← Back
Walk-up cooperative
27 WEST 10 STREET
MANHATTAN · BIN 1009549
💬 Discuss this project
1847Year Built
4Stories
C6Building Class
R6Zoning
8,204 sfGross Floor Area
7Units
Rent Stabilized2 Open Violations ▸
Walk-up cooperative · 2,397 sf lot · 3.42 FAR built · Flood zone X
Locations of Work
ArchitectureElectrical
Roof1p · 1 filing · 4 docs
Floor 21p · 1 filing · 12 docs
Floor 1
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
27 WEST 10TH STREET803/21/2026
27 W 10 STR OWNERS303/21/2026
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
ERIC SHEFFIELD ARCHITECT209/30/2025
ARCHITECTURE+CONSTRUCTION, PLLC203/14/2025
JOCK DEBOER, AIA105/21/2024
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
JAM CONSULTANTS, INC.403/21/2026
A+ EXPEDITING203/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
ASIDO SOLUTIONS LLCGeneral Contractor207/08/2026
ROMANELLO, WILLIAMElectrical103/21/2026
SORIANO ENCARNACION, AMINElectrical103/21/2026
ASHLEY, ANTHONYElectrical103/21/2026
TESTA ELECTRIC CO., INCElectrical103/22/2026
REGELE BUILDERS, INCGeneral Contractor104/09/2026
STEWART, DUDLEYElectrical103/21/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
ERIC SHEFFIELD ARCHITECT2195209/30/2025
ARCHITECTURE+CONSTRUCTION1326103/14/2025
Building Lifecycle
All (52)Filed (5)Permit Issued (3)Signed Off (3)Violation (4)Objection (18)Special Inspection (19)
01/15/2026
Signed off — Alteration
Masonry repairs to be conducted on rear facade. Repairs include brick replacement, mortar, repointing, window sill replacement, window lintel replacement, stone patching.
M01228263-I1
10/07/2025
Special inspection requirement — Masonry
Eric Sheffield
10/07/2025
Special inspection requirement — Final
Eric Sheffield
10/07/2025
Special inspection requirement — Structural Stability – Alterations of existing buildings
Eric Sheffield
10/07/2025
Special inspection requirement — Tenant Protection Plan Compliance
Eric Sheffield
09/30/2025
Filed — Alteration
Masonry repairs to be conducted on rear facade. Repairs include brick replacement, mortar, repointing, window sill replacement, window lintel replacement, stone patching.
M01228263-P1
09/30/2025
Special inspection requirement — Masonry
Eric Sheffield
09/30/2025
Special inspection requirement — Structural Stability – Alterations of existing buildings
Eric Sheffield
09/30/2025
Special inspection requirement — Tenant Protection Plan Compliance
09/30/2025
Special inspection requirement — Final
Eric Sheffield
09/24/2025
Signed off — Alteration
APPLICATION FILED FOR EXTERIOR INSTALLATION OF AN HVAC CONDENSER UNIT AND REPLACEMENT OF EXISTING THROUGH WALL A/C UNITS. INTERIOR WORK INCLUDES INSTALLATION OF HVAC AT THE FIRST AND SECOND FLOOR LEVEL.
M01142309-I1
09/24/2025
Signed off — Alteration
APPLICATION FILED FOR EXTERIOR INSTALLATION OF AN HVAC CONDENSER UNIT AND REPLACEMENT OF EXISTING THROUGH WALL A/C UNITS. INTERIOR WORK INCLUDES INSTALLATION OF HVAC AT THE FIRST AND SECOND FLOOR LEVEL.
M01142309-S1
07/25/2025
Permit issued — General Construction
M01228263-I1-GC
06/16/2025
Objection resolved — Addressed
06/16/2025
Objection resolved — Addressed
06/06/2025
Objection resolved — Addressed
06/06/2025
Objection resolved — Addressed
06/06/2025
Objection resolved — Addressed
06/06/2025
Objection resolved — Addressed
06/06/2025
Objection resolved — Addressed
06/05/2025
Objection resolved — Addressed
06/02/2025
Objection raised — Scope
06/02/2025
Objection raised — Scope
06/02/2025
Objection raised — Inspections
06/02/2025
Objection raised — Scope
06/02/2025
Objection raised — Scope
06/02/2025
Objection raised — Admin
06/02/2025
Objection raised — Other
06/01/2025
Objection raised — Other
05/20/2025
Filed — Alteration
Masonry repairs to be conducted on rear facade. Repairs include brick replacement, mortar, repointing, window sill replacement, window lintel replacement, stone patching.
M01228263-I1
04/14/2025
Permit issued — General Construction
M01142309-I1-GC
04/14/2025
Permit issued — Mechanical Systems
M01142309-S1-MS
03/14/2025
Filed — Alteration
APPLICATION FILED FOR EXTERIOR INSTALLATION OF AN HVAC CONDENSER UNIT AND REPLACEMENT OF EXISTING THROUGH WALL A/C UNITS. INTERIOR WORK INCLUDES INSTALLATION OF HVAC AT THE FIRST AND SECOND FLOOR LEVEL.
M01142309-S1
03/05/2025
Special inspection requirement — Final
Joshua Pulver
03/05/2025
Special inspection requirement — Mechanical Systems
Joshua Pulver
12/10/2024
Filed — Alteration
APPLICATION FILED FOR EXTERIOR INSTALLATION OF AN HVAC CONDENSER UNIT AND REPLACEMENT OF EXISTING THROUGH WALL A/C UNITS. INTERIOR WORK INCLUDES INSTALLATION OF HVAC AT THE FIRST AND SECOND FLOOR LEVEL.
M01142309-I1
11/14/2024
Special inspection requirement — Final
Joshua Pulver
05/22/2024
Objection raised — Scope
05/22/2024
Objection resolved — Resolved
05/21/2024
Filed — Alteration
Application filed to renovate apartment 2 includes modification to the existing nonbearing partitions with new finishes, replace existing through wall, add AC split system as per the plans- no change to use, egress or occupancy.
M01013675-I1
03/07/2024
Special inspection requirement — HVAC-R and service water piping design and insulation
03/07/2024
Special inspection requirement — HVAC-R and service water heating equipment
03/07/2024
Special inspection requirement — Energy Code Compliance Inspections
03/07/2024
Special inspection requirement — Fire-Resistant Penetrations and Joints
03/07/2024
Special inspection requirement — HVAC-R and service water heating system controls
03/07/2024
Special inspection requirement — Fire-Resistance Rated Construction
03/01/2024
Special inspection requirement — Final
03/01/2024
Special inspection requirement — Mechanical Systems
01/03/2008
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
01/03/2008
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
09/16/1997
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
09/16/1997
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWGeneral ConstructionSigned-offREGELE BUILDERS, INC07/25/2025
DOB NOWGeneral ConstructionSigned-offASIDO SOLUTIONS04/14/2025
DOB NOWMechanical SystemsSigned-offASIDO SOLUTIONS04/14/2025
BISPLISSUEDPAT SEMENTA P & H CO INC05/17/2012
BISBLISSUEDPAT SEMENTA P & H CO INC05/17/2012
BISBLISSUEDPAT SEMENTA P & H CO INC09/23/2010
BISPLISSUEDPAT SEMENTA P & H CO INC02/25/2008
BISBLISSUEDPAT SEMENTA P & H CO INC02/25/2008
BISOTISSUEDUNITED CONSTRUCTION WEASTHERPROO03/28/2006
BISOTISSUEDUNITED CONSTRUCTION WEASTHERPROO03/28/2006
BISOTISSUEDUNITED CONSTRUCTION WEASTHERPROO01/13/2006
BISOTISSUEDUNITED CONSTRUCTION WEASTHERPROO01/13/2006
BISEQISSUEDT.B.R. INC.11/01/1999
BISPLISSUEDGRAHAM PBLG CO11/07/1997
1 project · most recent 05/21/2024
Heating and Air Conditioning Systems
FiledStatusContractorScopeMake / Model / Capacity
05/21/2024——Heating and Air Conditioning Systems
Heat / Cool
Mitsubishi Electric City-Multi SM48 9,800 BTU · Vrf Outdoor ×1
2 projects · most recent 11/12/2025
General Wiring
FiledStatusContractorScope
11/12/2025CompleteVILLAGE ELECTL CONTRS INC—
05/01/2024CompleteTESTA ELECTRIC CO., INCGeneral Wiring
▾Special Inspection Requirements (DOB NOW) — 19
DateRequirementInspectorRole
10/07/2025MasonryEric Sheffieldspecial
10/07/2025FinalEric Sheffieldprogress
10/07/2025Structural Stability – Alterations of existing buildingsEric Sheffieldspecial
10/07/2025Tenant Protection Plan ComplianceEric Sheffieldspecial
09/30/2025MasonryEric Sheffieldspecial
09/30/2025Structural Stability – Alterations of existing buildingsEric Sheffieldspecial
09/30/2025Tenant Protection Plan Compliance—special
09/30/2025FinalEric Sheffieldprogress
03/05/2025FinalJoshua Pulverprogress
03/05/2025Mechanical SystemsJoshua Pulverspecial
11/14/2024FinalJoshua Pulverprogress
03/07/2024HVAC-R and service water piping design and insulation—energy_progress
03/07/2024HVAC-R and service water heating equipment—energy_progress
03/07/2024Energy Code Compliance Inspections—progress
03/07/2024Fire-Resistant Penetrations and Joints—special
03/07/2024HVAC-R and service water heating system controls—energy_progress
03/07/2024Fire-Resistance Rated Construction—progress
03/01/2024Final—progress
03/01/2024Mechanical Systems—special
▾Documents — 41 on file (BIS + DOB NOW)
▸Plans & Drawings3
▸DOB NOWPlans/Sketch3
08/25/2026M01142309-S1Request digital key ↗
08/25/2026M01142309-I1Request digital key ↗
08/15/2026M01013675-I1Request digital key ↗
▸Applications & Permits7
▸BISWORK PERMIT APPLICATION4
09/29/2010110088280Open ↗
09/29/2010110088280Open ↗
02/25/2008110088280Open ↗
Showing 3 of 4 on file for this type
▸DOB NOWLPC Approval/Permit3
08/13/2026M01142309-I1Open ↗
08/13/2026M01142309-S1Open ↗
08/13/2026M01013675-I1Open ↗
▸Seals & Professional Certifications16
▸DOB NOWSpecial Inspector Seal & Signature6
09/01/2026M01228263-P1Open ↗
09/01/2026M01228263-P1Open ↗
08/24/2026M01142309-S1Open ↗
Showing 3 of 6 on file for this type
▸DOB NOWProgress Inspector Seal & Signature4
09/01/2026M01228263-P1Open ↗
08/24/2026M01142309-S1Open ↗
08/23/2026M01142309-I1Open ↗
Showing 3 of 4 on file for this type
▸DOB NOWDPL-1: Design Professional Seal & Signature3
08/27/2026M01013675-I1Open ↗
08/25/2026M01142309-S1Open ↗
08/25/2026M01142309-I1Open ↗
▸BISPROFESSIONAL CERTIFIED CHECKLIST1
02/11/2008110088280Open ↗
▸BISPROFESSIONAL CERTIFICATION STATEMENT FORM1
02/11/2008110088280Open ↗
▸BISPC FULL REPORT1
02/11/2008110088280Open ↗
▸Trade Schedules & Equipment3
▸BISBOILERS - SUPPORTING DOCUMENTATION1
07/24/2012110088280Open ↗
▸BISSELF-CERT PLUMBING NOTICE1
07/24/2012110088280Open ↗
▸BISSCHEDULE C - HEATING & COMBUSTION EQUIPMENT1
02/11/2008110088280Open ↗
▸Environmental & Asbestos4
▸DOB NOWDEP ACP-5: Asbestos Assessment Report3
08/25/2026M01142309-S1Open ↗
08/25/2026M01142309-I1Open ↗
08/15/2026M01013675-I1Open ↗
▸BISTHIS IS 'NOT AN ASBESTOS PROJECT'1
02/11/2008110088280Open ↗
▸Inspections & Test Reports1
▸BISNOTIF.-PROPOSED STEAM/HOT WATER INSPECTION1
02/11/2008110088280Open ↗
▸Approvals, Objections & Sign-offs3
▸DOB NOWLandmark Approval2
08/13/2026M01228263-I1Open ↗
08/13/2026M01228263-P1Open ↗
▸BISADMINISTRATIVE OBJECTIONS1
02/11/2008110088280Open ↗
▸Cost, Insurance & Ownership2
▸BISCOST AFFIDAVIT2
02/25/2008110088280Open ↗
02/25/2008110088280Open ↗
▸Other Documents2
▸DOB NOWProof of Historic Building2
08/13/2026M01228263-P1Open ↗
08/13/2026M01228263-I1Open ↗