← Back
Two family frame
27 CAROL COURT
STATEN ISLAND · Annadale-Huguenot-Prince's Bay-Woodrow · BIN 5175238
💬 Discuss this project
1985Year Built
1Stories
B2Building Class
R3XZoning
2,747 sfGross Floor Area
2Units
Two family frame · 7,067 sf lot · 0.39 FAR built · Flood zone X
Locations of Work
ArchitectureStructuralMechanicalPlumbingFire ProtectionGeneral
Floor 229p · 4 filings · 20 docs
Floor 130p · 5 filings · 20 docs
Cellar24p · 4 filings · 20 docs
Site & exterior20p · 3 filings · 20 docs
Filed — no permit issued1 filing
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
THINK DESIGN ARCHITECTURE903/28/2024
DESIGN BUILD SI, INC.202/28/2022
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
A+ EXPEDITING INC.403/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
PORTO CONSTRUCTION,LLCGeneral Contractor903/21/2026
SUPERB CONSTRUCTION MGTGeneral Contractor603/21/2026
FINE MECHANICAL CORPPlumbing207/08/2026
J & F ELECL CONTNG INCElectrical103/22/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
A TECH ENGINEERING NYC, P6738803/28/2024
Building Lifecycle
All (69)Filed (10)Permit Issued (7)Signed Off (5)Inspection (11)Objection (6)Special Inspection (30)
04/11/2024
Signed off — New Building
Application is filed to build a 2 story 1 family residence
S00523966-I1
04/02/2024
Signed off — Alteration
Install associated plumbing work for new building
S00524123-I1
04/02/2024
Special inspection requirement — Protection of exposed foundation insulation
anthony santoro
04/02/2024
Special inspection requirement — Structural Steel - Details
anthony santoro
04/02/2024
Special inspection requirement — Footing and Foundation
anthony santoro
04/02/2024
Special inspection requirement — HVAC-R and service water piping design and insulation
anthony santoro
04/02/2024
Special inspection requirement — Lighting controls
anthony santoro
04/02/2024
Special inspection requirement — HVAC-R and service water heating equipment
anthony santoro
04/02/2024
Special inspection requirement — Subsurface Investigations (Borings/Test Pits)
anthony santoro
04/02/2024
Special inspection requirement — Final
anthony santoro
04/02/2024
Special inspection requirement — Electric vehicle service equipment requirements
anthony santoro
04/02/2024
Special inspection requirement — Maintenance information
anthony santoro
04/02/2024
Special inspection requirement — Insulation placement and R values
anthony santoro
04/02/2024
Special inspection requirement — Fenestration areas
anthony santoro
04/02/2024
Special inspection requirement — Lighting in dwelling units
anthony santoro
04/02/2024
Special inspection requirement — Concrete - Cast-In-Place
anthony santoro
04/02/2024
Special inspection requirement — Mechanical Systems
anthony santoro
04/02/2024
Special inspection requirement — Subgrade Inspections
anthony santoro
04/02/2024
Special inspection requirement — Excavations - Sheeting, Shoring, and Bracing
anthony santoro
04/02/2024
Special inspection requirement — Energy Code Compliance Inspections
anthony santoro
04/02/2024
Special inspection requirement — Fire-Resistance Rated Construction
anthony santoro
04/02/2024
Special inspection requirement — Fenestration air leakage
anthony santoro
04/02/2024
Special inspection requirement — Interior lighting power
anthony santoro
04/02/2024
Special inspection requirement — HVAC-R and service water heating system controls
anthony santoro
04/02/2024
Special inspection requirement — Fire-Resistant Penetrations and Joints
anthony santoro
04/02/2024
Special inspection requirement — Fenestration and door U-factor and product ratings
anthony santoro
04/02/2024
Special inspection requirement — Permanent certificate
anthony santoro
04/02/2024
Special inspection requirement — Air barrier - visual inspection
anthony santoro
03/28/2024
Filed — New Building
Application is filed to build a 2 story 1 family residence
S00523966-P6
03/26/2024
Special inspection requirement — Fenestration air leakage
anthony santoro
03/26/2024
Special inspection requirement — Subsurface Investigations (Borings/Test Pits)
anthony santoro
03/26/2024
Special inspection requirement — Electric vehicle service equipment requirements
anthony santoro
03/26/2024
Special inspection requirement — Concrete - Cast-In-Place
anthony santoro
02/29/2024
Signed off — Alteration
INSTALLATION OF AUTOMATIC WET SPRINKLER SYSTEM
S00601023-I1
02/20/2024
Signed off — Alteration
S00525694-I1
02/14/2024
Inspection — Pass-Final Curb Cut Non-Directive 14
Pass
View inspection ↗
01/31/2024
Permit issued — Curb Cut
S00525694-I1-CC
10/12/2023
Signed off — Alteration
Install Temporary Construction Fence
S00649795-I1
08/18/2023
Objection resolved — Addressed
08/16/2023
Objection raised — Scope
08/02/2023
Filed — New Building
Application is filed to build a 2 story 1 family residence
S00523966-P1
08/02/2023
Filed — Alteration
Install associated plumbing work for new building
S00524123-P3
07/24/2023
Inspection — Pass-Final CND-Occupancy Inspection
Pass
View inspection ↗
03/27/2023
Inspection — Pass-Final CND-Occupancy Inspection
Pass
View inspection ↗
03/16/2023
Inspection — Certified Water and Sanitary-WS-Fixtures-Finish
Certified
View inspection ↗
01/17/2023
Filed — Alteration
Install associated plumbing work for new building
S00524123-P2
01/03/2023
Filed — Alteration
Install associated plumbing work for new building
S00524123-P1
12/05/2022
Inspection — Certified Sprinkler (PL)-SP-Fixtures (PL)-Finish
Certified
View inspection ↗
11/30/2022
Inspection — Certified Sprinkler (PL)-Sprinkler-Hydro
Certified
View inspection ↗
09/21/2022
Permit issued — Construction Fence
S00649795-I1-FN
09/21/2022
Permit issued — Mechanical Systems
S00523966-I1-GC-CX
07/21/2022
Inspection — Pass-Final PL - Up to 3 Requested Floors
Pass
View inspection ↗
05/10/2022
Inspection — Certified Gas-Gas-Piping-Roughing
Certified
View inspection ↗
05/10/2022
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Roughing
Certified
View inspection ↗
05/03/2022
Permit issued — Plumbing
S00601023-I1-PL
04/05/2022
Inspection — Certified Storm Drainage-ST-Piping-Underground
Certified
View inspection ↗
03/25/2022
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Underground
Certified
View inspection ↗
03/21/2022
Permit issued — Plumbing
S90114702-I1-PL
03/01/2022
Objection raised — Inspections
03/01/2022
Objection resolved — Addressed
Latest 60 of 69 events.
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWCurb CutSigned-offPORTO CONSTRUCTION,LLC01/31/2024
DOB NOWConstruction FenceSigned-offPORTO CONSTRUCTION,LLC09/21/2022
DOB NOWMechanical SystemsPermit IssuedPORTO CONSTRUCTION,LLC09/21/2022
DOB NOWPlumbingSigned-offFINE MECHANICAL CORP05/03/2022
DOB NOWPlumbingSigned-offFINE MECHANICAL CORP03/21/2022
DOB NOWMechanical SystemsPermit IssuedSUPERB CONSTRUCTION MGT01/05/2022
DOB NOWConstruction FenceSigned-offSUPERB CONSTRUCTION MGT12/30/2021
1 project · most recent 03/28/2024
Ventilation Systems
FiledStatusContractorScopeMake / Model / Capacity
03/28/2024Permit IssuedPORTO CONSTRUCTION,LLCVentilation Systems
Ventilation
Trane TAM9A0C60V6IDAB 30,000 BTU · Fan Coil Indoor ×1
1 project · most recent 03/21/2022
General Wiring
FiledStatusContractorScope
03/21/2022CompleteJ & F ELECL CONTNG INCGeneral Wiring
1 project · most recent 03/28/2024
FiledStatusContractorScope
03/28/2024Permit IssuedPORTO CONSTRUCTION,LLC1 scope_items
▾Field Inspections (DOB CAP) — 11
DateTypeResultReport
02/14/2024Pass-Final Curb Cut Non-Directive 14PassView ↗
07/24/2023Pass-Final CND-Occupancy InspectionPassView ↗
03/27/2023Pass-Final CND-Occupancy InspectionPassView ↗
03/16/2023Certified Water and Sanitary-WS-Fixtures-FinishCertifiedView ↗
12/05/2022Certified Sprinkler (PL)-SP-Fixtures (PL)-FinishCertifiedView ↗
11/30/2022Certified Sprinkler (PL)-Sprinkler-HydroCertifiedView ↗
07/21/2022Pass-Final PL - Up to 3 Requested FloorsPassView ↗
05/10/2022Certified Gas-Gas-Piping-RoughingCertifiedView ↗
05/10/2022Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
04/05/2022Certified Storm Drainage-ST-Piping-UndergroundCertifiedView ↗
03/25/2022Certified Water and Sanitary-WS-Sanitary Piping-UndergroundCertifiedView ↗
▾Special Inspection Requirements (DOB NOW) — 77
DateRequirementInspectorRole
04/02/2024Lighting in dwelling unitsanthony santoroenergy_progress
04/02/2024HVAC-R and service water heating equipmentanthony santoroenergy_progress
04/02/2024Lighting controlsanthony santoroenergy_progress
04/02/2024Fenestration areasanthony santoroenergy_progress
04/02/2024Air barrier - visual inspectionanthony santoroenergy_progress
04/02/2024Permanent certificateanthony santoroenergy_progress
04/02/2024Insulation placement and R valuesanthony santoroenergy_progress
04/02/2024Fenestration and door U-factor and product ratingsanthony santoroenergy_progress
04/02/2024Protection of exposed foundation insulationanthony santoroenergy_progress
04/02/2024Concrete - Cast-In-Placeanthony santorospecial
04/02/2024Structural Steel - Detailsanthony santorospecial
04/02/2024Fire-Resistant Penetrations and Jointsanthony santorospecial
04/02/2024Mechanical Systemsanthony santorospecial
04/02/2024Subgrade Inspectionsanthony santorospecial
04/02/2024Subsurface Investigations (Borings/Test Pits)anthony santorospecial
04/02/2024Excavations - Sheeting, Shoring, and Bracinganthony santorospecial
04/02/2024Energy Code Compliance Inspectionsanthony santoroprogress
04/02/2024Finalanthony santoroprogress
04/02/2024Footing and Foundationanthony santoroprogress
04/02/2024Fire-Resistance Rated Constructionanthony santoroprogress
04/02/2024Fenestration air leakageanthony santoroenergy_progress
04/02/2024Electric vehicle service equipment requirementsanthony santoroenergy_progress
04/02/2024Interior lighting poweranthony santoroenergy_progress
04/02/2024HVAC-R and service water heating system controlsanthony santoroenergy_progress
04/02/2024Maintenance informationanthony santoroenergy_progress
Latest 25 of 77.
▾Documents — 85 on file (BIS + DOB NOW)
▸Plans & Drawings11
▸DOB NOWPlans/Sketch11
08/26/2026S00513691-I1Request digital key ↗
08/25/2026S00525694-I1Request digital key ↗
08/24/2026S00649795-I1Request digital key ↗
Showing 3 of 11 on file for this type
▸Applications & Permits2
▸BISBPP-5 - Authorization to the Department of Transportation1
09/09/2021540203037Open ↗
▸BISPLAN / WORK APPROVAL APPLICATION1
06/29/2021540203037Open ↗
▸Zoning, Tax Lot & Property Records8
▸DOB NOWZD1: DOB Zoning Diagram3
08/22/2026S00523966-I1Open ↗
08/15/2026S00523966-P1Open ↗
08/13/2026S00523966-P6Open ↗
▸DOB NOWZoning Exhibit form (1-5)3
08/22/2026S00523966-I1Open ↗
08/15/2026S00523966-P1Open ↗
08/13/2026S00523966-P6Open ↗
▸BISTAX LOT: TENTATIVE LOT NUMBER ISSUED1
09/09/2021540203037Open ↗
▸DOB NOWHouse Number Verification: TOPO Stamp1
08/22/2026S00523966-I1Open ↗
▸Seals & Professional Certifications33
▸DOB NOWProgress Inspector Seal & Signature12
09/13/2026S00523966-I1Open ↗
09/13/2026S00523966-I1Open ↗
09/13/2026S00523966-I1Open ↗
Showing 3 of 12 on file for this type
▸DOB NOWDPL-1: Design Professional Seal & Signature11
08/22/2026S00523966-P6Open ↗
08/22/2026S00523966-P1Open ↗
08/22/2026S00523966-I1Open ↗
Showing 3 of 11 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature8
09/13/2026S00523966-I1Open ↗
09/13/2026S00523966-I1Open ↗
09/01/2026S00524123-I1Open ↗
Showing 3 of 8 on file for this type
▸BISAPPLICANT OWNER SIGNATURE1
06/29/2021540203037Open ↗
▸BISTECHNICAL REPORT STATEMENT OF RESPONSIBILITY1
06/29/2021540203037Open ↗
▸Trade Schedules & Equipment4
▸DOB NOWDEP: Sewer Certification (Sanitary/Storm)3
08/22/2026S00523966-I1Open ↗
08/15/2026S00523966-P1Open ↗
08/13/2026S00523966-P6Open ↗
▸DOB NOWStandpipe Alarms Drawings1
08/22/2026S00523966-I1—
▸Safety & Tenant Protection7
▸DOB NOWStreet Tree Checklist3
08/22/2026S00523966-P6Open ↗
08/22/2026S00523966-I1Open ↗
08/15/2026S00523966-P1Open ↗
▸BISSTREET TREE CHECKLIST1
06/29/2021540203037Open ↗
▸DOB NOWParks Department Acknowledgment Letter for Street Trees Plan1
08/22/2026S00523966-I1Open ↗
▸DOB NOWStreet Trees Site Plan1
08/22/2026S00523966-I1Open ↗
▸DOB NOWStreet Tree Sign Off1
08/22/2026S00523966-I1Open ↗
▸Energy Compliance2
▸DOB NOWEN2: As Built Energy Analysis.2
08/22/2026S00523966-I1Open ↗
08/13/2026S00524123-I1Open ↗
▸Inspections & Test Reports6
▸DOB NOWSOIL REPORT3
08/22/2026S00523966-I1Open ↗
08/15/2026S00523966-P1Open ↗
08/13/2026S00523966-P6Open ↗
▸BISBPP-9 - Request for Builders Pavement Field Inspection1
06/29/2021540203037Open ↗
▸DOB NOWTR4 Test Report and Plot Diagram1
08/22/2026S00523966-I1Open ↗
▸DOB NOWTR4 Plot Diagram1
08/22/2026S00523966-I1Open ↗
▸Approvals, Objections & Sign-offs2
▸BISBPP-8 - Request Items for Builders Pavement Plan Signoff1
09/09/2021540203037Open ↗
▸BISNYS DEC FRESHWATER WETLANDS APPROVAL1
06/29/2021540203037Open ↗
▸Filing & Intake Forms1
▸BISEFILING JOB APPLICATION COVER SHEET1
06/29/2021540203037Open ↗
▸Other Documents9
▸DOB NOWSite Survey: Initial3
08/22/2026S00523966-I1Open ↗
08/15/2026S00523966-P1Open ↗
08/13/2026S00523966-P6Open ↗
▸DOB NOWLocal Law 92/94 of 2019 Sustainable Roof Zone3
08/22/2026S00523966-I1Open ↗
08/15/2026S00523966-P1Open ↗
08/13/2026S00523966-P6Open ↗
▸BISBPP: PHOTOS-SIGNED/SEALED BY APPLICANT1
09/09/2021540203037Open ↗
▸BISNYS DEC FRESHWATER WETLANDS MAP1
06/29/2021540203037Open ↗
▸DOB NOWFinal Survey1
08/22/2026S00523966-I1Open ↗