← Back
Elevator apt, semi-fireproof without stores
27-15 27 STREET
QUEENS · Astoria (Central) · BIN 4006903
💬 Discuss this project
2019Year Built
5Stories
D1Building Class
R6BZoning
7,489 sfGross Floor Area
10Units
Rent Stabilized0 Open Violations
Elevator apt, semi-fireproof without stores · Owner of record: SHAAD REALTY LLC · 3,235 sf lot · 2.31 FAR built · Flood zone X
Locations of Work
MechanicalFire ProtectionGeneral
Roof2p · 2 filings · 8 docs
Floor 21p · 1 filing · 5 docs
Floor 1
Cellar2p · 2 filings · 8 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
ROCHESTERE REALTY HOLDINGS607/08/2026
TRIERA CONTRACTING1707/08/2026
SHAAD REALTY1203/22/2026
DA HAI CONSTRUCTION1503/22/2026
SA HAI CONSTRUCTION INC103/22/2026
DIA HAI CONSTRUCTION INC103/22/2026
SHAHAB REALTY1603/21/2026
NEW AMERICAN CONSTRUCTION203/21/2026
▾Sales History (ACRIS)
DatePriceUnitSeller → Buyer$/sf
07/15/2015$1.6M—— → —— not available
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
CARUSONE & CHERRES ARCHITECTS, LLC103/15/2023
MADRIAGA ENGINEERING P.C.102/18/2021
GREEN DESIGN201/28/2021
ROYAL ENGINEERING, P.C202/13/2020
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
AB WORKS PROCESSING103/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
TRIERA CONTRACTING INCGeneral Contractor607/08/2026
PETER PLUMBING ASSOC. INC.Fire Protection207/08/2026
DA HAI CONSTRUCTION INCGeneral Contractor107/08/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
S&S CONCRETE & SOIL TESTI1008203/15/2023
Building Lifecycle
All (54)Filed (6)Permit Issued (7)Signed Off (4)Violation (25)Special Inspection (12)
05/11/2026
Violation issued (HPD, closed)
A
04/18/2024
Violation issued (HPD, closed)
A
03/22/2023
Signed off — Alteration
Install mechanical systems as per the plans filed herewith and in conjunction with NB#421244040. There is no change in use occupancy or egress.
Q00842281-I1
03/20/2023
Permit issued — Mechanical Systems
Q00842281-I1-MS
03/15/2023
Filed — Alteration
Install mechanical systems as per the plans filed herewith and in conjunction with NB#421244040. There is no change in use occupancy or egress.
Q00842281-I1
03/13/2023
Special inspection requirement — HVAC-R and service water heating equipment
GLEN LANGER
03/13/2023
Special inspection requirement — Maintenance information
GLEN LANGER
03/13/2023
Special inspection requirement — HVAC-R and service water heating system controls
GLEN LANGER
03/13/2023
Special inspection requirement — Shutoff dampers
GLEN LANGER
03/13/2023
Special inspection requirement — Energy Code Compliance Inspections
GLEN LANGER
03/13/2023
Special inspection requirement — HVAC-R and service water piping design and insulation
GLEN LANGER
03/10/2023
Special inspection requirement — Mechanical Systems
GLEN LANGER
03/10/2023
Special inspection requirement — Final
GLEN LANGER
12/13/2022
Signed off — Alteration
INSTALLATION OF THE SPRINKLER SYSTEM
Q00470288-I1
06/09/2022
Signed off — Alteration
INSTALLATION OF TEMPORARY HEAVY DUTY SIDEWALK SHED AS PER PLANS. NO CHANGE IN USE, EGRESS OR OCCUPANCY.SIDEWALK SHED SHALL COMPLY WITH CHAPTER #33 OF THE NYC BUILDING CODE.LIVE LOAD 300PSF.
Q00192022-I1
06/09/2022
Signed off — Alteration
INSTALLATION OF TEMPORARY (36'-54') HIGH PIPE SCAFFOLD AT VARIOUS LEVELS FOR FACADE REPAIR WORK AS PER PLAN. NO CHANGE IN USE EGRESS OR OCCUPANCY,PIPE SCAFFOLD SHALL COMPLY WITH CHAPTER#33 OF 2014 THE NY BUILDING CODE.
Q00320351-I1
03/25/2022
Permit issued — Sprinklers
Q00470288-I1-EW-SP
10/01/2021
Violation issued (ECB, closed)
Construction
06/27/2021
Violation issued (ECB, closed)
Construction
05/13/2021
Violation issued (ECB, closed)
Construction
04/14/2021
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
03/26/2021
Permit issued — Sprinklers
Q00470288-I1-EW-SP
02/18/2021
Filed — Alteration
INSTALLATION OF THE SPRINKLER SYSTEM
Q00470288-I1
02/14/2021
Special inspection requirement — Sprinkler Systems
GLEN LANGER
02/14/2021
Special inspection requirement — Fire-Resistant Penetrations and Joints
GLEN LANGER
02/02/2021
Special inspection requirement — Final
Sunil Saigal
01/29/2021
Permit issued — Supported Scaffold
Q00320351-I1-SF
01/28/2021
Filed — Alteration
INSTALLATION OF TEMPORARY (36'-54') HIGH PIPE SCAFFOLD AT VARIOUS LEVELS FOR FACADE REPAIR WORK AS PER PLAN. NO CHANGE IN USE EGRESS OR OCCUPANCY,PIPE SCAFFOLD SHALL COMPLY WITH CHAPTER#33 OF 2014 THE NY BUILDING CODE.
Q00320351-P1
01/28/2021
Permit issued — Sidewalk Shed
Q00192022-I1-SH
01/20/2021
Violation issued (ECB, closed)
Construction
01/20/2021
Violation issued (ECB, closed)
Construction
01/20/2021
Violation issued (ECB, closed)
Construction
01/20/2021
Violation issued (ECB, closed)
Construction
02/26/2020
Violation issued (ECB, closed)
Construction
02/24/2020
Filed — Alteration
INSTALLATION OF TEMPORARY (36'-54') HIGH PIPE SCAFFOLD AT VARIOUS LEVELS FOR FACADE REPAIR WORK AS PER PLAN. NO CHANGE IN USE EGRESS OR OCCUPANCY,PIPE SCAFFOLD SHALL COMPLY WITH CHAPTER#33 OF 2014 THE NY BUILDING CODE.
Q00320351-I1
02/24/2020
Permit issued — Supported Scaffold
Q00320351-I1-SF
02/13/2020
Filed — Alteration
INSTALLATION OF TEMPORARY HEAVY DUTY SIDEWALK SHED AS PER PLANS. NO CHANGE IN USE, EGRESS OR OCCUPANCY.SIDEWALK SHED SHALL COMPLY WITH CHAPTER #33 OF THE NYC BUILDING CODE.LIVE LOAD 300PSF.
Q00192022-P1
02/13/2020
Special inspection requirement — Final
Sunil Saigal
01/02/2020
Violation issued (ECB, closed)
Construction
11/04/2019
Violation issued (ECB, closed)
Construction
11/04/2019
Violation issued (ECB, closed)
Construction
11/04/2019
Violation issued (ECB, closed)
Construction
11/04/2019
Violation issued (ECB, closed)
Construction
11/04/2019
Violation issued (ECB, closed)
Construction
09/30/2019
Violation issued (ECB, closed)
Construction
09/23/2019
Violation issued (ECB, closed)
Construction
07/11/2019
Filed — Alteration
INSTALLATION OF TEMPORARY HEAVY DUTY SIDEWALK SHED AS PER PLANS. NO CHANGE IN USE, EGRESS OR OCCUPANCY.SIDEWALK SHED SHALL COMPLY WITH CHAPTER #33 OF THE NYC BUILDING CODE.LIVE LOAD 300PSF.
Q00192022-I1
07/11/2019
Permit issued — Sidewalk Shed
Q00192022-I1-SH
07/11/2019
Violation issued (ECB, closed)
Construction
07/11/2019
Violation issued (ECB, closed)
Construction
01/25/2019
Violation issued (ECB, closed)
Construction
09/10/2018
Violation issued (ECB, closed)
Construction
01/26/2018
Violation issued (ECB, closed)
Construction
03/09/2010
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWMechanical SystemsSigned-offDA HAI CONSTRUCTION INC03/20/2023
DOB NOWSprinklersSigned-offPETER PLUMBING ASSOC. INC.03/25/2022
DOB NOWSprinklersSigned-offPETER PLUMBING ASSOC. INC.03/26/2021
DOB NOWSupported ScaffoldSigned-offTRIERA CONTRACTING INC01/29/2021
DOB NOWSidewalk ShedSigned-offTRIERA CONTRACTING INC01/28/2021
DOB NOWSupported ScaffoldSigned-offTRIERA CONTRACTING INC02/24/2020
DOB NOWSidewalk ShedSigned-offTRIERA CONTRACTING INC07/11/2019
BIS—ISSUEDDA HAI CONSTRUCTION INC09/08/2022
BIS—ISSUEDDA HAI CONSTRUCTION INC06/24/2022
BISPLISSUEDPETER PLUMBING ASSOC. INC.03/08/2022
BIS—ISSUEDDA HAI CONSTRUCTION INC10/26/2021
BIS—ISSUEDDA HAI CONSTRUCTION INC06/18/2021
BISEQISSUEDDA HAI CONSTRUCTION INC06/18/2021
BISPLISSUEDPETER PLUMBING ASSOC. INC.02/16/2021
BISEQISSUEDTRIERA CONTRACTING INC01/21/2021
BIS—ISSUEDDA HAI CONSTRUCTION INC09/18/2020
BISEQISSUEDDA HAI CONSTRUCTION INC07/01/2020
BIS—ISSUEDDA HAI CONSTRUCTION INC07/01/2020
BIS—ISSUEDDA HAI CONSTRUCTION INC01/22/2020
BISEQISSUEDDA HAI CONSTRUCTION INC04/05/2019
BISOTISSUEDDA HAI CONSTRUCTION INC08/09/2018
BIS—ISSUEDDA HAI CONSTRUCTION INC08/01/2018
BISOTISSUEDDA HAI CONSTRUCTION INC05/22/2018
BIS—ISSUEDDA HAI CONSTRUCTION INC04/09/2018
BISEQISSUEDDA HAI CONSTRUCTION INC04/09/2018
BISEQISSUEDNEW AMERICAN CONSTRUCTION INC01/20/2017
BIS—ISSUEDSAL BRUSCA INC12/29/2016
BISEQISSUEDSAL BRUSCA INC12/29/2016
5 projects · most recent 01/29/2023
General Wiring
FiledStatusContractorScope
01/29/2023CompleteCHAMPION ELECTRIC INCGeneral Wiring
12/18/2022CompleteCHAMPION ELECTRIC INC11 meters, 11 new_meters
09/20/2022CompleteCHAMPION ELECTRIC INCGeneral Wiring
09/18/2021CompleteJAM ELECTRICAL CORP—
07/12/2019CompleteTOP SHELF ELECTRIC CORP—
▾Special Inspection Requirements (DOB NOW) — 12
DateRequirementInspectorRole
03/13/2023HVAC-R and service water heating equipmentGLEN LANGERenergy_progress
03/13/2023Maintenance informationGLEN LANGERenergy_progress
03/13/2023HVAC-R and service water heating system controlsGLEN LANGERenergy_progress
03/13/2023Shutoff dampersGLEN LANGERenergy_progress
03/13/2023Energy Code Compliance InspectionsGLEN LANGERprogress
03/13/2023HVAC-R and service water piping design and insulationGLEN LANGERenergy_progress
03/10/2023Mechanical SystemsGLEN LANGERspecial
03/10/2023FinalGLEN LANGERprogress
02/14/2021Sprinkler SystemsGLEN LANGERspecial
02/14/2021Fire-Resistant Penetrations and JointsGLEN LANGERspecial
02/02/2021FinalSunil Saigalprogress
02/13/2020FinalSunil Saigalprogress
▾Documents — 188 on file (BIS + DOB NOW)
▸Plans & Drawings6
▸DOB NOWPlans/Sketch - Sidewalk Shed2
08/28/2026Q00192022-I1Request digital key ↗
08/15/2026Q00192022-P1Request digital key ↗
▸DOB NOWPlans/Sketch - Supported Scaffold2
08/27/2026Q00320351-I1Request digital key ↗
08/15/2026Q00320351-P1Request digital key ↗
▸DOB NOWPlans/Sketch - Sprinkler1
08/27/2026Q00470288-I1Request digital key ↗
▸DOB NOWPlans/Sketch1
08/25/2026Q00842281-I1Request digital key ↗
▸Applications & Permits42
▸BISPLAN / WORK APPROVAL APPLICATION24
06/14/2023440377771Open ↗
04/26/2023421244040Open ↗
09/28/2022421310735Open ↗
Showing 3 of 24 on file for this type
▸BISWORK PERMIT APPLICATION15
03/29/2022421244040Open ↗
01/21/2021440662347Open ↗
02/03/2020421244040Open ↗
Showing 3 of 15 on file for this type
▸BISBPP-5 - Authorization to the Department of Transportation2
05/02/2022421310735Open ↗
04/14/2016421310735Open ↗
▸BISCERTIFICATE OF OCCUPANCY: APPLICATION1
09/28/2021421244040Open ↗
▸Zoning, Tax Lot & Property Records4
▸BISZONING DIAGRAM2
03/26/2019421244040Open ↗
07/25/2016421244040Open ↗
▸BISVERIFY TAX LOT1
08/15/2022421244040Open ↗
▸BISCO OBJ: VERIFY ADDRESS-TOPO STAMP1
01/20/2023421244040Open ↗
▸Seals & Professional Certifications29
▸BISTECHNICAL REPORT: RESPONSIBILITY/CERTIFICATION6
04/13/2018421244040Open ↗
04/11/2018421244040Open ↗
07/20/2016421244040Open ↗
Showing 3 of 6 on file for this type
▸DOB NOWDPL-1: Design Professional Seal & Signature6
08/28/2026Q00192022-P1Open ↗
08/28/2026Q00192022-I1Open ↗
08/27/2026Q00320351-I1Open ↗
Showing 3 of 6 on file for this type
▸BISPROFESSIONAL CERTIFICATION STATEMENT4
01/18/2021440662347Open ↗
05/14/2018440478519Open ↗
01/17/2017440377771Open ↗
Showing 3 of 4 on file for this type
▸DOB NOWProgress Inspector Seal & Signature4
09/27/2026Q00320351-I1Open ↗
08/28/2026Q00842281-I1Open ↗
08/28/2026Q00842281-I1Open ↗
Showing 3 of 4 on file for this type
▸BISREQUIRED ITEMS CHECKLIST FOR PROFESSIONAL CERTIFICATION3
01/18/2021440662347Open ↗
05/14/2018440478519Open ↗
01/17/2017440377771Open ↗
▸BISTECHNICAL REPORT STATEMENT OF RESPONSIBILITY3
01/18/2021440662347Open ↗
05/14/2018440478519Open ↗
01/17/2017440377771Open ↗
▸DOB NOWSpecial Inspector Seal & Signature2
09/01/2026Q00470288-I1Open ↗
08/28/2026Q00842281-I1Open ↗
▸BISPROFESSIONAL CERTIFIED CHECKLIST1
12/29/2015421248386Open ↗
▸Trade Schedules & Equipment11
▸BISSCHEDULE B - PLUMBING5
07/20/2022421244040Open ↗
07/14/2022421244040Open ↗
03/29/2022421244040Open ↗
Showing 3 of 5 on file for this type
▸BISSCHEDULE B - PLUMBING/SPRINKLER/STANDPIPE3
03/26/2019421244040Open ↗
01/29/2019421244040Open ↗
12/12/2015421244040Open ↗
▸BISELECTRIC CUT-OFF1
01/03/2017421255288Open ↗
▸BISSEWER CUT-OFF1
01/03/2017421255288Open ↗
▸BISDETECTOR:SMOKE-CERT. OF INSTALLATION1
05/08/2023421244040Open ↗
▸Safety & Tenant Protection8
▸BISSTREET TREE SIGNOFF2
02/17/2023421244040Open ↗
01/20/2023421310735Open ↗
▸BISSTREET TREE CHECKLIST2
04/14/2016421310735Open ↗
12/12/2015421244040Open ↗
▸BISSTREET TREES SITE PLAN2
01/20/2023421310735Open ↗
07/20/2016421244040Open ↗
▸BISEXCAVATION - SHEETING, SHORING, AND BRACING1
10/19/2022440478519Open ↗
▸BISEXCAVATION OR DEMOLITION: 5-DAY NOTICE1
01/03/2017421255288Open ↗
▸Environmental & Asbestos2
▸BISASBESTOS: CERTIFICATION (DEP ACP5)1
01/03/2017421255288Open ↗
▸BISRODENT CONTROL1
01/03/2017421255288Open ↗
▸Energy Compliance8
▸BISTECHNICAL REPORT: ENERGY CODE PROGRESS INSPS4
04/13/2018421244040Open ↗
04/13/2018421244040Open ↗
12/30/2015421248386Open ↗
Showing 3 of 4 on file for this type
▸BISTECHNICAL REPORT: ENERGY CODE - RESPONSIBILITY2
08/15/2022421244040Open ↗
10/07/2020421244040Open ↗
▸BISLIGHTING IN DWELLING UNITS1
03/13/2023421244040Open ↗
▸BISAS-BUILT ENERGY ANALYSIS (EN2)1
08/15/2022421244040Open ↗
▸Inspections & Test Reports21
▸BISTECHNICAL REPORT: RESPONSIBILITY6
08/15/2022421244040Open ↗
01/21/2021440662347Open ↗
01/19/2021440662347Open ↗
Showing 3 of 6 on file for this type
▸BISTECHNICAL REPORT: CONCRETE/TEST CYLINDER4
07/19/2019421244040Open ↗
07/16/2019421244040Open ↗
04/13/2018421244040Open ↗
Showing 3 of 4 on file for this type
▸BISTECHNICAL REPORT: CONCRETE DESIGN MIX3
07/16/2019421244040Open ↗
04/13/2018421244040Open ↗
12/30/2015421248386Open ↗
▸BISTECHNICAL REPORT: SOIL INSPECTION2
05/16/2018440478519Open ↗
04/13/2018421244040Open ↗
▸BISDEMOLITION (DM) JOB SIGNOFF1
02/13/2023421244040Open ↗
▸BISTR2: CONCRETE FIELD TESTING TECHNICAL REPORT1
04/17/2023421244040Open ↗
▸BISSUBSURFACE / SOILS INVESTIGATION (BORINGS/TEST PITS)1
03/21/2023421244040Open ↗
▸BIS* EXIT SIGNS1
08/15/2022421244040Open ↗
▸BISSOIL REPORT1
07/19/2019421244040Open ↗
▸BISSOIL PERC. TEST-PVT ON-SITE STORM WATER DRAINAGE DISPOSAL SYS & DET. FACL.1
03/01/2023421244040Open ↗
▸Approvals, Objections & Sign-offs21
▸BISLETTERS - SUPPORTING DOCUMENTATION5
03/29/2022421244040Open ↗
01/03/2017421255288Open ↗
11/17/2016421255288Open ↗
Showing 3 of 5 on file for this type
▸BISFINAL4
01/26/2023440377771Open ↗
01/26/2023440377771Open ↗
10/19/2022440478519Open ↗
Showing 3 of 4 on file for this type
▸BISADMINISTRATIVE OBJECTIONS4
04/14/2016421310735Open ↗
01/20/2016421255288Open ↗
12/29/2015421248386Open ↗
Showing 3 of 4 on file for this type
▸BISCERTIFICATE OF OCCUPANCY/LOC: REQUEST3
03/17/2023440377771Open ↗
10/20/2022440478519Open ↗
10/03/2022440662347Open ↗
▸BISSCHEDULE A - OCCUPANCY / USE3
04/26/2023421244040Open ↗
03/24/2022421244040Open ↗
12/12/2015421244040Open ↗
▸BISBPP-8 - Request Items for Builders Pavement Plan Signoff1
02/07/2023421310735Open ↗
▸BISTAP LETTER - DOM SVC : DEP-DOM1
01/03/2017421255288Open ↗
▸Cost, Insurance & Ownership10
▸BISPROJECT-SPECIFIC GL INSURANCE6
03/29/2022421244040Open ↗
02/03/2020421244040Open ↗
07/25/2019421244040Open ↗
Showing 3 of 6 on file for this type
▸BISCOST AFFIDAVIT2
05/14/2018440478519Open ↗
12/29/2015421248386Open ↗
▸BISCOST AFFIDAVIT (FINAL): PW31
10/19/2022440478519Open ↗
▸BISAcord 25 (Acord Certificate of Liability Insurance)1
01/03/2017421255288Open ↗
▸Filing & Intake Forms20
▸BISADDITIONAL INFORMATION8
03/29/2023421244040Open ↗
10/07/2022421310735Open ↗
10/07/2020421244040Open ↗
Showing 3 of 8 on file for this type
▸BISEFILING COVER SHEET4
04/14/2016421310735Open ↗
01/20/2016421255288Open ↗
12/29/2015421248386Open ↗
Showing 3 of 4 on file for this type
▸BISBOROUGH INTAKE FORM3
03/29/2022421244040Open ↗
11/14/2018421244040Open ↗
05/17/2018421244040Open ↗
▸BISEFILING JOB APPLICATION COVER SHEET3
01/18/2021440662347Open ↗
05/14/2018440478519Open ↗
01/17/2017440377771Open ↗
▸BISSRO INTAKE FORM(SRO1)1
01/03/2017421255288Open ↗
▸BISBPP: CHECKLIST IN LIEU OF PLANS-ALT31
04/14/2016421310735Open ↗
▸Other Documents6
▸BISPLOT DIAGRAM2
08/15/2022421244040Open ↗
12/12/2015421244040Open ↗
▸BISBPP - SUPPORTING DOCUMENTATION1
01/03/2017421255288Open ↗
▸BISUNDERPINNING1
10/19/2022440478519Open ↗
▸BISPRELIMINARY1
10/19/2022440478519Open ↗
▸BISSITE CONNECTION:DEP1
09/01/2016421244040Open ↗