← Back
Two stories - detached, small or mid-size
27 METCALFE STREET
STATEN ISLAND · Tompkinsville-Stapleton-Clifton-Fox Hills · BIN 5016369
💬 Discuss this project
1910Year Built
2.5Stories
A1Building Class
R3AZoning
1,904 sfGross Floor Area
1Units
Rent Stabilized46 Open Violations ▸FDNY Report ↗
Two stories - detached, small or mid-size · 3,030 sf lot · 0.63 FAR built · Flood zone X
Locations of Work
ArchitecturePlumbing
Attic11p · 1 filing · 20 docs
Floor 215p · 1 filing · 20 docs
Floor 115p · 1 filing · 20 docs
Cellar15p · 1 filing · 20 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
INTEGRITY UV 168 INC1303/22/2026
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
HUAN DESIGN INC.401/16/2024
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
NY BUILDING ASSOCIATES INGeneral Contractor203/21/2026
AMERICAN STANDARD P&H CORORP.Plumbing107/08/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
HUAN DESIGN INC7669401/16/2024
Building Lifecycle
All (87)Filed (4)Permit Issued (2)Signed Off (2)Violation (60)Inspection (4)Special Inspection (15)
11/26/2025
Violation issued (HPD, open)
I
02/14/2024
Signed off — Alteration
FILE PLUMBING WORK OF 1-FAMILY BUILDING TO INSTALL NEW BOILER AND H.W.H., REPLACE PLUMBING FIXTURES, AND GAS APPLIANCE AS PER PLAN. IN CONJUNCTION WITH JOB APPLICATION # S00887010-I1. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
S00887010-I1
02/14/2024
Signed off — Alteration
FILE PLUMBING WORK OF 1-FAMILY BUILDING TO INSTALL NEW BOILER AND H.W.H., REPLACE PLUMBING FIXTURES, AND GAS APPLIANCE AS PER PLAN. IN CONJUNCTION WITH JOB APPLICATION # S00887010-I1. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
S00887010-S1
02/07/2024
Inspection — Certified Remove/Cap - work done in accordance with code
Certified
View inspection ↗
02/02/2024
Inspection — Pass-Final General Construction Non-Directive 14
Pass
View inspection ↗
01/17/2024
Special inspection requirement — HVAC-R and service water piping design and insulation
ZHENHUAN XU
01/17/2024
Special inspection requirement — Air barrier - visual inspection
ZHENHUAN XU
01/17/2024
Special inspection requirement — Fire-Resistant Penetrations and Joints
ZHENHUAN XU
01/17/2024
Special inspection requirement — Energy Code Compliance Inspections
ZHENHUAN XU
01/17/2024
Special inspection requirement — Fire-Resistant Penetrations and Joints
ZHENHUAN XU
01/17/2024
Special inspection requirement — Energy Code Compliance Inspections
ZHENHUAN XU
01/17/2024
Special inspection requirement — Final
ZHENHUAN XU
01/17/2024
Special inspection requirement — Fire-Resistance Rated Construction
ZHENHUAN XU
01/17/2024
Special inspection requirement — Interior lighting power
ZHENHUAN XU
01/17/2024
Special inspection requirement — Fenestration and door U-factor and product ratings
ZHENHUAN XU
01/17/2024
Special inspection requirement — Fenestration areas
ZHENHUAN XU
01/17/2024
Special inspection requirement — Fenestration air leakage
ZHENHUAN XU
01/16/2024
Filed — Alteration
FILE PLUMBING WORK OF 1-FAMILY BUILDING TO INSTALL NEW BOILER AND H.W.H., REPLACE PLUMBING FIXTURES, AND GAS APPLIANCE AS PER PLAN. IN CONJUNCTION WITH JOB APPLICATION # S00887010-I1. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
S00887010-P1
01/16/2024
Filed — Alteration
FILE PLUMBING WORK OF 1-FAMILY BUILDING TO INSTALL NEW BOILER AND H.W.H., REPLACE PLUMBING FIXTURES, AND GAS APPLIANCE AS PER PLAN. IN CONJUNCTION WITH JOB APPLICATION # S00887010-I1. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
S00887010-P2
01/02/2024
Inspection — Certified Water and Sanitary-WS-Fixtures-Finish
Certified
View inspection ↗
01/02/2024
Special inspection requirement — Energy Code Compliance Inspections
ZHENHUAN XU
01/02/2024
Special inspection requirement — HVAC-R and service water piping design and insulation
ZHENHUAN XU
01/02/2024
Special inspection requirement — Fire-Resistant Penetrations and Joints
ZHENHUAN XU
12/27/2023
Inspection — Pass-Final PL - Up to 3 Requested Floors
Pass
View inspection ↗
07/03/2023
Permit issued — General Construction
S00887010-I1-GC
07/03/2023
Permit issued — Plumbing
S00887010-S1-PL
06/29/2023
Filed — Alteration
FILE PLUMBING WORK OF 1-FAMILY BUILDING TO INSTALL NEW BOILER AND H.W.H., REPLACE PLUMBING FIXTURES, AND GAS APPLIANCE AS PER PLAN. IN CONJUNCTION WITH JOB APPLICATION # S00887010-I1. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
S00887010-I1
06/29/2023
Filed — Alteration
FILE PLUMBING WORK OF 1-FAMILY BUILDING TO INSTALL NEW BOILER AND H.W.H., REPLACE PLUMBING FIXTURES, AND GAS APPLIANCE AS PER PLAN. IN CONJUNCTION WITH JOB APPLICATION # S00887010-I1. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
S00887010-S1
01/23/2018
Violation issued (HPD, closed)
I
01/18/2018
Violation issued (HPD, closed)
C
01/09/2018
Violation issued (HPD, open)
I
01/03/2018
Violation issued (HPD, open)
C
01/03/2018
Violation issued (HPD, open)
C
01/03/2018
Violation issued (HPD, open)
C
01/03/2018
Violation issued (HPD, closed)
C
10/11/2017
Violation issued (HPD, open)
C
10/11/2017
Violation issued (HPD, open)
B
10/11/2017
Violation issued (HPD, open)
B
10/11/2017
Violation issued (HPD, open)
B
10/11/2017
Violation issued (HPD, open)
B
10/11/2017
Violation issued (HPD, open)
B
10/11/2017
Violation issued (HPD, open)
B
10/11/2017
Violation issued (HPD, open)
C
08/02/2017
Violation issued (HPD, closed)
C
08/02/2017
Violation issued (HPD, closed)
C
07/13/2017
Violation issued (HPD, closed)
C
07/13/2017
Violation issued (HPD, open)
C
07/13/2017
Violation issued (HPD, closed)
C
06/27/2017
Violation issued (HPD, open)
B
06/27/2017
Violation issued (HPD, open)
B
06/27/2017
Violation issued (HPD, open)
B
06/27/2017
Violation issued (HPD, open)
B
06/27/2017
Violation issued (HPD, open)
B
06/27/2017
Violation issued (HPD, open)
C
03/06/2017
Violation issued (HPD, closed)
C
03/06/2017
Violation issued (HPD, closed)
C
03/06/2017
Violation issued (HPD, open)
B
03/06/2017
Violation issued (HPD, open)
B
03/06/2017
Violation issued (HPD, open)
B
03/06/2017
Violation issued (HPD, open)
B
Latest 60 of 87 events.
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWGeneral ConstructionSigned-offNY BUILDING ASSOCIATES IN07/03/2023
DOB NOWPlumbingSigned-offAMERICAN STANDARD P&H CORORP.07/03/2023
2 projects · most recent 01/24/2024
General Wiring
FiledStatusContractorScope
01/24/2024CompleteERIC & NG ELEC'L, INC.General Wiring
02/07/2018Permit IssuedDELTEX ELECTRICAL CONT. IGeneral Wiring
▾Field Inspections (DOB CAP) — 4
DateTypeResultReport
02/07/2024Certified Remove/Cap - work done in accordance with codeCertifiedView ↗
02/02/2024Pass-Final General Construction Non-Directive 14PassView ↗
01/02/2024Certified Water and Sanitary-WS-Fixtures-FinishCertifiedView ↗
12/27/2023Pass-Final PL - Up to 3 Requested FloorsPassView ↗
▾Special Inspection Requirements (DOB NOW) — 15
DateRequirementInspectorRole
01/17/2024HVAC-R and service water piping design and insulationZHENHUAN XUenergy_progress
01/17/2024Air barrier - visual inspectionZHENHUAN XUenergy_progress
01/17/2024Fire-Resistant Penetrations and JointsZHENHUAN XUspecial
01/17/2024Energy Code Compliance InspectionsZHENHUAN XUprogress
01/17/2024Fire-Resistant Penetrations and JointsZHENHUAN XUspecial
01/17/2024Energy Code Compliance InspectionsZHENHUAN XUprogress
01/17/2024FinalZHENHUAN XUprogress
01/17/2024Fire-Resistance Rated ConstructionZHENHUAN XUprogress
01/17/2024Interior lighting powerZHENHUAN XUenergy_progress
01/17/2024Fenestration and door U-factor and product ratingsZHENHUAN XUenergy_progress
01/17/2024Fenestration areasZHENHUAN XUenergy_progress
01/17/2024Fenestration air leakageZHENHUAN XUenergy_progress
01/02/2024Energy Code Compliance InspectionsZHENHUAN XUprogress
01/02/2024HVAC-R and service water piping design and insulationZHENHUAN XUenergy_progress
01/02/2024Fire-Resistant Penetrations and JointsZHENHUAN XUspecial
▾Documents — 21 on file (BIS + DOB NOW)
▸Plans & Drawings4
▸DOB NOWPlans/Sketch4
08/23/2026S00887010-I1Request digital key ↗
08/23/2026S00887010-P2Request digital key ↗
08/23/2026S00887010-P1Request digital key ↗
Showing 3 of 4 on file for this type
▸Seals & Professional Certifications13
▸DOB NOWProgress Inspector Seal & Signature6
09/02/2026S00887010-S1Open ↗
09/02/2026S00887010-S1Open ↗
09/01/2026S00887010-P1Open ↗
Showing 3 of 6 on file for this type
▸DOB NOWDPL-1: Design Professional Seal & Signature4
08/23/2026S00887010-I1Open ↗
08/23/2026S00887010-P2Open ↗
08/23/2026S00887010-P1Open ↗
Showing 3 of 4 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature3
09/02/2026S00887010-S1Open ↗
09/01/2026S00887010-P1Open ↗
08/28/2026S00887010-I1Open ↗
▸Environmental & Asbestos4
▸DOB NOWDEP ACP-5: Asbestos Assessment Report4
08/23/2026S00887010-I1Open ↗
08/23/2026S00887010-P2Open ↗
08/23/2026S00887010-P1Open ↗
Showing 3 of 4 on file for this type