← Back
BuildNYC
Elevator apt, semi-fireproof without stores
27-16 NEWTOWN AVENUE
QUEENS · BIN 4006880
💬 Discuss this project
1940Year Built
4Stories
D1Building Class
R6AZoning
5,223 sfGross Floor Area
8Units
Rent Stabilized0 Active Violations
Elevator apt, semi-fireproof without stores · Owner of record: 2716 Newtown · 1,932 sf lot · 2.7 FAR built · Flood zone X
Locations of Work
ArchitectureStructuralMechanicalPlumbingFire ProtectionEquipmentCivilGeneral
Names shown beside floors are taken automatically from the text of filed documents and may be incomplete or wrong.
RoofSprinkler system installation14p · 4 filings · 20 docs
BulkheadSprinkler system installation4p · 2 filings · 20 docs
Penthouse24p · 1 filing · 20 docs
Floor 4Sprinkler system installation37p · 4 filings · 20 docs
Floor 3Sprinkler system installation35p · 4 filings · 20 docs
Floor 2Sprinkler system installation36p · 4 filings · 20 docs
Floor 1Sprinkler system installation36p · 4 filings · 20 docs
Cellar1 filing · 20 docs
Site & exteriorHeavy Duty Sidewalk Shed Installation5p · 2 filings · 8 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
437 Irving Ave807/08/2026
2716 Newtown103/22/2026
▾Sales History (ACRIS)
DatePriceUnitSeller → Buyer$/sf
11/06/2020$1.3M—Private party → 2716 NEWTOWN LLC$249/sf building
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
LWL Associates1406/21/2022
Enthink Engineers201/06/2022
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
Prime Zone Building Consulting1403/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
J S Remodeling NYGeneral Contractor807/08/2026
J S Remodeling NYScaffold603/21/2026
J S Remodeling NYspecialty_contractor303/21/2026
Phoenix Sutton STRScaffold203/21/2026
EH Plumbing & HeatingPlumbing107/08/2026
Jem Fire PreventionFire Protection107/08/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
Yan Engineering78511306/21/2022
Building Lifecycle
11/29/2023
§27-2107 ADM code owner failed to file a valid registration statement with the department as required by ADM code §27-2097 and is therefore subject…
HPD violation · closed
04/27/2023
Permit expired, never signed off — General Construction
The city's record still shows this permit as issued, with no sign-off on its filing
Q00514861-I1-GC
03/04/2023
Signed off — ALT-CO - New Building with Existing Elements to Remain
CONVERT EXISTING TWO (2) DWELLING UNITS TO EIGHT (8) DWELLING UNITS. PROPOSED NEW HORIZONTAL ENLARGEMENT AT FRONT AND VERTICAL ENLARGEMENT ON EXISTING THREE (3)-STORY BUILDING TO FOUR (4)-STORY WITH PENTHOUSE. OBTAIN NEW CERTIFICATE OF OCCUPANCY
Q00514861-S2
12/08/2022
Signed off — ALT-CO - New Building with Existing Elements to Remain
CONVERT EXISTING TWO (2) DWELLING UNITS TO EIGHT (8) DWELLING UNITS. PROPOSED NEW HORIZONTAL ENLARGEMENT AT FRONT AND VERTICAL ENLARGEMENT ON EXISTING THREE (3)-STORY BUILDING TO FOUR (4)-STORY WITH PENTHOUSE. OBTAIN NEW CERTIFICATE OF OCCUPANCY
Q00514861-S1
09/06/2022
Inspection — Pass-Final CND-Occupancy Inspection
Pass
View inspection ↗
88 history events on file for this building. Sign in free to see the full history. Sign in · Create account
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWConstruction FenceSigned-offJ S Remodeling NY06/09/2022
DOB NOWGeneral ConstructionPermit IssuedJ S Remodeling NY06/09/2022
DOB NOWSprinklersSigned-offJem Fire Prevention02/28/2022
DOB NOWSidewalk ShedSigned-offPhoenix Sutton STR09/01/2021
DOB NOWEarth WorkSigned-offJ S Remodeling NY08/17/2021
DOB NOWMechanical SystemsSigned-offJ S Remodeling NY08/03/2021
DOB NOWStructuralSigned-offJ S Remodeling NY08/03/2021
DOB NOWPlumbingSigned-offEH Plumbing & Heating07/15/2021
DOB NOWGeneral ConstructionPermit IssuedJ S Remodeling NY07/08/2021
DOB NOWConstruction FenceSigned-offJ S Remodeling NY07/06/2021
2 projects · most recent 06/13/2022
General Wiring
FiledStatusContractorScope
06/13/2022CompleteKJK ElectricGeneral Wiring
08/25/2021CompleteElpo Electrical Contg—
1 project · most recent 06/21/2022
FiledStatusContractorScope
06/21/2022Permit IssuedJ S Remodeling NY—
▾Field Inspections (DOB CAP) — 9
DateTypeResultReport
09/06/2022Pass-Final CND-Occupancy InspectionPassView ↗
06/15/2022Pass-Final CND-Occupancy InspectionPassView ↗
06/09/2022Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic TestCertifiedView ↗
06/09/2022Certified Sprinkler - SP - RoughingCertifiedView ↗
05/26/2022Certified Sprinkler-SP-Fixtures-FinishCertifiedView ↗
03/21/2022Certified Storm Drainage-ST-Piping-RoughingCertifiedView ↗
03/21/2022Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
01/21/2022Certified Storm Drainage-ST-Piping-UndergroundCertifiedView ↗
01/21/2022Certified Water and Sanitary-WS-Sanitary Piping-UndergroundCertifiedView ↗
▾Special Inspection Requirements (DOB NOW) — 94
DateRequirementInspectorRole
06/21/2022Exterior lighting powerSHI YANenergy_progress
06/21/2022MeteringSHI YANenergy_progress
06/21/2022Maintenance informationSHI YANenergy_progress
06/21/2022Lighting controlsSHI YANenergy_progress
06/21/2022Air barrier - visual inspectionSHI YANenergy_progress
06/21/2022Air barrier — testing SHI YANenergy_progress
06/21/2022Fire-Resistant Penetrations and JointsSHI YANspecial
06/21/2022Private On-Site Storm Water Disposal Systems-, and Detention Facilities, InstallationSHI YANspecial
06/21/2022Energy Code Compliance InspectionsSHI YANprogress
06/21/2022Fire-Resistance Rated ConstructionSHI YANprogress
06/21/2022Insulation placement and R valuesSHI YANenergy_progress
06/21/2022Protection of exposed foundation insulationSHI YANenergy_progress
06/21/2022Lighting in dwelling unitsSHI YANenergy_progress
06/21/2022Fenestration air leakageSHI YANenergy_progress
06/21/2022Fenestration areasSHI YANenergy_progress
06/21/2022Fenestration and door U-factor and product ratingsSHI YANenergy_progress
06/21/2022Interior lighting powerSHI YANenergy_progress
06/21/2022Air barrier continuity plan testingSHI YANenergy_progress
06/14/2022Mechanical SystemsSHI YANspecial
06/14/2022Duct leakage testing, insulation and designSHI YANenergy_progress
06/14/2022HVAC-R and service water piping design and insulationSHI YANenergy_progress
06/14/2022HVAC-R and service water heating system controlsSHI YANenergy_progress
06/14/2022Maintenance informationSHI YANenergy_progress
06/14/2022HVAC-R and service water heating equipmentSHI YANenergy_progress
06/14/2022MeteringSHI YANenergy_progress
Latest 25 of 94.
128 filed documents on file for this building. Sign in free to see the full history. Sign in · Create account