← Back
BuildNYC
Three families
27-18 NEWTOWN AVENUE
QUEENS · BIN 4006904
💬 Discuss this project
1940Year Built
3Stories
C0Building Class
R6AZoning
2,520 sfGross Floor Area
3Units
Rent Stabilized0 Active Violations
Three families · 1,580 sf lot · 1.59 FAR built · Flood zone X
Locations of Work
ArchitectureGeneral
Names shown beside floors are taken automatically from the text of filed documents and may be incomplete or wrong.
Roof1 filing · 20 docs
Floor 41 filing · 20 docs
Floor 3
Floor 21 filing · 20 docs
Floor 11 filing · 20 docs
Filed — no permit issuedInterior and exterior renovation of residential building15p · 1 filing · 4 docs
▾Sales History (ACRIS)
DatePriceUnitSeller → Buyer$/sf
01/06/2026$1.7M—Private party → Private party$675/sf building
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
Diagrid Consultants1009/29/2026
Building Lifecycle
11/12/2026
Objection raised — Energy
10/26/2026
Objection raised — Structural
10/26/2026
Objection raised — Admin
10/26/2026
Objection raised — Scope
10/26/2026
Objection raised — Fire_Protection
63 history events on file for this building. Sign in free to see the full history. Sign in · Create account
Nothing on file for this building.
1 project · most recent 09/29/2026
Heating and Air Conditioning Systems Ventilation Systems
FiledStatusContractorScope
09/29/2026——Heating and Air Conditioning Systems, Ventilation Systems
1 project · most recent 09/29/2026
Sprinkler System
FiledStatusContractorScope
09/29/2026——Sprinkler System
1 project · most recent 09/29/2026
Storm Water/Sanitary
FiledStatusContractorScope
09/29/2026——Storm, Water/Sanitary
2 projects · most recent 09/29/2026
FiledStatusContractorScope
09/29/2026———
12/19/2025———
1 project · most recent 09/29/2026
Fence
FiledStatusContractorScope
09/29/2026——Fence
▾Special Inspection Requirements (DOB NOW) — 56
DateRequirementInspectorRole
09/12/2026HVAC-R and service water piping design and insulation—energy_progress
09/12/2026Duct leakage testing, insulation and design—energy_progress
09/12/2026Sprinkler Systems—special
09/12/2026HVAC-R and service water heating equipment—energy_progress
09/12/2026HVAC-R and service water heating system controls—energy_progress
09/12/2026HVAC-R and service water piping design and insulation—energy_progress
09/12/2026Maintenance information—energy_progress
09/12/2026Fire-Resistant Penetrations and Joints—special
09/12/2026HVAC-R and service water heating system controls—energy_progress
09/12/2026Ventilation and air distribution system—energy_progress
09/12/2026Shutoff dampers—energy_progress
09/12/2026Maintenance information—energy_progress
09/12/2026HVAC-R and service water heating equipment—energy_progress
09/12/2026Fire-Resistant Penetrations and Joints—special
09/12/2026Structural Stability – Alterations of existing buildings—special
09/12/2026Energy Code Compliance Inspections—progress
09/09/2026Final—progress
09/09/2026Mechanical Systems—special
08/26/2026Subgrade Inspections—special
08/26/2026Subsurface Investigations (Borings/Test Pits)—special
08/26/2026Concrete - Cast-In-Place—special
07/30/2026Structural Stability – Alterations of existing buildings—special
07/30/2026Structural Stability – Alterations of existing buildings—special
05/18/2026Final—progress
05/18/2026Footing and Foundation—progress
Latest 25 of 56.
37 filed documents on file for this building. Sign in free to see the full history. Sign in · Create account