← Back
BuildNYC
BROOKLYN
27 CANTON COURT
BROOKLYN · BIN 3249348
💬 Discuss this project
—Year Built
—Stories
—Building Class
—Zoning
—Gross Floor Area
—Units
3 Active Violations ▸FDNY Report ↗
Flood zone AE
Locations of Work
ArchitectureStructuralElectricalPlumbingCivilGeneral
Names shown beside floors are taken automatically from the text of filed documents and may be incomplete or wrong.
Permit Issued — active, not yet Signed-off
RoofNew plumbing fixtures in existing one familyUnder Construction4p · 2 filings · 20 docs
Floor 2New plumbing fixtures in existing one familyUnder Construction6p · 3 filings · 20 docs
Floor 1New plumbing fixtures in existing one familyUnder Construction6p · 3 filings · 20 docs
CellarEnlargement of existing single family homeUnder Construction1p · 1 filing · 20 docs
BasementNew plumbing fixtures in existing one familyUnder Construction3p · 2 filings · 20 docs
Site & exteriorEnlargement of existing single family homeUnder Construction13p · 1 filing · 20 docs
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
Adl Engineering608/27/2026
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
Dimo Engineering203/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
Peeps ServicesGeneral Contractor407/19/2026
Peeps ServicesScaffold107/17/2026
Capital Contracting P&HPlumbing108/06/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
AZ Professional Engineering766308/27/2026
Mumtaz Enterprises9459308/27/2026
Building Lifecycle
All (106)Filed (6)Permit Issued (6)Violation (3)Inspection (2)Objection (59)Special Inspection (30)
09/30/2026
Objection resolved — Resolved
09/29/2026
Objection raised — Other
08/27/2026
Filed — Alteration
Proposing herewith a new construction fence no change in use egress or occupancy
B01392089-P2
08/20/2026
Objection resolved — Resolved
08/20/2026
Special inspection requirement — Fenestration and door U-factor and product ratings
GEORGE GUTTMANN
08/20/2026
Special inspection requirement — Structural Steel - Details
VIJAY KUMAR
08/20/2026
Special inspection requirement — Lowest Floor Elevation
GEORGE GUTTMANN
08/20/2026
Special inspection requirement — Final
GEORGE GUTTMANN
08/20/2026
Special inspection requirement — Fire-Resistant Penetrations and Joints
Mumtaz Hussain
08/20/2026
Special inspection requirement — Air barrier - visual inspection
GEORGE GUTTMANN
08/20/2026
Special inspection requirement — Electric vehicle service equipment requirements
GEORGE GUTTMANN
08/20/2026
Special inspection requirement — HVAC-R and service water heating system controls
GEORGE GUTTMANN
08/20/2026
Special inspection requirement — Exterior lighting power
GEORGE GUTTMANN
08/20/2026
Special inspection requirement — Subgrade Inspections
VIJAY KUMAR
08/20/2026
Special inspection requirement — Fenestration areas
GEORGE GUTTMANN
08/20/2026
Special inspection requirement — Footing and Foundation
GEORGE GUTTMANN
08/20/2026
Special inspection requirement — Interior lighting power
GEORGE GUTTMANN
08/20/2026
Special inspection requirement — Structural Stability – Alterations of existing buildings
VIJAY KUMAR
08/20/2026
Special inspection requirement — Insulation placement and R values
GEORGE GUTTMANN
08/20/2026
Special inspection requirement — Fenestration air leakage
GEORGE GUTTMANN
08/20/2026
Special inspection requirement — Structural Steel - Welding
VIJAY KUMAR
08/20/2026
Special inspection requirement — Lighting in dwelling units
GEORGE GUTTMANN
08/13/2026
Inspection — Certified Storm Drainage-ST-Fixtures-Finish
Certified
View inspection ↗
08/13/2026
Objection raised — Scope
08/10/2026
Filed — Alteration
Proposing herewith a new construction fence no change in use egress or occupancy
B01392089-P1
08/10/2026
Special inspection requirement — Air barrier - visual inspection
GEORGE GUTTMANN
08/10/2026
Special inspection requirement — Exterior lighting power
GEORGE GUTTMANN
08/10/2026
Special inspection requirement — Footing and Foundation
GEORGE GUTTMANN
08/10/2026
Special inspection requirement — Lowest Floor Elevation
GEORGE GUTTMANN
08/10/2026
Special inspection requirement — HVAC-R and service water heating system controls
GEORGE GUTTMANN
08/10/2026
Special inspection requirement — Structural Steel - Welding
VIJAY KUMAR
08/10/2026
Special inspection requirement — Structural Steel - Details
VIJAY KUMAR
08/10/2026
Special inspection requirement — Subgrade Inspections
VIJAY KUMAR
08/10/2026
Special inspection requirement — Fire-Resistant Penetrations and Joints
Mumtaz Hussain
08/10/2026
Special inspection requirement — Structural Stability – Alterations of existing buildings
VIJAY KUMAR
08/10/2026
Special inspection requirement — Final
GEORGE GUTTMANN
08/10/2026
Special inspection requirement — Fenestration air leakage
GEORGE GUTTMANN
08/05/2026
Permit issued — Plumbing
B01427219-I1-PL
08/04/2026
Violation issued (ECB, open)
Unknown
08/04/2026
Violation issued (ECB, open)
Site Safety
08/04/2026
Violation issued (ECB, open)
Unknown
07/31/2026
Inspection — Certified Storm Drainage-ST-Piping-Underground
Certified
View inspection ↗
07/21/2026
Filed — Alteration
Proposing new plumbing fixtures in an existing one family home no change in use egress or occupancy
B01427219-I1
07/17/2026
Permit issued — Foundation
B01392089-I1-ST
07/17/2026
Permit issued — Earth Work
B01392089-I1-EA
07/17/2026
Permit issued — Foundation
B01392089-I1-FO
07/16/2026
Permit issued — Construction Fence
B01392089-S1-FN
07/16/2026
Permit issued — Earth Work
B01392089-I1-GC
07/02/2026
Filed — Alteration
Proposing herewith a new construction fence no change in use egress or occupancy
B01392089-S1
06/11/2026
Objection raised — Inspections
06/11/2026
Objection resolved — Addressed
06/10/2026
Objection raised — Other
06/10/2026
Objection resolved — Addressed
06/10/2026
Objection resolved — Addressed
06/10/2026
Objection resolved — Addressed
06/10/2026
Objection resolved — Addressed
06/10/2026
Objection resolved — Addressed
06/09/2026
Objection resolved — Addressed
06/08/2026
Objection raised — Inspections
06/08/2026
Objection raised — Scope
Latest 60 of 106 events.
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWPlumbingPermit IssuedCapital Contracting P&H08/05/2026
DOB NOWFoundationPermit IssuedPeeps Services07/17/2026
DOB NOWEarth WorkPermit IssuedPeeps Services07/17/2026
DOB NOWFoundationPermit IssuedPeeps Services07/17/2026
DOB NOWConstruction FencePermit IssuedPeeps Services07/16/2026
DOB NOWEarth WorkPermit IssuedPeeps Services07/16/2026
1 project · most recent 12/09/2025
Air Conditioning Systems
FiledStatusContractorScopeMake / Model / Capacity
12/09/2025——Air Conditioning Systems
Cooling
Fujitsu gcvduj9000btumne 63,000 BTU ×7
1 project · most recent 08/07/2026
General Wiring
FiledStatusContractorScope
08/07/2026Permit IssuedMer ElectricGeneral Wiring
2 projects · most recent 08/27/2026
Steel Wood
FiledStatusContractorScope
08/27/2026Permit IssuedPeeps ServicesSteel, Wood
12/09/2025——Steel
1 project · most recent 08/27/2026
Fence
FiledStatusContractorScope
08/27/2026Permit IssuedPeeps ServicesFence
▾Field Inspections (DOB CAP) — 2
DateTypeResultReport
08/13/2026Certified Storm Drainage-ST-Fixtures-FinishCertifiedView ↗
07/31/2026Certified Storm Drainage-ST-Piping-UndergroundCertifiedView ↗
▾Special Inspection Requirements (DOB NOW) — 74
DateRequirementInspectorRole
08/20/2026Insulation placement and R valuesGEORGE GUTTMANNenergy_progress
08/20/2026Air barrier - visual inspectionGEORGE GUTTMANNenergy_progress
08/20/2026Fire-Resistant Penetrations and JointsMumtaz Hussainspecial
08/20/2026Structural Stability – Alterations of existing buildingsVIJAY KUMARspecial
08/20/2026Structural Steel - DetailsVIJAY KUMARspecial
08/20/2026Structural Steel - WeldingVIJAY KUMARspecial
08/20/2026Subgrade InspectionsVIJAY KUMARspecial
08/20/2026FinalGEORGE GUTTMANNprogress
08/20/2026Footing and FoundationGEORGE GUTTMANNprogress
08/20/2026Lowest Floor ElevationGEORGE GUTTMANNprogress
08/20/2026HVAC-R and service water heating system controlsGEORGE GUTTMANNenergy_progress
08/20/2026Exterior lighting powerGEORGE GUTTMANNenergy_progress
08/20/2026Fenestration and door U-factor and product ratingsGEORGE GUTTMANNenergy_progress
08/20/2026Lighting in dwelling unitsGEORGE GUTTMANNenergy_progress
08/20/2026Electric vehicle service equipment requirementsGEORGE GUTTMANNenergy_progress
08/20/2026Fenestration air leakageGEORGE GUTTMANNenergy_progress
08/20/2026Fenestration areasGEORGE GUTTMANNenergy_progress
08/20/2026Interior lighting powerGEORGE GUTTMANNenergy_progress
08/10/2026Insulation placement and R valuesGEORGE GUTTMANNenergy_progress
08/10/2026Fenestration air leakageGEORGE GUTTMANNenergy_progress
08/10/2026HVAC-R and service water heating system controlsGEORGE GUTTMANNenergy_progress
08/10/2026Exterior lighting powerGEORGE GUTTMANNenergy_progress
08/10/2026Air barrier - visual inspectionGEORGE GUTTMANNenergy_progress
08/10/2026Lowest Floor ElevationGEORGE GUTTMANNprogress
08/10/2026Footing and FoundationGEORGE GUTTMANNprogress
Latest 25 of 74.
▾Documents — 86 on file (BIS + DOB NOW)
▸Plans & Drawings6
▸DOB NOWPlans/Sketch6
09/03/2026B01392089-P2Request digital key ↗
08/16/2026B01392089-P1Request digital key ↗
08/16/2026B01392089-S1Request digital key ↗
Showing 3 of 6 on file for this type
▸Zoning, Tax Lot & Property Records8
▸DOB NOWZD1: DOB Zoning Diagram5
09/03/2026B01392089-P2Open ↗
08/16/2026B01392089-P1Open ↗
08/15/2026B01318777-I1Open ↗
Showing 3 of 5 on file for this type
▸DOB NOWZoning Exhibit form (1-5)3
09/03/2026B01392089-P2Open ↗
08/16/2026B01392089-P1Open ↗
08/15/2026B01392089-I1Open ↗
▸Seals & Professional Certifications51
▸DOB NOWProgress Inspector Seal & Signature39
10/05/2026B01392089-P2Open ↗
10/05/2026B01392089-P2Open ↗
10/05/2026B01392089-P2Open ↗
Showing 3 of 39 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature6
10/05/2026B01392089-P2Open ↗
10/05/2026B01392089-P2Open ↗
10/01/2026B01392089-P1Open ↗
Showing 3 of 6 on file for this type
▸DOB NOWDPL-1: Design Professional Seal & Signature6
09/03/2026B01392089-P2Open ↗
08/16/2026B01392089-P1Open ↗
08/16/2026B01392089-I1Open ↗
Showing 3 of 6 on file for this type
▸Trade Schedules & Equipment1
▸DOB NOWDEP: Sewer Certification (Sanitary/Storm)1
08/13/2026B01318777-I1Open ↗
▸Environmental & Asbestos3
▸DOB NOWDEP ACP-5: Asbestos Assessment Report3
09/03/2026B01392089-P2Open ↗
08/16/2026B01392089-P1Open ↗
08/15/2026B01392089-I1Open ↗
▸Inspections & Test Reports2
▸DOB NOWGeotechnical Report (BC 1803.6)2
08/15/2026B01318777-I1Open ↗
08/15/2026B01392089-I1Open ↗
▸Approvals, Objections & Sign-offs1
▸DOB NOWDCLA Approval of Artwork1
08/16/2026B01392089-S1Open ↗
▸Other Documents14
▸DOB NOWSite Survey: Initial5
09/03/2026B01392089-P2Open ↗
08/16/2026B01392089-P1Open ↗
08/15/2026B01318777-I1Open ↗
Showing 3 of 5 on file for this type
▸DOB NOWLocal Law 92/94 of 2019 Sustainable Roof Zone4
09/03/2026B01392089-P2Open ↗
08/16/2026B01392089-P1Open ↗
08/15/2026B01318777-I1Open ↗
Showing 3 of 4 on file for this type
▸DOB NOWPlot Diagram4
09/03/2026B01392089-P2Open ↗
08/16/2026B01392089-P1Open ↗
08/15/2026B01318777-I1Open ↗
Showing 3 of 4 on file for this type
▸DOB NOWAdjoining Owners Notification1
08/15/2026B01392089-I1Open ↗