| Owner | Filings | Most Recent |
|---|---|---|
| JOE DAMICO CONSTRUCTION | 18 | 07/08/2026 |
| NINA SALES ENTERPRISES | 4 | 03/21/2026 |
| Date | Price | Unit | Seller → Buyer | $/sf |
|---|---|---|---|---|
| 02/13/2025 | $2.2M | — | Private party → CITIA NOVA, LLC | $794/sf building |
| Firm | Filings | Most Recent |
|---|---|---|
| KZ ENGINEERING, P.C | 2 | 03/04/2026 |
| VATCHE GHAZARIAN, PE | 1 | 02/18/2026 |
| FRANK PETRUSO ARCHITECT PC | 3 | 02/06/2026 |
| SIDERIS KEFALAS ENGINEERS PC | 2 | 01/22/2026 |
| STROH ENGINEERING SERVICES, P.C. | 2 | 07/01/2025 |
| KSI PROFESSIONAL ENGINEERS | 1 | 11/09/2020 |
| GUTH DECONZO CONSULTING ENGINEERS, | 2 | 11/06/2020 |
| Representative | Filings | Most Recent |
|---|---|---|
| SYNERGY BUILDING CONSULTANTS | 2 | 03/21/2026 |
| AC EXPEDITING | 2 | 03/21/2026 |
| FRANK PETRUSORA AOL COM | 6 | 03/21/2026 |
| URBAN PIONEERING ARCHITECTURE DPC | 6 | 03/21/2026 |
| Firm | Trade | Roles | Most Recent |
|---|---|---|---|
| JOE D'AMICO CONSTRUCTION | General Contractor | 6 | 07/08/2026 |
| CEPRINE CONSTRUCTION INC | General Contractor | 5 | 07/08/2026 |
| Agency | License # | Filings | Most Recent |
|---|---|---|---|
| AA BUILDING & INSPECTION | 1519 | 1 | 07/31/2025 |
| STROH ENGINEERING SERVICE | 3316 | 1 | 04/23/2025 |
| Source | Work Type | Status | Applicant | Issued |
|---|---|---|---|---|
| DOB NOW | Sidewalk Shed | Permit Issued | CEPRINE CONSTRUCTION INC | 06/02/2026 |
| DOB NOW | Sidewalk Shed | Permit Issued | CEPRINE CONSTRUCTION INC | 03/05/2026 |
| DOB NOW | General Construction | Permit Issued | JOE D'AMICO CONSTRUCTION | 02/10/2026 |
| DOB NOW | Construction Fence | Permit Issued | JOE D'AMICO CONSTRUCTION | 02/10/2026 |
| DOB NOW | Construction Fence | Permit Issued | JOE D'AMICO CONSTRUCTION | 09/26/2025 |
| DOB NOW | Sidewalk Shed | Signed-off | CEPRINE CONSTRUCTION INC | 08/07/2025 |
| DOB NOW | Full Demolition | Signed-off | JOE D'AMICO CONSTRUCTION | 08/04/2025 |
| DOB NOW | Construction Fence | Signed-off | JOE D'AMICO CONSTRUCTION | 07/31/2025 |
| DOB NOW | Construction Fence | Signed-off | JOE D'AMICO CONSTRUCTION | — |
| Filed | Status | Contractor | Scope | Make / Model / Capacity |
|---|---|---|---|---|
| 01/22/2026 | Permit Issued | JOE D'AMICO CONSTRUCTION | Heating and Air Conditioning Systems | Heat / Cool Mitsubishi Electric MXZ-SM36NLHZ 36,000 BTU · Condensing Unit ×9 MXZ-4D30NL 28,400 BTU · Condensing Unit ×3 MXZ-3D24NL 22,000 BTU · Condensing Unit ×1 |
| 11/04/2020 | — | — | Air Conditioning Systems, Heating Systems, Ventilation Systems | Cooling Lg ARUN024GSS4 24,000 BTU · Vrf Outdoor ×6 ARUN038GSS4 38,000 BTU · Vrf Outdoor ×4 ARUN048GSS4 48,000 BTU · Vrf Outdoor ×1 LS120HSV5 12,000 BTU · Heat Pump Outdoor ×1 Heating Lg ARUN024GSS4 27,000 BTU · Vrf Outdoor ×5 ARUN038GSS4 42,000 BTU · Vrf Outdoor ×4 ARUN024GSS$ 27,000 BTU · Vrf Outdoor ×1 ARUN048GSS4 54,000 BTU · Vrf Outdoor ×1 LS120HSV5 13,600 BTU · Heat Pump Outdoor ×1 Ventilation Nu-Air CEC1000ERV 745 CFM · Erv ×1 |
| Filed | Status | Contractor | Scope |
|---|---|---|---|
| 01/22/2026 | — | — | Sprinkler System |
| Filed | Status | Contractor | Scope |
|---|---|---|---|
| 01/22/2026 | — | — | — |
| Filed | Status | Contractor | Scope |
|---|---|---|---|
| 02/27/2026 | Permit Issued | HIGH QUALITY ELEC.OF NYC | — |
| 10/10/2025 | Permit Issued | TOPP WIRE ELECTRIC, INC | General Wiring |
| 07/07/2025 | Permit Issued | TOPP WIRE ELECTRIC, INC | 1 meters, 1 new_meters |
| Filed | Status | Contractor | Scope |
|---|---|---|---|
| 11/09/2020 | — | — | Steel, Concrete, Masonry |
| Filed | Status | Contractor | Scope |
|---|---|---|---|
| 02/06/2026 | Permit Issued | JOE D'AMICO CONSTRUCTION | Fence |
| Date | Requirement | Inspector | Role |
|---|---|---|---|
| 02/17/2026 | Concrete - Cast-In-Place | — | special |
| 02/17/2026 | Excavations - Sheeting, Shoring, and Bracing | — | special |
| 01/02/2026 | Maintenance information | — | energy_progress |
| 01/02/2026 | Duct leakage testing, insulation and design | — | energy_progress |
| 01/02/2026 | Shutoff dampers | — | energy_progress |
| 01/02/2026 | HVAC-R and service water heating system controls | — | energy_progress |
| 01/02/2026 | Final | — | progress |
| 01/02/2026 | HVAC-R and service water heating equipment | — | energy_progress |
| 01/02/2026 | Sprinkler Systems | — | special |
| 01/02/2026 | Fire-Resistant Penetrations and Joints | — | special |
| 01/02/2026 | Mechanical Systems | — | special |
| 01/02/2026 | HVAC-R and service water piping design and insulation | — | energy_progress |
| 01/02/2026 | Fire-Resistant Penetrations and Joints | — | special |
| 01/02/2026 | Post-installed Anchors | — | special |
| 02/19/2025 | Structural Stability – Alterations of existing Buildings | PETER STROH | special |
| 02/19/2025 | Demolition | PETER STROH | special |
| 10/29/2020 | Structural Stability – Alterations of existing buildings | — | special |
| 10/22/2020 | Shutoff dampers | — | energy_progress |
| 10/22/2020 | Heating Systems | — | special |
| 10/22/2020 | Maintenance information | — | energy_progress |
| 10/22/2020 | HVAC insulation and sealing | — | energy_progress |
| 10/22/2020 | HVAC and service water heating system controls | — | energy_progress |
| 10/22/2020 | HVAC and service water heating equipment | — | energy_progress |
| 09/17/2020 | Structural Cold-Formed Steel | — | special |
| 09/14/2020 | Masonry | — | special |