← Back
Hotel, private club, luxury
27 WEST 44 STREET
MANHATTAN · BIN 1034222
💬 Discuss this project
1910Year Built
8Stories
H5Building Class
C6-4.5Zoning
—Gross Floor Area
78Units
Hotel, private club, luxury · Owner of record: HARVARD CLUB OF NEW YORK CITY · 6.48 FAR built · Flood zone X
Locations of Work
ArchitectureMechanical
Floor 82p · 1 filing · 11 docs
Floor 7
Floor 6
Floor 5
Floor 42p · 2 filings · 14 docs
Floor 3
Floor 2
Floor 1
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
HARVARD CLUB OF NEW YORK CITY203/22/2026
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
JOHN G. WAITE, JR. FAIA308/08/2024
KOHLER RONAN, LLC108/08/2024
NICHOLAS J. DEFELICE, P.E.607/14/2021
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
MBE CODE & ZONING LLC803/21/2026
CH BUILDING CONSULTANTS1203/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
CENTRAL CONSTRUCTION MANAGEMENTGeneral Contractor607/08/2026
DJM NYC, LLCGeneral Contractor303/21/2026
POLER CONTRACTING INCGeneral Contractor307/08/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
MICHAEL DE LUNA, AIA, ARC8232308/08/2024
TRIANGLE INSPECTION & TES7495408/08/2024
Building Lifecycle
All (41)Filed (10)Permit Issued (9)Signed Off (4)Objection (2)Special Inspection (16)
01/20/2026
Signed off — Alteration
M01049043-I1
02/28/2025
Permit issued — General Construction
M01048908-I1-GC
01/27/2025
Objection resolved — Addressed
12/05/2024
Permit issued — Mechanical Systems
M01049043-I1-MS
08/23/2024
Signed off — Alteration
Installation of a new awning and reinforced concrete masonry wall. As shown on drawings.
M00825784-I1
08/20/2024
Objection raised — Admin
08/08/2024
Filed — Alteration
M01049043-I1
08/08/2024
Filed — Alteration
M01048908-I1
05/17/2024
Special inspection requirement — Fire-Resistant Penetrations and Joints
Michael De Luna
05/17/2024
Special inspection requirement — Masonry
Michael De Luna
05/09/2024
Special inspection requirement — Final
Michael De Luna
05/09/2024
Special inspection requirement — Post-installed Anchors
Rajasekhar Sakhamuri
05/09/2024
Special inspection requirement — Structural Stability – Alterations of existing buildings
Michael De Luna
03/14/2024
Special inspection requirement — Structural Stability – Alterations of existing buildings
Michael De Luna
03/14/2024
Special inspection requirement — Post-installed Anchors
Rajasekhar Sakhamuri
03/14/2024
Special inspection requirement — Fire-Resistant Penetrations and Joints
Michael De Luna
03/14/2024
Special inspection requirement — Masonry
Michael De Luna
03/14/2024
Special inspection requirement — Final
Michael De Luna
03/07/2024
Filed — Alteration
Installation of a new awning and reinforced concrete masonry wall. As shown on drawings.
M00825784-P1
03/05/2024
Special inspection requirement — Fire-Resistant Penetrations and Joints
Michael De Luna
03/05/2024
Special inspection requirement — Masonry
Michael De Luna
03/05/2024
Special inspection requirement — Post-installed Anchors
Rajasekhar Sakhamuri
03/05/2024
Special inspection requirement — Structural Stability – Alterations of existing buildings
Michael De Luna
03/05/2024
Special inspection requirement — Final
04/06/2023
Permit issued — General Construction
M00825784-I1-GC
03/23/2023
Permit issued — General Construction
M00825784-I1-GC
03/13/2023
Filed — Alteration
Installation of a new awning and reinforced concrete masonry wall. As shown on drawings.
M00825784-I1
03/22/2022
Signed off — Alteration
PAA to include the following changes: Sidewalk Shed extension was adjusted to be 6' on both ends (On West 45th Street). Side walk shed elevation was added to the drawing. Shed height was decreased to 12' (On West 45th Street)
M00386006-I1
03/07/2022
Signed off — Alteration
For filing installation of pipe scaffolding on behalf of contractor
M00394670-I1
07/16/2021
Special inspection requirement — Final
Nicholas DeFelice
07/14/2021
Filed — Alteration
For filing installation of pipe scaffolding on behalf of contractor
M00394670-P2
05/28/2021
Filed — Alteration
For filing installation of pipe scaffolding on behalf of contractor
M00394670-P1
05/28/2021
Filed — Alteration
PAA to include the following changes: Sidewalk Shed extension was adjusted to be 6' on both ends (On West 45th Street). Side walk shed elevation was added to the drawing. Shed height was decreased to 12' (On West 45th Street)
M00386006-P2
03/19/2021
Permit issued — Sidewalk Shed
M00386006-I1-SH
03/15/2021
Filed — Alteration
PAA to include the following changes: Sidewalk Shed extension was adjusted to be 6' on both ends (On West 45th Street). Side walk shed elevation was added to the drawing. Shed height was decreased to 12' (On West 45th Street)
M00386006-P1
11/09/2020
Permit issued — Sidewalk Shed
M00386006-I1-SH
10/19/2020
Permit issued — Supported Scaffold
M00394670-I1-SF
09/04/2020
Permit issued — Supported Scaffold
M00394670-I1-SF
09/03/2020
Filed — Alteration
For filing installation of pipe scaffolding on behalf of contractor
M00394670-I1
08/18/2020
Permit issued — Sidewalk Shed
M00386006-I1-SH
08/17/2020
Filed — Alteration
PAA to include the following changes: Sidewalk Shed extension was adjusted to be 6' on both ends (On West 45th Street). Side walk shed elevation was added to the drawing. Shed height was decreased to 12' (On West 45th Street)
M00386006-I1
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWGeneral ConstructionSigned-offPOLER CONTRACTING INC02/28/2025
DOB NOWMechanical SystemsSigned-offPOLER CONTRACTING INC12/05/2024
DOB NOWGeneral ConstructionSigned-offPOLER CONTRACTING INC04/06/2023
DOB NOWGeneral ConstructionSigned-offPOLER CONTRACTING INC03/23/2023
DOB NOWSidewalk ShedSigned-offCENTRAL CONSTRUCTION MANAGEMENT03/19/2021
DOB NOWSidewalk ShedSigned-offCENTRAL CONSTRUCTION MANAGEMENT11/09/2020
DOB NOWSupported ScaffoldSigned-offDJM NYC, LLC10/19/2020
DOB NOWSupported ScaffoldSigned-offCENTRAL CONSTRUCTION MANAGEMENT09/04/2020
DOB NOWSidewalk ShedSigned-offCENTRAL CONSTRUCTION MANAGEMENT08/18/2020
BISEQISSUEDCOLGATE ENTERPRISE CORP07/02/2015
BISEQISSUEDTRI BOROUGH SCAFFOLDING04/10/2012
BISEQISSUEDTRI BOROUGH SCAFFOLDING03/22/2012
BISEQISSUEDALL SAFE HEIGHT CONTR. CORP.12/10/2002
BISEQISSUEDATLANTIC HEYDT CORP06/06/2002
BISEQISSUEDATLANTIC HEYDT CORP03/29/2002
BISEQISSUEDATLANTIC HEYDT CORP12/18/2001
BIS—ISSUEDBIG APPLE WRECKING&CONSTRUCTION07/13/2001
BISEQISSUEDBIG APPLE WRECKING& CONSTRUCTION07/13/2001
BISEQISSUEDALL SAFE HEIGHT CONTRACTING CORP07/02/2001
3 projects · most recent 12/13/2024
General Wiring
FiledStatusContractorScope
12/13/2024Permit IssuedJOHN MICHAEL AND SONS ELEGeneral Wiring
01/29/2021Permit IssuedROBERT CHIMENTI2 meters, 1 new_meters
08/17/2020CompleteTOP SHELF ELECTRIC CORP—
▾Special Inspection Requirements (DOB NOW) — 16
DateRequirementInspectorRole
05/17/2024Fire-Resistant Penetrations and JointsMichael De Lunaspecial
05/17/2024MasonryMichael De Lunaspecial
05/09/2024FinalMichael De Lunaprogress
05/09/2024Post-installed AnchorsRajasekhar Sakhamurispecial
05/09/2024Structural Stability – Alterations of existing buildingsMichael De Lunaspecial
03/14/2024Structural Stability – Alterations of existing buildingsMichael De Lunaspecial
03/14/2024Post-installed AnchorsRajasekhar Sakhamurispecial
03/14/2024Fire-Resistant Penetrations and JointsMichael De Lunaspecial
03/14/2024MasonryMichael De Lunaspecial
03/14/2024FinalMichael De Lunaprogress
03/05/2024Fire-Resistant Penetrations and JointsMichael De Lunaspecial
03/05/2024MasonryMichael De Lunaspecial
03/05/2024Post-installed AnchorsRajasekhar Sakhamurispecial
03/05/2024Structural Stability – Alterations of existing buildingsMichael De Lunaspecial
03/05/2024Final—progress
07/16/2021FinalNicholas DeFeliceprogress
▾Documents — 38 on file (BIS + DOB NOW)
▸Plans & Drawings8
▸DOB NOWPlans/Sketch - Sidewalk Shed3
09/03/2026M00386006-I1Request digital key ↗
09/03/2026M00386006-P2Request digital key ↗
09/03/2026M00386006-P1Request digital key ↗
▸DOB NOWPlans/Sketch - Supported Scaffold3
09/03/2026M00394670-I1Request digital key ↗
08/15/2026M00394670-P2Request digital key ↗
08/15/2026M00394670-P1Request digital key ↗
▸DOB NOWPlans/Sketch2
08/26/2026M01048908-I1Request digital key ↗
08/26/2026M01049043-I1Request digital key ↗
▸Applications & Permits2
▸DOB NOWLPC Approval/Permit2
08/13/2026M01048908-I1Open ↗
08/13/2026M01049043-I1Open ↗
▸Seals & Professional Certifications23
▸DOB NOWSpecial Inspector Seal & Signature12
08/28/2026M00825784-I1Open ↗
08/28/2026M00825784-I1Open ↗
08/28/2026M00825784-I1Open ↗
Showing 3 of 12 on file for this type
▸DOB NOWDPL-1: Design Professional Seal & Signature8
09/03/2026M00386006-P2Open ↗
09/03/2026M00386006-P1Open ↗
09/03/2026M00386006-I1Open ↗
Showing 3 of 8 on file for this type
▸DOB NOWProgress Inspector Seal & Signature3
09/02/2026M00394670-I1Open ↗
08/28/2026M00825784-I1Open ↗
08/25/2026M01048908-I1Open ↗
▸Environmental & Asbestos2
▸DOB NOWDEP ACP-20/ACP-21: Asbestos Project Conditional Completion Form/Asbestos Project Completion Form2
08/26/2026M01048908-I1Open ↗
08/26/2026M01049043-I1Open ↗
▸Approvals, Objections & Sign-offs2
▸DOB NOWLandmark Approval2
08/13/2026M00825784-I1Open ↗
08/13/2026M00825784-P1Open ↗
▸Other Documents1
▸DOB NOWProof of Historic Building1
08/13/2026M01048908-I1Open ↗