← Back
Miscellaneous two family
269 HOOPER STREET
BROOKLYN · BIN 3060278
💬 Discuss this project
1901Year Built
2Stories
B9Building Class
R6Zoning
4,228 sfGross Floor Area
2Units
Miscellaneous two family · 1,875 sf lot · 2.25 FAR built · Flood zone X
Locations of Work
ArchitectureStructuralMechanicalPlumbingFire Protection
Roof5p · 2 filings · 20 docs
Bulkhead4p · 3 filings · 20 docs
Floor 51p · 1 filing · 20 docs
Floor 45p · 3 filings · 20 docs
Floor 36p · 2 filings · 20 docs
Floor 25p · 3 filings · 20 docs
Floor 11p · 1 filing · 8 docs
Cellar11p · 2 filings · 20 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
KAJ NY CONSTRUCTION607/08/2026
▾Design Consultants (Architect / Engineer of Record)
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
AJ SERVICE EXPERTS1003/21/2026
BMG GROUP USA803/21/2026
ADVANCED BUILDERS SERVICES103/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
GOLDEN BUILDERS NY INCGeneral Contractor907/08/2026
ARYE DEBLINGERElectrical503/21/2026
ADD ELECTRICAL CONTRG INC 004175General Contractor503/22/2026
BLUE ELM INCGeneral Contractor407/08/2026
KAJ NY CONSTRUCTION INCGeneral Contractor407/08/2026
B&B MECH PLBG & HTG LLCPlumbing107/08/2026
TARGET PIPING NY LLCFire Protection107/08/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
HRF SERVICES CORP56161002/27/2023
Building Lifecycle
All (121)Filed (14)Permit Issued (11)Signed Off (7)Inspection (9)Objection (50)Special Inspection (30)
03/17/2023
Signed off — Alteration
PLUMING AND SPRINKLER APPLICATION FILED IN CONJUNCTION WITH DOB NOW ALT 1 APPLICATION B00466973
B00514717-I1
03/06/2023
Inspection — Certified Storm Drainage-ST-Fixtures-Finish
Certified
View inspection ↗
03/06/2023
Inspection — Certified Water and Sanitary-WS-Fixtures-Finish
Certified
View inspection ↗
03/06/2023
Inspection — Pass-Final PL - Up to 9 Requested Floors
Pass
View inspection ↗
03/03/2023
Special inspection requirement — Energy Code Compliance Inspections
FAHAD FATEH
03/03/2023
Special inspection requirement — Sprinkler Systems
FAHAD FATEH
03/03/2023
Special inspection requirement — Fire-Resistant Penetrations and Joints
FAHAD FATEH
03/03/2023
Special inspection requirement — Private On-Site Storm Water Disposal Systems-, and Detention Facilities, Installation
FAHAD FATEH
02/27/2023
Filed — Alteration
PLUMING AND SPRINKLER APPLICATION FILED IN CONJUNCTION WITH DOB NOW ALT 1 APPLICATION B00466973
B00514717-P4
02/27/2023
Special inspection requirement — HVAC-R and service water piping design and insulation
FAHAD FATEH
02/27/2023
Special inspection requirement — Private On-Site Storm Water Disposal Systems-, and Detention Facilities, Installation
FAHAD FATEH
02/27/2023
Special inspection requirement — Maintenance information
FAHAD FATEH
02/27/2023
Special inspection requirement — HVAC-R and service water heating equipment
FAHAD FATEH
02/27/2023
Special inspection requirement — Sprinkler Systems
FAHAD FATEH
02/27/2023
Special inspection requirement — Energy Code Compliance Inspections
FAHAD FATEH
02/27/2023
Special inspection requirement — HVAC-R and service water heating system controls
FAHAD FATEH
02/27/2023
Special inspection requirement — Fire-Resistant Penetrations and Joints
FAHAD FATEH
02/24/2023
Signed off — Alteration
Foundation and Earthwork Application filed as a subsequent filing of B00466973-I1
B00466973-I1
02/22/2023
Inspection — Pass-Final General Construction Non-Directive 14
Pass
View inspection ↗
02/17/2023
Signed off — Alteration
Foundation and Earthwork Application filed as a subsequent filing of B00466973-I1
B00466973-S3
02/17/2023
Signed off — Alteration
B00506345-I1
02/14/2023
Filed — Alteration
PLUMING AND SPRINKLER APPLICATION FILED IN CONJUNCTION WITH DOB NOW ALT 1 APPLICATION B00466973
B00514717-P3
02/14/2023
Special inspection requirement — Maintenance information
FAHAD FATEH
02/14/2023
Special inspection requirement — HVAC-R and service water heating equipment
FAHAD FATEH
02/14/2023
Special inspection requirement — HVAC-R and service water piping design and insulation
FAHAD FATEH
02/14/2023
Special inspection requirement — Sprinkler Systems
FAHAD FATEH
02/14/2023
Special inspection requirement — HVAC-R and service water heating system controls
FAHAD FATEH
02/14/2023
Special inspection requirement — Fire-Resistant Penetrations and Joints
FAHAD FATEH
02/14/2023
Special inspection requirement — Private On-Site Storm Water Disposal Systems-, and Detention Facilities, Installation
FAHAD FATEH
02/14/2023
Special inspection requirement — Energy Code Compliance Inspections
FAHAD FATEH
02/13/2023
Signed off — Alteration
Foundation and Earthwork Application filed as a subsequent filing of B00466973-I1
B00466973-S2
02/13/2023
Inspection — Fail-Final General Construction Non-Directive 14
Fail
View inspection ↗
02/07/2023
Permit issued — General Construction
B00466973-I1-GC
02/07/2023
Inspection — Certified Sprinkler-SP-Fixtures-Finish
Certified
View inspection ↗
02/07/2023
Inspection — Pass-Final PL - Up to 9 Requested Floors
Pass
View inspection ↗
02/03/2023
Inspection — Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic Test
Certified
View inspection ↗
12/27/2022
Signed off — Alteration
B00511929-I1
09/14/2022
Permit issued — Foundation
B00466973-S3-FO-EA
09/07/2022
Permit issued — Structural
B00466973-S2-ST
08/29/2022
Objection resolved — Addressed
08/29/2022
Objection resolved — Addressed
08/02/2022
Inspection — Pass-Final PL - Up to 9 Requested Floors
Pass
View inspection ↗
07/08/2022
Objection raised — Scope
07/06/2022
Objection raised — Scope
06/24/2022
Permit issued — Sprinklers
B00514717-I1-PL
06/24/2022
Permit issued — Plumbing
B00514717-I1-EW-SP
06/23/2022
Objection resolved — Addressed
06/20/2022
Objection resolved — Addressed
06/02/2022
Signed off — Alteration
PROPOSED INSTALLATION OF HEAVY DUTY SIDEWALK SHED AS PER PLANS. LIVE LOAD 300 PER SQUARE FEET. SIDEWALK SHED SHALL COMPLY WITH CHAPTER # 33 OF THE 2014 CODE. NO CHANGE IN USE OCCUPANCY OR EGRESS UNDER THIS APPLICATION.
B00515045-I1
06/02/2022
Objection resolved — Addressed
06/01/2022
Special inspection requirement — Final
FAHAD FATEH
06/01/2022
Special inspection requirement — Heating Systems
FAHAD FATEH
06/01/2022
Special inspection requirement — Mechanical Systems
FAHAD FATEH
06/01/2022
Special inspection requirement — Fire-Resistant Penetrations and Joints
FAHAD FATEH
06/01/2022
Special inspection requirement — Shutoff dampers
FAHAD FATEH
06/01/2022
Special inspection requirement — HVAC-R and service water heating equipment
FAHAD FATEH
06/01/2022
Special inspection requirement — Maintenance information
FAHAD FATEH
06/01/2022
Special inspection requirement — HVAC-R and service water heating system controls
FAHAD FATEH
06/01/2022
Special inspection requirement — HVAC-R and service water piping design and insulation
FAHAD FATEH
05/27/2022
Objection raised — Zoning
Latest 60 of 121 events.
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWGeneral ConstructionSigned-offGOLDEN BUILDERS NY INC02/07/2023
DOB NOWFoundationSigned-offGOLDEN BUILDERS NY INC09/14/2022
DOB NOWStructuralSigned-offGOLDEN BUILDERS NY INC09/07/2022
DOB NOWSprinklersSigned-offTARGET PIPING NY LLC06/24/2022
DOB NOWPlumbingSigned-offTARGET PIPING NY LLC06/24/2022
DOB NOWGeneral ConstructionSigned-offGOLDEN BUILDERS NY INC05/26/2022
DOB NOWGeneral ConstructionSigned-offGOLDEN BUILDERS NY INC05/20/2022
DOB NOWConstruction FenceSigned-offBLUE ELM INC04/07/2022
DOB NOWSidewalk ShedSigned-offKAJ NY CONSTRUCTION INC04/05/2022
DOB NOWSidewalk ShedSigned-offKAJ NY CONSTRUCTION INC05/05/2021
DOB NOWConstruction FenceSigned-offBLUE ELM INC05/04/2021
2 projects · most recent 01/19/2022
General Wiring
FiledStatusContractorScope
01/19/2022CompleteADD ELECTRICAL CONTRG INCGeneral Wiring
05/03/2021Permit IssuedRICHARD NEU—
▾Field Inspections (DOB CAP) — 9
DateTypeResultReport
03/06/2023Certified Storm Drainage-ST-Fixtures-FinishCertifiedView ↗
03/06/2023Certified Water and Sanitary-WS-Fixtures-FinishCertifiedView ↗
03/06/2023Pass-Final PL - Up to 9 Requested FloorsPassView ↗
02/22/2023Pass-Final General Construction Non-Directive 14PassView ↗
02/13/2023Fail-Final General Construction Non-Directive 14FailView ↗
02/07/2023Certified Sprinkler-SP-Fixtures-FinishCertifiedView ↗
02/07/2023Pass-Final PL - Up to 9 Requested FloorsPassView ↗
02/03/2023Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic TestCertifiedView ↗
08/02/2022Pass-Final PL - Up to 9 Requested FloorsPassView ↗
▾Special Inspection Requirements (DOB NOW) — 77
DateRequirementInspectorRole
03/03/2023Energy Code Compliance InspectionsFAHAD FATEHprogress
03/03/2023Private On-Site Storm Water Disposal Systems-, and Detention Facilities, InstallationFAHAD FATEHspecial
03/03/2023Fire-Resistant Penetrations and JointsFAHAD FATEHspecial
03/03/2023Sprinkler SystemsFAHAD FATEHspecial
02/27/2023HVAC-R and service water heating equipmentFAHAD FATEHenergy_progress
02/27/2023Energy Code Compliance InspectionsFAHAD FATEHprogress
02/27/2023Sprinkler SystemsFAHAD FATEHspecial
02/27/2023HVAC-R and service water heating system controlsFAHAD FATEHenergy_progress
02/27/2023Maintenance informationFAHAD FATEHenergy_progress
02/27/2023HVAC-R and service water piping design and insulationFAHAD FATEHenergy_progress
02/27/2023Private On-Site Storm Water Disposal Systems-, and Detention Facilities, InstallationFAHAD FATEHspecial
02/27/2023Fire-Resistant Penetrations and JointsFAHAD FATEHspecial
02/14/2023Private On-Site Storm Water Disposal Systems-, and Detention Facilities, InstallationFAHAD FATEHspecial
02/14/2023HVAC-R and service water heating equipmentFAHAD FATEHenergy_progress
02/14/2023Maintenance informationFAHAD FATEHenergy_progress
02/14/2023HVAC-R and service water heating system controlsFAHAD FATEHenergy_progress
02/14/2023HVAC-R and service water piping design and insulationFAHAD FATEHenergy_progress
02/14/2023Energy Code Compliance InspectionsFAHAD FATEHprogress
02/14/2023Fire-Resistant Penetrations and JointsFAHAD FATEHspecial
02/14/2023Sprinkler SystemsFAHAD FATEHspecial
06/01/2022Heating SystemsFAHAD FATEHspecial
06/01/2022HVAC-R and service water heating system controlsFAHAD FATEHenergy_progress
06/01/2022Maintenance informationFAHAD FATEHenergy_progress
06/01/2022HVAC-R and service water piping design and insulationFAHAD FATEHenergy_progress
06/01/2022HVAC-R and service water heating equipmentFAHAD FATEHenergy_progress
Latest 25 of 77.
▾Documents — 90 on file (BIS + DOB NOW)
▸Plans & Drawings14
▸DOB NOWPlans/Sketch12
09/01/2026B00466973-S3Request digital key ↗
09/01/2026B00466973-P3Request digital key ↗
09/01/2026B00466973-P4Request digital key ↗
Showing 3 of 12 on file for this type
▸DOB NOWPlans/Sketch - General Construction2
09/01/2026B00466973-P1Request digital key ↗
08/15/2026B00466973-I1Request digital key ↗
▸Applications & Permits4
▸BISPLAN / WORK APPROVAL APPLICATION4
02/28/2023340860134Open ↗
02/28/2023322109632Open ↗
08/06/2022322109632Open ↗
Showing 3 of 4 on file for this type
▸Zoning, Tax Lot & Property Records2
▸DOB NOWZD1: DOB Zoning Diagram2
08/13/2026B00466973-P1Open ↗
08/13/2026B00466973-I1Open ↗
▸Seals & Professional Certifications50
▸DOB NOWSpecial Inspector Seal & Signature21
09/15/2026B00514717-P3Open ↗
09/02/2026B00466973-S3Open ↗
09/02/2026B00466973-S3Open ↗
Showing 3 of 21 on file for this type
▸DOB NOWProgress Inspector Seal & Signature14
09/15/2026B00514717-P3Open ↗
09/15/2026B00514717-P3Open ↗
09/02/2026B00466973-S3Open ↗
Showing 3 of 14 on file for this type
▸DOB NOWDPL-1: Design Professional Seal & Signature14
09/01/2026B00466973-P3Open ↗
09/01/2026B00466973-P4Open ↗
09/01/2026B00466973-I1Open ↗
Showing 3 of 14 on file for this type
▸BISAPPLICANT OWNER SIGNATURE1
07/14/2022340860134Open ↗
▸Trade Schedules & Equipment2
▸DOB NOWDEP: Sewer Certification (Sanitary/Storm)2
08/13/2026B00466973-P1Open ↗
08/13/2026B00466973-I1Open ↗
▸Environmental & Asbestos2
▸DOB NOWDEP ACP-5: Asbestos Assessment Report2
09/01/2026B00466973-P1Open ↗
08/15/2026B00466973-I1Open ↗
▸Energy Compliance3
▸DOB NOWEN2: As Built Energy Analysis.3
08/13/2026B00506345-I1Open ↗
08/13/2026B00466973-I1Open ↗
08/13/2026B00514717-I1Open ↗
▸Cost, Insurance & Ownership2
▸DOB NOWCertification by Insurance Broker or Agency1
08/13/2026B00466973-I1Open ↗
▸DOB NOWCertificate of Insurance1
08/13/2026B00466973-I1Open ↗
▸Filing & Intake Forms2
▸BISEFILING JOB APPLICATION COVER SHEET1
07/14/2022340860134Open ↗
▸BISEFILING COVER SHEET1
08/06/2022322109632Open ↗
▸Other Documents9
▸DOB NOWPlot Diagram4
08/13/2026B00466973-P1Open ↗
08/13/2026B00466973-S3Open ↗
08/13/2026B00466973-I1Open ↗
Showing 3 of 4 on file for this type
▸DOB NOWLocal Law 92/94 of 2019 Sustainable Roof Zone2
08/13/2026B00466973-P1Open ↗
08/13/2026B00466973-I1Open ↗
▸BISBPP: PHOTOS-SIGNED/SEALED BY APPLICANT1
07/15/2022340860134Open ↗
▸DOB NOWAdditional Insured Authorizations1
08/13/2026B00466973-I1Open ↗
▸DOB NOWAdjoining Owners Notification1
08/13/2026B00466973-S3Open ↗