 CFM · Kitchen Exhaust ×22
1 job · most recent 10/02/2025
Sprinkler System
FiledStatusContractorScope
10/02/2025Permit IssuedGO PRO FIRE PROTECTION CSprinkler System
3 jobs · most recent 08/25/2026
General Wiring
FiledStatusContractorScope
08/25/2026Pending Payment VerificationJAM ELECTRICAL CORPGeneral Wiring
07/26/2026Permit IssuedFUSED ELECTRIC CONTNG CORGeneral Wiring
07/03/2025Permit IssuedSOLAS ELECTRICAL CORP—
2 jobs · most recent 11/11/2025
Sidewalk Shed Fence
FiledStatusContractorScope
11/11/2025Permit IssuedCONSOLIDATED SCAFFOLDINGSidewalk Shed
02/06/2025Signed-offPRECISE CONSTRUCTION CONRFence
Building Lifecycle
All (124)Filed (11)Permit Issued (12)Signed Off (4)Violation (60)Inspection (4)Special Inspection (30)Tax Incentive (3)
08/27/2026
Signed off — Alteration
PROPOSED 8FT CONSTRUCTION FENCE. NO CHANGE TO USE, EGRESS OR OCCUPANCY UNDER THIS APPLICATION.
X01174273-I1
05/05/2026
Violation issued (ECB, closed)
Construction
05/05/2026
Violation issued (ECB, closed)
Cranes and Derricks
04/16/2026
Violation issued (ECB, closed)
Construction
04/16/2026
Violation issued (ECB, closed)
Cranes and Derricks
04/06/2026
Signed off — New Building
Sprinkler work in conjunction with NB application #X01157822-I1.
X01157822-S3
04/01/2026
485-x construction completed
03/06/2026
Inspection — Certified Storm Drainage-ST-Piping-Roughing
Certified
View inspection ↗
03/06/2026
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Roughing
Certified
View inspection ↗
02/13/2026
Permit issued — Mechanical Systems
X01157822-S4-MS
02/13/2026
Permit issued — General Construction
X01157822-I1-GC
02/13/2026
Permit issued — Structural
X01157822-S3-ST
01/29/2026
Permit issued — Mechanical Systems
X01157822-S4-MS
01/23/2026
Inspection — Certified Storm Drainage-ST-Piping-Underground
Certified
View inspection ↗
01/23/2026
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Underground
Certified
View inspection ↗
01/13/2026
Signed off — New Building
Sprinkler work in conjunction with NB application #X01157822-I1.
X01157822-S8
12/30/2025
485-x registration filed
12/22/2025
Permit issued — Sprinklers
X01157822-S6-EW-SP
12/22/2025
Permit issued — Plumbing
X01157822-S5-PL
11/11/2025
Filed — Alteration
INSTALLATION OF A HEAVY DUTY SIDEWALK SHED AS PER PLANS DURING GENERAL CONSTRUCTION WORK. NO CHANGE IN USE, EGRESS OR OCCUPANCY. SIDEWALK SHED TO COMPLY WITH CHAPTER 33 OF NYC BUILDING CODE OF 2022.
X01250131-P1
11/03/2025
Permit issued — Structural
X01157822-S3-ST
10/30/2025
Permit issued — General Construction
X01157822-I1-GC
10/06/2025
Special inspection requirement — Fire-Resistant Penetrations and Joints
MICHAEL KARANTINIDIS, P.E.
10/06/2025
Special inspection requirement — Maintenance information
MICHAEL KARANTINIDIS, P.E.
10/06/2025
Special inspection requirement — HVAC-R and service water piping design and insulation
MICHAEL KARANTINIDIS, P.E.
10/06/2025
Special inspection requirement — HVAC-R and service water heating system controls
MICHAEL KARANTINIDIS, P.E.
10/06/2025
Special inspection requirement — HVAC-R and service water heating equipment
MICHAEL KARANTINIDIS, P.E.
10/02/2025
Filed — New Building
Sprinkler work in conjunction with NB application #X01157822-I1.
X01157822-P1
10/01/2025
Special inspection requirement — Fire-Resistant Penetrations and Joints
10/01/2025
Special inspection requirement — HVAC-R and service water heating equipment
10/01/2025
Special inspection requirement — HVAC-R and service water piping design and insulation
10/01/2025
Special inspection requirement — HVAC-R and service water heating system controls
10/01/2025
Special inspection requirement — Maintenance information
09/18/2025
Permit issued — Foundation
X01157822-S8-FO-EA
09/18/2025
485-x construction commenced
09/12/2025
Signed off — Full Demolition
X01153629-I1
08/29/2025
Filed — New Building
Sprinkler work in conjunction with NB application #X01157822-I1.
X01157822-S8
08/28/2025
Special inspection requirement — Subgrade Inspections
MICHAEL KARANTINIDIS, P.E.
08/28/2025
Special inspection requirement — Footing and Foundation
MICHAEL KARANTINIDIS, P.E.
08/28/2025
Special inspection requirement — Final
MICHAEL KARANTINIDIS, P.E.
08/28/2025
Special inspection requirement — Subsurface Investigations (Borings/Test Pits)
Bin Li
08/28/2025
Special inspection requirement — Subsurface Conditions – Fill Placement & In-Place Density
MICHAEL KARANTINIDIS, P.E.
08/28/2025
Special inspection requirement — Concrete - Cast-In-Place
MICHAEL KARANTINIDIS, P.E.
08/15/2025
Filed — New Building
Sprinkler work in conjunction with NB application #X01157822-I1.
X01157822-S3
07/25/2025
Filed — New Building
Sprinkler work in conjunction with NB application #X01157822-I1.
X01157822-S6
07/25/2025
Filed — New Building
Sprinkler work in conjunction with NB application #X01157822-I1.
X01157822-S5
07/25/2025
Filed — New Building
Sprinkler work in conjunction with NB application #X01157822-I1.
X01157822-S4
07/25/2025
Special inspection requirement — HVAC-R and service water heating equipment
MICHAEL KARANTINIDIS, P.E.
07/25/2025
Special inspection requirement — Duct leakage testing, insulation and design
MICHAEL KARANTINIDIS, P.E.
07/25/2025
Special inspection requirement — Maintenance information
MICHAEL KARANTINIDIS, P.E.
07/25/2025
Special inspection requirement — HVAC-R and service water piping design and insulation
MICHAEL KARANTINIDIS, P.E.
07/25/2025
Special inspection requirement — HVAC-R and service water heating system controls
MICHAEL KARANTINIDIS, P.E.
07/25/2025
Special inspection requirement — Shutoff dampers
MICHAEL KARANTINIDIS, P.E.
07/25/2025
Special inspection requirement — Fire-Resistant Penetrations and Joints
MICHAEL KARANTINIDIS, P.E.
07/23/2025
Permit issued — Full Demolition
X01153629-I1-FD
07/22/2025
Permit issued — Construction Fence
X01174273-I1-FN
07/02/2025
Filed — Alteration
INSTALLATION OF A HEAVY DUTY SIDEWALK SHED AS PER PLANS DURING GENERAL CONSTRUCTION WORK. NO CHANGE IN USE, EGRESS OR OCCUPANCY. SIDEWALK SHED TO COMPLY WITH CHAPTER 33 OF NYC BUILDING CODE OF 2022.
X01250131-I1
07/02/2025
Permit issued — Sidewalk Shed
X01250131-I1-SH
02/06/2025
Filed — Alteration
PROPOSED 8FT CONSTRUCTION FENCE. NO CHANGE TO USE, EGRESS OR OCCUPANCY UNDER THIS APPLICATION.
X01174273-I1
01/14/2025
Filed — New Building
Sprinkler work in conjunction with NB application #X01157822-I1.
X01157822-I1
Latest 60 of 124 events.
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
2683 CRESTON2807/08/2026
NEW LEAF DEVELOPMENT LLC407/08/2026
▾Sales History (ACRIS)
DatePriceUnitSeller → Buyer$/sf
11/21/2024$975K—Private party → 2683 CRESTON LLC$357/sf building
04/30/2018$610K—— → —$224/sf building
01/27/2017$200K—Private party → PBC SUNSHINE LLC$73/sf building
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
PAUL G. JONES, P.E.211/11/2025
GRID DRAFTING AND CONSULTING LLC710/02/2025
ADROIT ENGINEERING PLLC202/06/2025
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
GRID DRAFTING AND CONSULTING LLC1403/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
FRD CONSTRUCTION LLCGeneral Contractor607/08/2026
PRECISE CONSTRUCTION CONRGeneral Contractor307/08/2026
GO PRO FIRE PROTECTION CFire Protection107/08/2026
CONSOLIDATED SCAFFOLDINGGeneral Contractor104/09/2026
INFINITI ESC PLUMBING CORPlumbing107/08/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
INTERNATIONAL GEOTEHCNICA1795608/29/2025
ADROIT ENGINEERING PLLC8885101/08/2025
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWMechanical SystemsPermit IssuedFRD CONSTRUCTION02/13/2026
DOB NOWGeneral ConstructionPermit IssuedFRD CONSTRUCTION02/13/2026
DOB NOWStructuralSigned-offFRD CONSTRUCTION02/13/2026
DOB NOWMechanical SystemsPermit IssuedFRD CONSTRUCTION01/29/2026
DOB NOWSprinklersPermit IssuedGO PRO FIRE PROTECTION C12/22/2025
DOB NOWPlumbingSigned-offINFINITI ESC PLUMBING COR12/22/2025
DOB NOWStructuralSigned-offFRD CONSTRUCTION11/03/2025
DOB NOWGeneral ConstructionPermit IssuedFRD CONSTRUCTION10/30/2025
DOB NOWFoundationSigned-offPRECISE CONSTRUCTION CONR09/18/2025
DOB NOWFull DemolitionSigned-offPRECISE CONSTRUCTION CONR07/23/2025
DOB NOWConstruction FenceSigned-offPRECISE CONSTRUCTION CONR07/22/2025
DOB NOWSidewalk ShedPermit IssuedCONSOLIDATED SCAFFOLDING07/02/2025
▾Field Inspections (DOB CAP) — 4
DateTypeResultReport
03/06/2026Certified Storm Drainage-ST-Piping-RoughingCertifiedView ↗
03/06/2026Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
01/23/2026Certified Storm Drainage-ST-Piping-UndergroundCertifiedView ↗
01/23/2026Certified Water and Sanitary-WS-Sanitary Piping-UndergroundCertifiedView ↗
▾Special Inspection Requirements (DOB NOW) — 42
DateRequirementInspectorRole
10/06/2025Fire-Resistant Penetrations and JointsMICHAEL KARANTINIDIS, P.E.special
10/06/2025Maintenance informationMICHAEL KARANTINIDIS, P.E.energy_progress
10/06/2025HVAC-R and service water piping design and insulationMICHAEL KARANTINIDIS, P.E.energy_progress
10/06/2025HVAC-R and service water heating system controlsMICHAEL KARANTINIDIS, P.E.energy_progress
10/06/2025HVAC-R and service water heating equipmentMICHAEL KARANTINIDIS, P.E.energy_progress
10/01/2025Fire-Resistant Penetrations and Joints—special
10/01/2025HVAC-R and service water heating equipment—energy_progress
10/01/2025HVAC-R and service water piping design and insulation—energy_progress
10/01/2025HVAC-R and service water heating system controls—energy_progress
10/01/2025Maintenance information—energy_progress
08/28/2025Subgrade InspectionsMICHAEL KARANTINIDIS, P.E.special
08/28/2025Footing and FoundationMICHAEL KARANTINIDIS, P.E.progress
08/28/2025FinalMICHAEL KARANTINIDIS, P.E.progress
08/28/2025Subsurface Investigations (Borings/Test Pits)Bin Lispecial
08/28/2025Subsurface Conditions – Fill Placement & In-Place DensityMICHAEL KARANTINIDIS, P.E.special
08/28/2025Concrete - Cast-In-PlaceMICHAEL KARANTINIDIS, P.E.special
07/25/2025HVAC-R and service water heating equipmentMICHAEL KARANTINIDIS, P.E.energy_progress
07/25/2025Duct leakage testing, insulation and designMICHAEL KARANTINIDIS, P.E.energy_progress
07/25/2025Maintenance informationMICHAEL KARANTINIDIS, P.E.energy_progress
07/25/2025HVAC-R and service water piping design and insulationMICHAEL KARANTINIDIS, P.E.energy_progress
07/25/2025HVAC-R and service water heating system controlsMICHAEL KARANTINIDIS, P.E.energy_progress
07/25/2025Shutoff dampersMICHAEL KARANTINIDIS, P.E.energy_progress
07/25/2025Fire-Resistant Penetrations and JointsMICHAEL KARANTINIDIS, P.E.special
01/08/2025Fire-Resistance Rated ConstructionMICHAEL KARANTINIDIS, P.E.progress
01/08/2025Insulation placement and R valuesMICHAEL KARANTINIDIS, P.E.energy_progress
Latest 25 of 42.
▾Documents — 92 on file (BIS + DOB NOW)
▸Plans & Drawings11
▸DOB NOWPlans/Sketch11
08/20/2026X01153629-I1Request digital key ↗
08/20/2026X01174273-I1Request digital key ↗
08/18/2026X01157822-S8Request digital key ↗
Showing 3 of 11 on file for this type
▸Applications & Permits3
▸BISBPP-5 - Authorization to the Department of Transportation2
07/28/2025240362120Open ↗
06/03/2025240362120Open ↗
▸BISPLAN / WORK APPROVAL APPLICATION1
06/03/2025240362120Open ↗
▸Zoning, Tax Lot & Property Records3
▸DOB NOWZD1: DOB Zoning Diagram1
08/13/2026X01157822-I1Open ↗
▸DOB NOWHouse Number Verification: TOPO Stamp1
08/13/2026X01157822-I1Open ↗
▸DOB NOWZoning Exhibit form (1-5)1
08/13/2026X01157822-I1Open ↗
▸Seals & Professional Certifications50
▸DOB NOWProgress Inspector Seal & Signature27
08/27/2026X01157822-S5Open ↗
08/27/2026X01157822-S5Open ↗
08/27/2026X01157822-S5Open ↗
Showing 3 of 27 on file for this type
▸DOB NOWDPL-1: Design Professional Seal & Signature11
08/20/2026X01153629-I1Open ↗
08/20/2026X01174273-I1Open ↗
08/18/2026X01157822-S6Open ↗
Showing 3 of 11 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature10
08/27/2026X01157822-S5Open ↗
08/25/2026X01157822-I1Open ↗
08/25/2026X01157822-I1Open ↗
Showing 3 of 10 on file for this type
▸BISAPPLICANT OWNER SIGNATURE1
06/03/2025240362120Open ↗
▸BISTECHNICAL REPORT STATEMENT OF RESPONSIBILITY1
06/03/2025240362120Open ↗
▸Trade Schedules & Equipment5
▸DOB NOWDEP: Sewer Certification (Sanitary/Storm)1
08/13/2026X01157822-I1Open ↗
▸DOB NOWSewer Cut-Off1
08/13/2026X01153629-I1Open ↗
▸DOB NOWElectric Cut-Off1
08/13/2026X01153629-I1Open ↗
▸DOB NOWGas Cut-Off1
08/13/2026X01153629-I1Open ↗
▸DOB NOWWater Cut-Off1
08/13/2026X01153629-I1Open ↗
▸Safety & Tenant Protection5
▸BISSTREET TREES: RECEIPT OF STREET TREES SITE PLAN1
07/28/2025240362120Open ↗
▸BISBPP: STREET TREES SITE PLAN1
07/28/2025240362120Open ↗
▸BISSTREET TREE CHECKLIST1
06/03/2025240362120Open ↗
▸DOB NOWParks Department Acknowledgment Letter for Street Trees Plan1
08/13/2026X01157822-I1Open ↗
▸DOB NOWStreet Tree Checklist1
08/18/2026X01157822-I1Open ↗
▸Environmental & Asbestos2
▸DOB NOWDEP ACP-5: Asbestos Assessment Report1
08/20/2026X01153629-I1Open ↗
▸DOB NOWRodent Control1
08/13/2026X01153629-I1Open ↗
▸Inspections & Test Reports2
▸DOB NOWTR4 Test Report and Plot Diagram1
08/13/2026X01157822-S8Open ↗
▸DOB NOWSOIL REPORT1
08/13/2026X01157822-S8Open ↗
▸Approvals, Objections & Sign-offs1
▸BISLETTERS - SUPPORTING DOCUMENTATION1
06/03/2025240362120Open ↗
▸Filing & Intake Forms2
▸BISEFILING JOB APPLICATION COVER SHEET1
06/03/2025240362120Open ↗
▸BISADDITIONAL INFORMATION1
07/28/2025240362120Open ↗
▸Other Documents8
▸DOB NOWProperty Ownership Certification2
08/20/2026X01153629-I1Open ↗
08/18/2026X01157822-I1Open ↗
▸DOB NOWLocal Law 92/94 of 2019 Sustainable Roof Zone1
08/13/2026X01157822-I1Open ↗
▸DOB NOWAdjoining Owners Notification1
08/13/2026X01157822-S8Open ↗
▸DOB NOWCommunity Board Notification1
08/13/2026X01153629-I1Open ↗
▸DOB NOWFull Demo: 10-Day Notice1
08/13/2026X01153629-I1Open ↗
▸DOB NOWStructure Photographs1
08/13/2026X01153629-I1Open ↗
▸DOB NOWSite Survey: Initial1
08/13/2026X01157822-I1Open ↗