Office with commercial, 1-6 stories
27-07 FRANCIS LEWIS BLVD
QUEENS · Auburndale · BIN 4132768
💬 Discuss this project
1952Year Built
1Stories
O5Building Class
R4Zoning
13,400 sfGross Floor Area
2Units
0 Open ViolationsFDNY Report ↗
Office with commercial, 1-6 stories · Owner of record: 2711 FLB ASSOCIATES, LLC · 31,472 sf lot · 0.43 FAR built · Flood zone X
Locations of Work
ArchitectureStructuralMechanicalPlumbingFire Protection
Roof8p · 1 filing · 20 docs
Floor 163p · 3 filings · 20 docs
Cellar44p · 1 filing · 20 docs
Site & exterior1p · 2 filings · 5 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
US RENAL CARE NORTH FLUSHING DIALYS707/08/2026
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
ALEX ROUSH ARCHITECTS, INC.501/26/2023
SHEPHERD HARVEY & ASSOC.705/09/2022
LEON SKVIRSKY PE303/29/2022
WAVIC ENGINEERING PLLC107/30/2021
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
BOHLER ENGINEERING1303/21/2026
BUILDING BROTHERS603/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
ECC GROUP INCGeneral Contractor1007/08/2026
PAUL SIGNSScaffold307/08/2026
R.J.C. MECHANICAL CORPPlumbing207/08/2026
EMPIRE STATE ELECTL CORPElectrical103/22/2026
FULL CAPACITY FIRE CORPFire Protection107/08/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
ROYAL CONSTRUCTION P.E. S4621001/26/2023
Building Lifecycle
All (82)Filed (16)Permit Issued (10)Signed Off (6)Violation (5)Inspection (11)Objection (4)Special Inspection (30)
03/22/2023
Inspection — Pass-Final CND-Occupancy Inspection
Pass
View inspection ↗
02/08/2023
Special inspection requirement — Insulation placement and R values
SRINIVAS THIMMAPPA
02/08/2023
Special inspection requirement — Protection of exposed foundation insulation
SRINIVAS THIMMAPPA
02/08/2023
Special inspection requirement — Fenestration air leakage
SRINIVAS THIMMAPPA
02/08/2023
Special inspection requirement — Energy Code Compliance Inspections
SRINIVAS THIMMAPPA
02/08/2023
Special inspection requirement — Air barrier - visual inspection
SRINIVAS THIMMAPPA
02/08/2023
Special inspection requirement — Fire-Resistant Penetrations and Joints
EBRAHIM MIANDOABI
02/08/2023
Special inspection requirement — Exterior Insulation and Finish Systems (EIFS)
EBRAHIM MIANDOABI
02/08/2023
Special inspection requirement — Structural Stability – Alterations of existing buildings
EBRAHIM MIANDOABI
02/08/2023
Special inspection requirement — Fire-Resistance Rated Construction
SRINIVAS THIMMAPPA
02/08/2023
Special inspection requirement — Vestibules
SRINIVAS THIMMAPPA
02/08/2023
Special inspection requirement — Concrete - Cast-In-Place
EBRAHIM MIANDOABI
02/08/2023
Special inspection requirement — Fenestration and door U-factor and product ratings
SRINIVAS THIMMAPPA
02/08/2023
Special inspection requirement — Preliminary
SRINIVAS THIMMAPPA
02/08/2023
Special inspection requirement — Fenestration areas
SRINIVAS THIMMAPPA
02/08/2023
Special inspection requirement — Air barrier continuity plan testing
SRINIVAS THIMMAPPA
02/08/2023
Special inspection requirement — Air barrier — testing
SRINIVAS THIMMAPPA
01/26/2023
Filed — Alteration CO
Filing this mechanical subsequent work type for Roof top units with associated duct work and HVAC modifications as per plans filed herewith in association with the Architectural Alt.1 filing.
Q00500433-A2
01/04/2023
Signed off — Alteration CO
Filing this mechanical subsequent work type for Roof top units with associated duct work and HVAC modifications as per plans filed herewith in association with the Architectural Alt.1 filing.
Q00500433-S1
01/04/2023
Signed off — Alteration CO
Filing this mechanical subsequent work type for Roof top units with associated duct work and HVAC modifications as per plans filed herewith in association with the Architectural Alt.1 filing.
Q00500433-S2
09/28/2022
Inspection — Pass-Final CND-Occupancy Inspection
Pass
View inspection ↗
08/18/2022
Inspection — Pass-Final CND-Occupancy Inspection
Pass
View inspection ↗
07/29/2022
Signed off — Alteration
INSTALL EXTERIOR NON-ILLUMINATED SIGN ON EXISTING PYLON (U.S. RENAL CARE NORTH FLUSHING DIALYSIS 27-07 FRANCIS LEWIS BOULEVARD)
Q00695856-I1
07/29/2022
Signed off — Alteration
INSTALL EXTERIOR ILLUMINATED WALL SIGN (U.S. RENAL CARE NORTH FLUSHING DIALYSIS)
Q00695755-I1
07/29/2022
Signed off — Alteration
Q00695714-I1
07/21/2022
Inspection — Pass-Final CND-Occupancy Inspection
Pass
View inspection ↗
06/24/2022
Filed — Alteration CO
Filing this mechanical subsequent work type for Roof top units with associated duct work and HVAC modifications as per plans filed herewith in association with the Architectural Alt.1 filing.
Q00500433-A1
05/27/2022
Inspection — Certified Water and Sanitary-WS-Fixtures-Finish
Certified
View inspection ↗
05/25/2022
Special inspection requirement — Fire-Resistance Rated Construction
SRINIVAS THIMMAPPA
05/25/2022
Special inspection requirement — Energy Code Compliance Inspections
SRINIVAS THIMMAPPA
05/25/2022
Special inspection requirement — Structural Stability – Alterations of existing buildings
EBRAHIM MIANDOABI
05/25/2022
Special inspection requirement — Exterior Insulation and Finish Systems (EIFS)
EBRAHIM MIANDOABI
05/25/2022
Special inspection requirement — Concrete - Cast-In-Place
EBRAHIM MIANDOABI
05/25/2022
Special inspection requirement — Vestibules
SRINIVAS THIMMAPPA
05/25/2022
Special inspection requirement — Fenestration areas
SRINIVAS THIMMAPPA
05/25/2022
Special inspection requirement — Insulation placement and R values
SRINIVAS THIMMAPPA
05/25/2022
Special inspection requirement — Air barrier - visual inspection
SRINIVAS THIMMAPPA
05/25/2022
Special inspection requirement — Fire-Resistant Penetrations and Joints
EBRAHIM MIANDOABI
05/25/2022
Special inspection requirement — Fenestration and door U-factor and product ratings
SRINIVAS THIMMAPPA
05/25/2022
Special inspection requirement — Preliminary
SRINIVAS THIMMAPPA
05/25/2022
Special inspection requirement — Air barrier — testing
SRINIVAS THIMMAPPA
05/25/2022
Special inspection requirement — Protection of exposed foundation insulation
SRINIVAS THIMMAPPA
05/18/2022
Inspection — Pass-Final PL - Up to 3 Requested Floors
Pass
View inspection ↗
05/09/2022
Filed — Alteration CO
Filing this mechanical subsequent work type for Roof top units with associated duct work and HVAC modifications as per plans filed herewith in association with the Architectural Alt.1 filing.
Q00500433-P9
05/04/2022
Filed — Alteration CO
Filing this mechanical subsequent work type for Roof top units with associated duct work and HVAC modifications as per plans filed herewith in association with the Architectural Alt.1 filing.
Q00500433-P7
04/26/2022
Signed off — Alteration
Sprinkler modification and associated piping as per plans filed herewith. There will be no change in use, egress or occupancy.
Q00563103-I1
04/12/2022
Inspection — Pass-Final PL - Up to 3 Requested Floors
Pass
View inspection ↗
04/07/2022
Inspection — Certified Sprinkler-SP-Fixtures-Finish
Certified
View inspection ↗
04/01/2022
Permit issued — Sign
Q00695856-I1-SG
04/01/2022
Permit issued — Sign
Q00695755-I1-SG
04/01/2022
Permit issued — Sign
Q00695714-I1-SG
04/01/2022
Inspection — Certified Gas-Gas-Piping-Roughing
Certified
View inspection ↗
03/29/2022
Filed — Alteration
INSTALL EXTERIOR NON-ILLUMINATED SIGN ON EXISTING PYLON (U.S. RENAL CARE NORTH FLUSHING DIALYSIS 27-07 FRANCIS LEWIS BOULEVARD)
Q00695856-I1
03/29/2022
Filed — Alteration
INSTALL EXTERIOR ILLUMINATED WALL SIGN (U.S. RENAL CARE NORTH FLUSHING DIALYSIS)
Q00695755-I1
03/29/2022
Filed — Alteration
Q00695714-I1
03/24/2022
Inspection — Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic Test
Certified
View inspection ↗
03/07/2022
Objection resolved — Addressed
03/03/2022
Objection raised — Other
02/22/2022
Filed — Alteration CO
Filing this mechanical subsequent work type for Roof top units with associated duct work and HVAC modifications as per plans filed herewith in association with the Architectural Alt.1 filing.
Q00500433-P5
02/22/2022
Filed — Alteration CO
Filing this mechanical subsequent work type for Roof top units with associated duct work and HVAC modifications as per plans filed herewith in association with the Architectural Alt.1 filing.
Q00500433-P4
Latest 60 of 82 events.
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWSignSigned-offPAUL SIGNS, INC04/01/2022
DOB NOWSignSigned-offPAUL SIGNS, INC04/01/2022
DOB NOWSignSigned-offPAUL SIGNS, INC04/01/2022
DOB NOWPlumbingSigned-offR.J.C. MECHANICAL CORP01/05/2022
DOB NOWGeneral ConstructionPermit IssuedECC GROUP INC11/27/2021
DOB NOWMechanical SystemsSigned-offECC GROUP INC11/23/2021
DOB NOWMechanical SystemsSigned-offECC GROUP INC08/11/2021
DOB NOWSprinklersSigned-offFULL CAPACITY FIRE CORP08/10/2021
DOB NOWPlumbingSigned-offR.J.C. MECHANICAL CORP08/05/2021
DOB NOWGeneral ConstructionPermit IssuedECC GROUP INC07/30/2021
BISOTISSUEDMIDWOOD SIGN AND DESIGN INC09/21/1998
BISOTISSUEDLUIS FERMIN05/15/1998
BIS—ISSUEDULTIMATE SIGNS&DESIGNS CO05/08/1998
BIS—ISSUEDULTIMATE SIGNS&DESIGNS CO05/08/1998
BISSPISSUEDCAPITOL FIRE SPKL CO,INC03/04/1997
BISMHISSUEDHOWARD STERN MECHANICAL INC08/15/1996
BISSPISSUEDCAPITOL FIRE SPKL CO,INC11/01/1995
BISEQISSUEDDAN-HOLLY CORP09/12/1995
BISOTISSUEDDAN-HOLLY CORP09/12/1995
BISOTISSUEDBASILICA REALTY DEVELOPMENT CORP07/24/1995
1 project · most recent 01/26/2023
Air Conditioning Systems Associated Ducts and Piping Heating Systems Ventilation Systems
FiledStatusContractorScopeMake / Model / Capacity
01/26/2023Permit IssuedECC GROUP INCAir Conditioning Systems, Associated Ducts and Piping, Heating Systems, Ventilation Systems
Cooling
Trane YHD-150G3RHD4CFM* 13 tons · Rooftop Unit ×2
YHD-180G3RHD4CFM* 15 tons · Rooftop Unit ×2
Mitsubishi Electric TRUYA0121KA70NA / TPKA0A0121HA70A 425 CFM ×2
Heating
Trane YHD-150G3RHD4CFM* 250,000 BTU · Rooftop Unit ×2
YHD-180G3RHD4CFM* 350,000 BTU · Rooftop Unit ×2
Ventilation
Trane YHD-150G3RHD4CFM* 5,000 CFM · Rooftop Unit ×2
YHD-180G3RHD4CFM* 6,000 CFM · Rooftop Unit ×2
Ducts & Piping
Trane YHD-150G3RHD4CFM* 5,000 CFM · Chiller ×2
YHD-180G3RHD4CFM 6,000 CFM · Chiller ×2
1 project · most recent 01/26/2023
Gas Water/Sanitary
FiledStatusContractorScope
01/26/2023Signed-offGREAT OAKS MECHANICAL INCGas, Water/Sanitary
3 projects · most recent 05/13/2022
General Wiring
FiledStatusContractorScope
05/13/2022CompleteHABER ELECTRIC CO., INC.General Wiring
04/05/2022CompleteEMPIRE STATE ELECTL CORP—
04/05/2022CompleteEMPIRE STATE ELECTL CORP—
▾Field Inspections (DOB CAP) — 11
DateTypeResultReport
03/22/2023Pass-Final CND-Occupancy InspectionPassView ↗
09/28/2022Pass-Final CND-Occupancy InspectionPassView ↗
08/18/2022Pass-Final CND-Occupancy InspectionPassView ↗
07/21/2022Pass-Final CND-Occupancy InspectionPassView ↗
05/27/2022Certified Water and Sanitary-WS-Fixtures-FinishCertifiedView ↗
05/18/2022Pass-Final PL - Up to 3 Requested FloorsPassView ↗
04/12/2022Pass-Final PL - Up to 3 Requested FloorsPassView ↗
04/07/2022Certified Sprinkler-SP-Fixtures-FinishCertifiedView ↗
04/01/2022Certified Gas-Gas-Piping-RoughingCertifiedView ↗
03/24/2022Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic TestCertifiedView ↗
01/12/2022Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
▾Special Inspection Requirements (DOB NOW) — 84
DateRequirementInspectorRole
02/08/2023Structural Stability – Alterations of existing buildingsEBRAHIM MIANDOABIspecial
02/08/2023Fire-Resistant Penetrations and JointsEBRAHIM MIANDOABIspecial
02/08/2023Concrete - Cast-In-PlaceEBRAHIM MIANDOABIspecial
02/08/2023Exterior Insulation and Finish Systems (EIFS)EBRAHIM MIANDOABIspecial
02/08/2023PreliminarySRINIVAS THIMMAPPAprogress
02/08/2023Energy Code Compliance InspectionsSRINIVAS THIMMAPPAprogress
02/08/2023Fire-Resistance Rated ConstructionSRINIVAS THIMMAPPAprogress
02/08/2023Air barrier — testing SRINIVAS THIMMAPPAenergy_progress
02/08/2023Protection of exposed foundation insulationSRINIVAS THIMMAPPAenergy_progress
02/08/2023Fenestration areasSRINIVAS THIMMAPPAenergy_progress
02/08/2023Air barrier - visual inspectionSRINIVAS THIMMAPPAenergy_progress
02/08/2023Insulation placement and R valuesSRINIVAS THIMMAPPAenergy_progress
02/08/2023VestibulesSRINIVAS THIMMAPPAenergy_progress
02/08/2023Fenestration and door U-factor and product ratingsSRINIVAS THIMMAPPAenergy_progress
02/08/2023Fenestration air leakageSRINIVAS THIMMAPPAenergy_progress
02/08/2023Air barrier continuity plan testingSRINIVAS THIMMAPPAenergy_progress
05/25/2022Air barrier - visual inspectionSRINIVAS THIMMAPPAenergy_progress
05/25/2022Fire-Resistance Rated ConstructionSRINIVAS THIMMAPPAprogress
05/25/2022PreliminarySRINIVAS THIMMAPPAprogress
05/25/2022Fenestration areasSRINIVAS THIMMAPPAenergy_progress
05/25/2022Insulation placement and R valuesSRINIVAS THIMMAPPAenergy_progress
05/25/2022Fenestration and door U-factor and product ratingsSRINIVAS THIMMAPPAenergy_progress
05/25/2022Air barrier — testing SRINIVAS THIMMAPPAenergy_progress
05/25/2022VestibulesSRINIVAS THIMMAPPAenergy_progress
05/25/2022Protection of exposed foundation insulationSRINIVAS THIMMAPPAenergy_progress
Latest 25 of 84.
▾Documents — 132 on file (BIS + DOB NOW)
▸Plans & Drawings16
▸DOB NOWPlans/Sketch16
08/27/2026Q00563103-I1Request digital key ↗
08/26/2026Q00500433-P3Request digital key ↗
08/26/2026Q00500433-A2Request digital key ↗
Showing 3 of 16 on file for this type
▸Zoning, Tax Lot & Property Records1
▸DOB NOWHouse Number Verification: TOPO Stamp1
08/13/2026Q00500433-I1Open ↗
▸Seals & Professional Certifications100
▸DOB NOWProgress Inspector Seal & Signature62
09/27/2026Q00500433-P2Open ↗
09/27/2026Q00500433-P2Open ↗
09/27/2026Q00500433-P2Open ↗
Showing 3 of 62 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature22
09/27/2026Q00500433-P2Open ↗
09/27/2026Q00500433-P2Open ↗
09/27/2026Q00500433-P2Open ↗
Showing 3 of 22 on file for this type
▸DOB NOWDPL-1: Design Professional Seal & Signature16
08/26/2026Q00500433-A2Open ↗
08/26/2026Q00500433-A1Open ↗
08/26/2026Q00500433-P9Open ↗
Showing 3 of 16 on file for this type
▸Safety & Tenant Protection8
▸DOB NOWStreet Tree Checklist5
08/13/2026Q00500433-P4Open ↗
08/13/2026Q00500433-P1Open ↗
08/13/2026Q00500433-A1Open ↗
Showing 3 of 5 on file for this type
▸DOB NOWStreet Trees Site Plan1
08/13/2026Q00500433-I1Open ↗
▸DOB NOWStreet Tree Sign Off1
08/13/2026Q00500433-I1Open ↗
▸DOB NOWParks Department Acknowledgment Letter for Street Trees Plan1
08/13/2026Q00500433-I1Open ↗
▸Environmental & Asbestos4
▸DOB NOWDEP ACP-20/ACP-21: Asbestos Project Conditional Completion Form/Asbestos Project Completion Form4
08/26/2026Q00500433-S2Open ↗
08/26/2026Q00500433-S1Open ↗
08/26/2026Q00500433-I1Open ↗
Showing 3 of 4 on file for this type
▸Energy Compliance2
▸DOB NOWEN2: As Built Energy Analysis.2
08/13/2026Q00500433-I1Open ↗
08/13/2026Q00500433-S1Open ↗
▸Other Documents1
▸DOB NOWFinal Survey1
08/13/2026Q00500433-I1Open ↗