← Back
Two family frame
27 77 STREET
BROOKLYN · BIN 3148581
💬 Discuss this project
1925Year Built
2.5Stories
B2Building Class
R4AZoning
2,850 sfGross Floor Area
2Units
Two family frame · 3,583 sf lot · 0.8 FAR built · Flood zone X
Locations of Work
ArchitectureMechanicalPlumbingGeneral
Floor 29p · 1 filing · 20 docs
Floor 18p · 1 filing · 20 docs
Cellar9p · 1 filing · 20 docs
▾Sales History (ACRIS)
DatePriceUnitSeller → Buyer$/sf
09/15/2021$1.6M—Private party → Private party$579/sf building
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
MIMI HO910/31/2023
J&R DESIGN AND INSPECTION CORP.306/22/2022
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
HIGH QUALITY 338603/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
HIGH QUALITY CONSTRUCTIONGeneral Contractor1007/08/2026
AMERICAN STANDARD P&H CORORP.Plumbing107/08/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
STEVEN KUO4979510/31/2023
J&R DESIGN AND INSPECTION6637206/22/2022
Building Lifecycle
All (63)Filed (12)Permit Issued (7)Signed Off (3)Inspection (7)Objection (4)Special Inspection (30)
12/14/2023
Signed off — Alteration
JOB IS FILED FOR REPLACING EXTERIOR WALL FACADE AND BRICK FENCE AT FRONT YARD. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
B00661488-I1
12/13/2023
Signed off — Alteration
B00666664-I1
11/08/2023
Special inspection requirement — HVAC-R and service water piping design and insulation
FENG-BAO LIN
11/08/2023
Special inspection requirement — Structural Stability – Alterations of existing buildings
FENG-BAO LIN
11/08/2023
Special inspection requirement — Fire-Resistant Penetrations and Joints
FENG-BAO LIN
11/08/2023
Special inspection requirement — Mechanical Systems
FENG-BAO LIN
11/08/2023
Special inspection requirement — Energy Code Compliance Inspections
FENG-BAO LIN
11/08/2023
Special inspection requirement — Final
FENG-BAO LIN
11/08/2023
Special inspection requirement — HVAC-R and service water heating system controls
FENG-BAO LIN
11/08/2023
Special inspection requirement — Air barrier - visual inspection
FENG-BAO LIN
11/08/2023
Special inspection requirement — Fenestration areas
FENG-BAO LIN
11/08/2023
Special inspection requirement — HVAC-R and service water heating equipment
FENG-BAO LIN
11/08/2023
Special inspection requirement — Fenestration air leakage
FENG-BAO LIN
11/08/2023
Special inspection requirement — Fenestration and door U-factor and product ratings
FENG-BAO LIN
11/08/2023
Special inspection requirement — Insulation placement and R values
FENG-BAO LIN
10/31/2023
Filed — Alteration CO
PROPOSED INTERIOR RENOVATION AT CELLAR THRU ATTIC. PLUMBING, MECHANICAL & PARTITION WORK AS PER PLAN.
B00647470-A1
10/25/2023
Special inspection requirement — Fire-Resistant Penetrations and Joints
FENG-BAO LIN
10/25/2023
Special inspection requirement — Mechanical Systems
FENG-BAO LIN
10/25/2023
Special inspection requirement — Structural Stability – Alterations of existing buildings
FENG-BAO LIN
10/25/2023
Special inspection requirement — Energy Code Compliance Inspections
FENG-BAO LIN
10/25/2023
Special inspection requirement — Final
FENG-BAO LIN
10/25/2023
Special inspection requirement — Fenestration areas
FENG-BAO LIN
10/25/2023
Special inspection requirement — Fenestration and door U-factor and product ratings
FENG-BAO LIN
10/25/2023
Special inspection requirement — Air barrier - visual inspection
FENG-BAO LIN
10/25/2023
Special inspection requirement — HVAC-R and service water heating equipment
FENG-BAO LIN
10/25/2023
Special inspection requirement — HVAC-R and service water heating system controls
FENG-BAO LIN
10/25/2023
Special inspection requirement — Fenestration air leakage
FENG-BAO LIN
10/25/2023
Special inspection requirement — HVAC-R and service water piping design and insulation
FENG-BAO LIN
10/25/2023
Special inspection requirement — Insulation placement and R values
FENG-BAO LIN
09/28/2023
Permit issued — Mechanical Systems
B00647470-I1-GC
09/27/2023
Signed off — Alteration CO
PROPOSED INTERIOR RENOVATION AT CELLAR THRU ATTIC. PLUMBING, MECHANICAL & PARTITION WORK AS PER PLAN.
B00647470-S1
08/21/2023
Inspection — Pass-Final CND-Occupancy Inspection
Pass
View inspection ↗
08/11/2023
Filed — Alteration CO
PROPOSED INTERIOR RENOVATION AT CELLAR THRU ATTIC. PLUMBING, MECHANICAL & PARTITION WORK AS PER PLAN.
B00647470-P9
08/01/2023
Filed — Alteration CO
PROPOSED INTERIOR RENOVATION AT CELLAR THRU ATTIC. PLUMBING, MECHANICAL & PARTITION WORK AS PER PLAN.
B00647470-P8
08/01/2023
Permit issued — General Construction
B00661488-I1-GC
06/15/2023
Filed — Alteration CO
PROPOSED INTERIOR RENOVATION AT CELLAR THRU ATTIC. PLUMBING, MECHANICAL & PARTITION WORK AS PER PLAN.
B00647470-P6
06/09/2023
Inspection — Certified Water and Sanitary-WS-Fixtures-Finish
Certified
View inspection ↗
06/08/2023
Inspection — Pass-Final PL - Up to 3 Requested Floors
Pass
View inspection ↗
02/03/2023
Filed — Alteration CO
PROPOSED INTERIOR RENOVATION AT CELLAR THRU ATTIC. PLUMBING, MECHANICAL & PARTITION WORK AS PER PLAN.
B00647470-P5
02/03/2023
Special inspection requirement — HVAC-R and service water heating equipment
FENG-BAO LIN
02/03/2023
Special inspection requirement — Mechanical Systems
FENG-BAO LIN
02/03/2023
Special inspection requirement — Structural Stability – Alterations of existing buildings
FENG-BAO LIN
02/03/2023
Special inspection requirement — Energy Code Compliance Inspections
FENG-BAO LIN
09/08/2022
Inspection — Certified Gas-Gas-Piping-Roughing
Certified
View inspection ↗
09/08/2022
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Roughing
Certified
View inspection ↗
07/07/2022
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Underground
Certified
View inspection ↗
06/22/2022
Filed — Alteration
JOB IS FILED FOR REPLACING EXTERIOR WALL FACADE AND BRICK FENCE AT FRONT YARD. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
B00661488-P1
05/27/2022
Filed — Alteration CO
PROPOSED INTERIOR RENOVATION AT CELLAR THRU ATTIC. PLUMBING, MECHANICAL & PARTITION WORK AS PER PLAN.
B00647470-P2
03/21/2022
Objection resolved — Addressed
03/21/2022
Objection resolved — Addressed
03/15/2022
Objection raised — Fire_Protection
03/15/2022
Objection raised — Other
03/11/2022
Filed — Alteration CO
PROPOSED INTERIOR RENOVATION AT CELLAR THRU ATTIC. PLUMBING, MECHANICAL & PARTITION WORK AS PER PLAN.
B00647470-P1
03/07/2022
Inspection — Pass-Final Boiler Equipment Inspection
Pass
View inspection ↗
02/09/2022
Permit issued — Plumbing
B00647470-S1-PL
02/07/2022
Permit issued — Mechanical Systems
B00647470-I1-GC
02/07/2022
Permit issued — General Construction
B00647470-I1-MS
01/25/2022
Permit issued — Construction Fence
B00666664-I1-FN
01/21/2022
Filed — Alteration
B00666664-I1
01/21/2022
Permit issued — General Construction
B00661488-I1-GC
Latest 60 of 63 events.
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWMechanical SystemsPermit IssuedHIGH QUALITY CONSTRUCTION09/28/2023
DOB NOWGeneral ConstructionSigned-offHIGH QUALITY CONSTRUCTION08/01/2023
DOB NOWPlumbingSigned-offAMERICAN STANDARD P&H CORORP.02/09/2022
DOB NOWMechanical SystemsPermit IssuedHIGH QUALITY CONSTRUCTION02/07/2022
DOB NOWGeneral ConstructionSigned-offHIGH QUALITY CONSTRUCTION02/07/2022
DOB NOWConstruction FenceSigned-offHIGH QUALITY CONSTRUCTION01/25/2022
DOB NOWGeneral ConstructionSigned-offHIGH QUALITY CONSTRUCTION01/21/2022
1 project · most recent 10/31/2023
Refrigeration Systems
FiledStatusContractorScopeMake / Model / Capacity
10/31/2023Permit IssuedHIGH QUALITY CONSTRUCTIONRefrigeration Systems
Refrigeration
Mitsubishi Electric MXZ-5C42NAHZ2 48,000 BTU · Heat Pump Outdoor ×6
MXZ-3C30NAHZ2 30,000 BTU · Heat Pump Outdoor ×5
NTXMPH42A152AA 42,000 BTU · Condensing Unit ×3
MXZ-8C48NAHZ2 48,000 BTU · Heat Pump Outdoor ×6
1 project · most recent 10/31/2023
Gas Water/Sanitary
FiledStatusContractorScope
10/31/2023Signed-offAMERICAN STANDARD P&H CORGas, Water/Sanitary
2 projects · most recent 06/05/2025
General Wiring
FiledStatusContractorScope
06/05/2025CompleteDAVEN ELECTRIC CORPGeneral Wiring
07/28/2023CompleteKJK ELECTRIC INCGeneral Wiring
▾Field Inspections (DOB CAP) — 7
DateTypeResultReport
08/21/2023Pass-Final CND-Occupancy InspectionPassView ↗
06/09/2023Certified Water and Sanitary-WS-Fixtures-FinishCertifiedView ↗
06/08/2023Pass-Final PL - Up to 3 Requested FloorsPassView ↗
09/08/2022Certified Gas-Gas-Piping-RoughingCertifiedView ↗
09/08/2022Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
07/07/2022Certified Water and Sanitary-WS-Sanitary Piping-UndergroundCertifiedView ↗
03/07/2022Pass-Final Boiler Equipment InspectionPassView ↗
▾Special Inspection Requirements (DOB NOW) — 54
DateRequirementInspectorRole
11/08/2023HVAC-R and service water piping design and insulationFENG-BAO LINenergy_progress
11/08/2023Structural Stability – Alterations of existing buildingsFENG-BAO LINspecial
11/08/2023Fire-Resistant Penetrations and JointsFENG-BAO LINspecial
11/08/2023Mechanical SystemsFENG-BAO LINspecial
11/08/2023Energy Code Compliance InspectionsFENG-BAO LINprogress
11/08/2023FinalFENG-BAO LINprogress
11/08/2023HVAC-R and service water heating system controlsFENG-BAO LINenergy_progress
11/08/2023Air barrier - visual inspectionFENG-BAO LINenergy_progress
11/08/2023Fenestration areasFENG-BAO LINenergy_progress
11/08/2023HVAC-R and service water heating equipmentFENG-BAO LINenergy_progress
11/08/2023Fenestration air leakageFENG-BAO LINenergy_progress
11/08/2023Fenestration and door U-factor and product ratingsFENG-BAO LINenergy_progress
11/08/2023Insulation placement and R valuesFENG-BAO LINenergy_progress
10/25/2023Fire-Resistant Penetrations and JointsFENG-BAO LINspecial
10/25/2023Mechanical SystemsFENG-BAO LINspecial
10/25/2023Structural Stability – Alterations of existing buildingsFENG-BAO LINspecial
10/25/2023Energy Code Compliance InspectionsFENG-BAO LINprogress
10/25/2023FinalFENG-BAO LINprogress
10/25/2023Fenestration areasFENG-BAO LINenergy_progress
10/25/2023Fenestration and door U-factor and product ratingsFENG-BAO LINenergy_progress
10/25/2023Air barrier - visual inspectionFENG-BAO LINenergy_progress
10/25/2023HVAC-R and service water heating equipmentFENG-BAO LINenergy_progress
10/25/2023HVAC-R and service water heating system controlsFENG-BAO LINenergy_progress
10/25/2023Fenestration air leakageFENG-BAO LINenergy_progress
10/25/2023HVAC-R and service water piping design and insulationFENG-BAO LINenergy_progress
Latest 25 of 54.
▾Documents — 100 on file (BIS + DOB NOW)
▸Plans & Drawings12
▸DOB NOWPlans/Sketch12
08/31/2026B00661488-I1Request digital key ↗
08/31/2026B00661488-P1Request digital key ↗
08/31/2026B00666664-I1Request digital key ↗
Showing 3 of 12 on file for this type
▸Zoning, Tax Lot & Property Records2
▸DOB NOWRestrictive Declaration/Easement 12
08/13/2026B00647470-P9Open ↗
08/13/2026B00647470-S1Open ↗
▸Seals & Professional Certifications66
▸DOB NOWProgress Inspector Seal & Signature41
08/26/2026B00647470-I1Open ↗
08/26/2026B00647470-I1Open ↗
08/26/2026B00647470-I1Open ↗
Showing 3 of 41 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature13
08/26/2026B00647470-I1Open ↗
08/26/2026B00647470-I1Open ↗
08/26/2026B00647470-I1Open ↗
Showing 3 of 13 on file for this type
▸DOB NOWDPL-1: Design Professional Seal & Signature12
08/31/2026B00666664-I1Open ↗
08/26/2026B00647470-P5Open ↗
08/26/2026B00647470-P2Open ↗
Showing 3 of 12 on file for this type
▸Safety & Tenant Protection5
▸DOB NOWStreet Tree Checklist5
08/26/2026B00647470-P5Open ↗
08/26/2026B00647470-P2Open ↗
08/26/2026B00647470-I1Open ↗
Showing 3 of 5 on file for this type
▸Environmental & Asbestos9
▸DOB NOWDEP ACP-5: Asbestos Assessment Report9
08/26/2026B00647470-S1Open ↗
08/26/2026B00647470-P5Open ↗
08/26/2026B00647470-P2Open ↗
Showing 3 of 9 on file for this type
▸Energy Compliance1
▸DOB NOWEN2: As Built Energy Analysis1
08/13/2026B00647470-I1Open ↗
▸Other Documents5
▸DOB NOWProperty Ownership Certification5
08/26/2026B00647470-P5Open ↗
08/26/2026B00647470-P2Open ↗
08/26/2026B00647470-I1Open ↗
Showing 3 of 5 on file for this type