← Back
BuildNYC
Miscellaneous two family
269 COLUMBIA STREET
BROOKLYN · BIN 3004861
💬 Discuss this project
1920Year Built
3Stories
B9Building Class
R6AZoning
1,950 sfGross Floor Area
2Units
0 Active Violations
Miscellaneous two family · 1,700 sf lot · 1.15 FAR built · Flood zone X
Locations of Work
Names shown beside floors are taken automatically from the text of filed documents and may be incomplete or wrong.
Roof1 filing · 20 docs
Penthouse1 filing · 20 docs
Floor 31 filing · 20 docs
Floor 2
Floor 1Unit 1C1 filing · 20 docs
Cellar1 filing · 20 docs
▾Sales History (ACRIS)
DatePriceUnitSeller → Buyer$/sf
07/08/2021$2.8M—Private party → Private party$1,410/sf building
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
Anz Consulting Engineering204/29/2024
Silman104/23/2024
Mark Gettys Architect104/17/2024
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
Municipal Building Consultants403/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
Kay WaterproofingGeneral Contractor306/12/2001
Rep ConstructionPlumbing108/31/1999
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
Anz Consulting Engineering3946104/19/2024
Building Lifecycle
04/21/2026
Boiler inspection report filed
Initial · no defects · Accepted
06/24/2025
Boiler inspection report filed
Initial · no defects · Accepted
10/25/2024
Objection resolved — Addressed
10/21/2024
Objection resolved — Addressed
09/26/2024
Objection resolved — Addressed
76 history events on file for this building. Sign in free to see the full history. Sign in · Create account
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
BIS—ISSUEDKay Waterproofing06/12/2001
BISPLISSUEDRep Construction08/31/1999
BIS—ISSUEDKay Waterproofing07/14/1999
BIS—ISSUEDKay Waterproofing08/27/1998
1 project · most recent 04/29/2024
Heating and Air Conditioning Systems
FiledStatusContractorScope
04/29/2024——Heating and Air Conditioning Systems
1 project · most recent 04/29/2024
Water/Sanitary
FiledStatusContractorScope
04/29/2024——Water/Sanitary
1 project · most recent 04/29/2024
Steel Wood
FiledStatusContractorScope
04/29/2024——Steel, Wood
▾Special Inspection Requirements (DOB NOW) — 23
DateRequirementInspectorRole
09/10/2024HVAC-R and service water heating system controlsALBERT ZIRINOenergy_progress
09/10/2024HVAC-R and service water heating equipmentALBERT ZIRINOenergy_progress
09/03/2024Construction Utilizing CLT or SCL, Type IV—special
07/23/2024Shutoff dampersALBERT ZIRINOenergy_progress
07/22/2024Structural Stability – Alterations of existing buildings—special
04/24/2024Post-installed Anchors—special
04/24/2024HVAC-R and service water piping design and insulationALBERT ZIRINOenergy_progress
04/24/2024Fire-Resistant Penetrations and Joints—special
04/18/2024Structural Stability – Alterations of existing buildings—special
04/15/2024Duct leakage testing, insulation and designALBERT ZIRINOenergy_progress
04/15/2024Structural Steel - High Strength Bolting—special
04/15/2024Structural Steel - Welding—special
04/15/2024Structural Steel - Details—special
04/15/2024Post-installed Anchors—special
04/15/2024FinalALBERT ZIRINOprogress
04/15/2024Final—progress
04/15/2024Structural Wood Frame—progress
04/15/2024Energy Code Compliance InspectionsALBERT ZIRINOprogress
04/15/2024HVAC-R and service water heating equipmentALBERT ZIRINOenergy_progress
04/15/2024Mechanical SystemsALBERT ZIRINOspecial
04/15/2024HVAC-R and service water heating system controlsALBERT ZIRINOenergy_progress
04/15/2024Maintenance informationALBERT ZIRINOenergy_progress
04/15/2024HVAC-R and service water piping design and insulationALBERT ZIRINOenergy_progress
23 filed documents on file for this building. Sign in free to see the full history. Sign in · Create account