Names shown beside floors are taken automatically from the text of filed documents and may be incomplete or wrong.
Whole building & multi-floor projectsPlumbing work8 filings
Plumbing work as per plans filed herewith. Filed in conjunction with NB #121207354
On file for this project
67 documents · 1 drawing sheet
Install combined wet standpipe and sprinkler system as per plans filed. Filed in conjunction with NB #121207354.
On file for this project
16 documents · 1 drawing sheet
Filed herewith plans & applications for installation of a dry temporary standpipe during construction. Filed in conjunction with NB #121207354.
On file for this project
3 documents · 1 drawing sheet
Latest 3 of 8 filings on this floor.
RoofInstall new emergency generator3p · 3 filings
ArchitectureElectricalFire ProtectionGeneralMechanicalPlumbingStructural
Issued Permit Scope
Mechanical Systems · Plumbing · Protection and Mechanical Methods · Sprinklers · Standpipe · Structural
INSTALL NEW EMERGENCY GENERATOR AS PER PLANS FILED. NO CHANGE TO USE, EGRESS, OR OCCUPANCY. FILED IN CONJUNCTION WITH NB #121207354.
On file for this project
6 documents · 1 drawing sheet
INSTALLATION OF TEMPORARY ROOF / OVERHEAD PROTECTION AT ADJACENT PROPERTIES AS PER DRAWINGS DURING NB CONST, FILED SEP. ROOF / OVERHEAD PROTECTION SHALL COMPLY WITH CH #33 OF THE NYC BC. NO CHANGE IN USE, OCCUPANCY OR EGRESS UNDER THIS APPLICATION.
On file for this project
2 documents · 1 drawing sheet
Filing application for the demo of sprinkler system for floors 2nd through Roof.
On file for this project
4 documents · 1 drawing sheet
Floor 11Unit 11D1 filing · 2 docs
ArchitectureElectricalEquipmentFire ProtectionGeneralMechanicalPlumbingStructural
Issued Permit Scope
General Construction · Mechanical Systems · Plumbing · Protection and Mechanical Methods · Sprinklers · Standpipe · Structural · Supported Scaffold
Application filed to renovate apartment 11D with modifications to the non bearing partitions with new finishes - no change to use, egress or occupancy
On file for this project
2 documents
Floor 10
Floor 9
Floor 8
Floor 7
Floor 6
Floor 5Cellar to 5th floor sprinkler removal3 filings
ArchitectureElectricalEquipmentFire ProtectionGeneralMechanicalPlumbingStructural
Issued Permit Scope
Mechanical Systems · Plumbing · Protection and Mechanical Methods · Sprinklers · Standpipe · Structural · Supported Scaffold
REMOVAL OF ENTIRE SPRINKLER SYSTEM ON CELLAR TO 5TH FLOOR. VACANT BUILDING PRIOR TO PARTIAL BUILDING DEMOLITION. NO SUPPORTING OR STRUCTURAL ELEMENTS ARE TO BE DISTURBED. NO FIRE RATED SHAFTS, STAIRWAYS, OR CORRIDORS ARE TO BE DAMAGED OR REMOVED.
On file for this project
5 documents
Filing application for the demo of sprinkler system for floors 2nd through Roof.
On file for this project
4 documents
REMOVAL OF ENTIRE SPRINKLER SYSTEM ON CELLAR TO 5TH FLOOR. VACANT BUILDING PRIOR TO PARTIAL BUILDING DEMOLITION. NO SUPPORTING OR STRUCTURAL ELEMENTS ARE TO BE DISTURBED. NO FIRE RATED SHAFTS, STAIRWAYS, OR CORRIDORS ARE TO BE DAMAGED OR REMOVED.
On file for this project
4 documents
Floor 4Cellar to 5th floor sprinkler removal3 filings
ArchitectureElectricalEquipmentFire ProtectionGeneralMechanicalPlumbingStructural
Issued Permit Scope
Mechanical Systems · Plumbing · Protection and Mechanical Methods · Sprinklers · Standpipe · Structural · Supported Scaffold
REMOVAL OF ENTIRE SPRINKLER SYSTEM ON CELLAR TO 5TH FLOOR. VACANT BUILDING PRIOR TO PARTIAL BUILDING DEMOLITION. NO SUPPORTING OR STRUCTURAL ELEMENTS ARE TO BE DISTURBED. NO FIRE RATED SHAFTS, STAIRWAYS, OR CORRIDORS ARE TO BE DAMAGED OR REMOVED.
On file for this project
5 documents
Filing application for the demo of sprinkler system for floors 2nd through Roof.
On file for this project
4 documents
REMOVAL OF ENTIRE SPRINKLER SYSTEM ON CELLAR TO 5TH FLOOR. VACANT BUILDING PRIOR TO PARTIAL BUILDING DEMOLITION. NO SUPPORTING OR STRUCTURAL ELEMENTS ARE TO BE DISTURBED. NO FIRE RATED SHAFTS, STAIRWAYS, OR CORRIDORS ARE TO BE DAMAGED OR REMOVED.
On file for this project
4 documents
Floor 3Toll Brothers City Living1p · 5 filings
ArchitectureElectricalEquipmentFire ProtectionGeneralMechanicalPlumbingStructural
Issued Permit Scope
General Construction · Mechanical Systems · Plumbing · Protection and Mechanical Methods · Sprinklers · Standpipe · Structural · Supported Scaffold
THIS APPLICATION IS FILED FOR A TEMP USE PERMIT FOR A SALES OFFICE INCLUDING MODEL APARTMENTS PURSUANT TO SECTION AC 28 - 111 AND BUILDINGS BULLETIN 2010- 002.
On file for this project
7 documents · 1 drawing sheet
REMOVAL OF ENTIRE SPRINKLER SYSTEM ON CELLAR TO 5TH FLOOR. VACANT BUILDING PRIOR TO PARTIAL BUILDING DEMOLITION. NO SUPPORTING OR STRUCTURAL ELEMENTS ARE TO BE DISTURBED. NO FIRE RATED SHAFTS, STAIRWAYS, OR CORRIDORS ARE TO BE DAMAGED OR REMOVED.
On file for this project
5 documents
INSTALLATION OF TEMPORARY SUPPORT PROVIDING RELIEF AND SAFETY DURING INVESTIGATION AND REMEDIATION OF EXISTING COLUMN 21 AS PER PLANS FILED HEREWITH. THIS APPLICATION IS RELATED TO PSWO COMPLAINT#1614418.
On file for this project
3 documents
Latest 3 of 5 filings on this floor.
Floor 2Toll Brothers City Living4 filings
ArchitectureElectricalEquipmentFire ProtectionGeneralMechanicalPlumbingStructural
Issued Permit Scope
General Construction · Mechanical Systems · Plumbing · Protection and Mechanical Methods · Sprinklers · Standpipe · Structural · Supported Scaffold
REMOVAL OF ENTIRE SPRINKLER SYSTEM ON CELLAR TO 5TH FLOOR. VACANT BUILDING PRIOR TO PARTIAL BUILDING DEMOLITION. NO SUPPORTING OR STRUCTURAL ELEMENTS ARE TO BE DISTURBED. NO FIRE RATED SHAFTS, STAIRWAYS, OR CORRIDORS ARE TO BE DAMAGED OR REMOVED.
On file for this project
5 documents
INSTALLATION OF TEMPORARY SUPPORT PROVIDING RELIEF AND SAFETY DURING INVESTIGATION AND REMEDIATION OF EXISTING COLUMN 21 AS PER PLANS FILED HEREWITH. THIS APPLICATION IS RELATED TO PSWO COMPLAINT#1614418.
On file for this project
3 documents
Filing application for the demo of sprinkler system for floors 2nd through Roof.
On file for this project
4 documents
Latest 3 of 4 filings on this floor.
Floor 1CVS Pharmacy5p · 6 filings · 20 docs
ArchitectureElectricalEquipmentFire ProtectionGeneralMechanicalPlumbingStructural
Issued Permit Scope
General Construction · Mechanical Systems · Plumbing · Sprinklers · Standpipe · Structural · Supported Scaffold
MODIFY EXISTING SPRINKLER SYSTEM FOR NEW CVS TENANT SPACE. NO CHANGE IN USE, OCCUPANCY OR EGRESS.
On file for this project
2 documents
PLUMBING MODIFICATIONS FOR GROUND FLOOR COMMERCIAL SPACE AS PER PLANS FILED HEREWITH.
On file for this project
22 documents · 3 drawing sheets
THIS APPLICATION IS FILED FOR A TEMP USE PERMIT FOR A SALES OFFICE INCLUDING MODEL APARTMENTS PURSUANT TO SECTION AC 28 - 111 AND BUILDINGS BULLETIN 2010- 002.
On file for this project
7 documents · 1 drawing sheet
Latest 3 of 6 filings on this floor.
CellarCVS Pharmacy5p · 6 filings · 20 docs
ArchitectureFire ProtectionMechanicalPlumbingStructural
Issued Permit Scope
General Construction · Mechanical Systems · Plumbing · Sprinklers · Standpipe · Structural
MODIFY EXISTING SPRINKLER SYSTEM FOR NEW CVS TENANT SPACE. NO CHANGE IN USE, OCCUPANCY OR EGRESS.
On file for this project
2 documents
PLUMBING MODIFICATIONS FOR GROUND FLOOR COMMERCIAL SPACE AS PER PLANS FILED HEREWITH.
On file for this project
22 documents · 3 drawing sheets
REMOVAL OF ENTIRE SPRINKLER SYSTEM ON CELLAR TO 5TH FLOOR. VACANT BUILDING PRIOR TO PARTIAL BUILDING DEMOLITION. NO SUPPORTING OR STRUCTURAL ELEMENTS ARE TO BE DISTURBED. NO FIRE RATED SHAFTS, STAIRWAYS, OR CORRIDORS ARE TO BE DAMAGED OR REMOVED.
On file for this project
5 documents · 1 drawing sheet
Latest 3 of 6 filings on this floor.
Site & exteriorCVS Pharmacy10 filings · 20 docs
ArchitectureElectricalEquipmentGeneralMechanicalStructuralZ
Issued Permit Scope
Construction Fence · Protection and Mechanical Methods · Sidewalk Shed · Sign · Supported Scaffold
ILLUMINATED NON-ADVERTISING ACCESSORY WALL SIGN - CVS PHARMACY. NO CHANGE OF USE, EGRESS OR OCCUPANCY.
On file for this project
2 documents · 2 drawing sheets
INSTALLATION OF DUAL 6427 # CAPACITY PERSONNEL/MATERIAL HOISTS DURING NB CONST, FILED SEP. HOISTS SHALL COMPLY WITH CH #33 OF THE NYC BC. NO CHANGE IN USE, OCCUPANCY OR EGRESS UNDER THIS APPLICATION. ELEVATOR APPLICATION SUBMITTED SEPARATELY
On file for this project
2 documents · 5 drawing sheets
INSTALLATION OF HEAVY DUTY SIDEWALK SHED DURING NB CONST, FILED SEP. SIDEWALK SHED SHALL COMPLY WITH CH #33 OF THE NYC BC. NO CHANGE IN USE, OCCUPANCY OR EGRESS UNDER THIS APPLICATION.
On file for this project
6 documents · 5 drawing sheets
Latest 3 of 10 filings on this floor.