← Back
Walk-up cooperative
27 WEST 82 STREET
MANHATTAN · Upper West Side (Central) · BIN 1031172
💬 Discuss this project
1887Year Built
4Stories
C6Building Class
R8BZoning
5,667 sfGross Floor Area
10Units
Rent Stabilized0 Open Violations
Walk-up cooperative · Owner of record: 27 W 82 APARTMENTS INC · 2,043 sf lot · 2.77 FAR built · Flood zone X
Locations of Work
ArchitectureStructuralMechanicalPlumbing
Floor 13p · 3 filings · 20 docs
Cellar2p · 1 filing · 18 docs
Basement2p · 2 filings · 20 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
BILLY ENTERPRISES807/08/2026
27 W 82 APARTMENTS INC103/22/2026
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
ANGELOS GEORGOPOULOS, P.C.206/22/2022
D'ANTONIO CONSULTING ENGINEERS406/21/2022
DELSON OR SHERMAN ARCHITECTS PC206/21/2022
GREEN DESIGN102/26/2018
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
CODE1603/21/2026
HAIDER ENGINEERING, P.E.103/21/2026
HAIDER ENGINEERING P E103/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
TOMCHRIS CONTRACTING CORPGeneral Contractor1007/08/2026
BILLY ENTERPRISES INCGeneral Contractor707/08/2026
JOE MIDDLETONElectrical103/21/2026
ORBIT PLBG & HTG INCPlumbing107/08/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
ANGELOS GEORGOPOULOS, P.C2955406/22/2022
D'ANTONIO CONSULTING ENGI931206/21/2022
Building Lifecycle
All (63)Filed (9)Permit Issued (10)Signed Off (5)Violation (11)Inspection (5)Objection (6)Special Inspection (17)
03/16/2023
Violation issued (HPD, closed)
A
11/02/2022
Violation issued (HPD, closed)
I
07/21/2022
Signed off — Alteration
Partial renovation of basement and first floor
M00543983-I1
07/20/2022
Signed off — Alteration
INTERIOR RENOVATION OF BASEMENT AND FIRST FLOOR OF EXITING RESIDENTIAL BUILDING. NO CHANGE IN USE, OCCUPANCY, OR EGRESS.
M00543963-I1
07/15/2022
Signed off — Alteration
PLUMBING WORK IN CONJUNCTION WITH INTERIOR RENOVATION OF BASEMENT AND FIRST FLOOR OF EXITING RESIDENTIAL BUILDING. NO CHANGE IN USE, OCCUPANCY, OR EGRESS.
M00543965-I1
07/07/2022
Signed off — Alteration
MECHANICAL WORK IN CONJUNCTION WITH INTERIOR RENOVATION OF BASEMENT AND FIRST FLOOR OF EXITING RESIDENTIAL BUILDING. NO CHANGE IN USE, OCCUPANCY, OR EGRESS.
M00543973-I1
07/06/2022
Objection raised — Scope
07/06/2022
Objection resolved — Addressed
06/28/2022
Objection resolved — Addressed
06/24/2022
Objection raised — Scope
06/24/2022
Special inspection requirement — Structural Stability – Alterations of existing buildings
Angelos Georgopoulos
06/24/2022
Special inspection requirement — Structural Steel - High Strength Bolting
Angelos Georgopoulos
06/24/2022
Special inspection requirement — Final
Angelos Georgopoulos
06/24/2022
Special inspection requirement — Structural Steel - Details
Angelos Georgopoulos
06/24/2022
Special inspection requirement — Structural Steel - Welding
Angelos Georgopoulos
06/22/2022
Filed — Alteration
Partial renovation of basement and first floor
M00543983-P1
06/22/2022
Special inspection requirement — Final
GAETANO D'ANTONIO
06/22/2022
Special inspection requirement — Fire-Resistant Penetrations and Joints
GAETANO D'ANTONIO
06/22/2022
Special inspection requirement — Mechanical Systems
GAETANO D'ANTONIO
06/21/2022
Filed — Alteration
INTERIOR RENOVATION OF BASEMENT AND FIRST FLOOR OF EXITING RESIDENTIAL BUILDING. NO CHANGE IN USE, OCCUPANCY, OR EGRESS.
M00543963-P1
06/21/2022
Filed — Alteration
MECHANICAL WORK IN CONJUNCTION WITH INTERIOR RENOVATION OF BASEMENT AND FIRST FLOOR OF EXITING RESIDENTIAL BUILDING. NO CHANGE IN USE, OCCUPANCY, OR EGRESS.
M00543973-P1
06/02/2022
Special inspection requirement — Structural Stability – Alterations of existing buildings
Angelos Georgopoulos
06/02/2022
Special inspection requirement — Structural Steel - High Strength Bolting
Angelos Georgopoulos
06/02/2022
Special inspection requirement — Structural Steel - Details
Angelos Georgopoulos
06/02/2022
Special inspection requirement — Structural Steel - Welding
Angelos Georgopoulos
06/02/2022
Special inspection requirement — Final
Angelos Georgopoulos
05/23/2022
Inspection — Pass-Final PL - Up to 3 Requested Floors
Pass
View inspection ↗
05/20/2022
Special inspection requirement — Fire-Resistant Penetrations and Joints
GAETANO D'ANTONIO
05/20/2022
Special inspection requirement — Mechanical Systems
GAETANO D'ANTONIO
05/20/2022
Special inspection requirement — Final
GAETANO D'ANTONIO
05/18/2022
Inspection — Fail-Final PL - Up to 3 Requested Floors
Fail
View inspection ↗
05/11/2022
Inspection — Certified Remove/Cap - work done in accordance with code
Certified
View inspection ↗
04/27/2022
Objection resolved — Addressed
04/26/2022
Objection raised — Scope
04/21/2022
Filed — Alteration
PLUMBING WORK IN CONJUNCTION WITH INTERIOR RENOVATION OF BASEMENT AND FIRST FLOOR OF EXITING RESIDENTIAL BUILDING. NO CHANGE IN USE, OCCUPANCY, OR EGRESS.
M00543965-P1
04/12/2022
Inspection — Fail-Final PL - Up to 3 Requested Floors
Fail
View inspection ↗
02/16/2022
Violation issued (HPD, closed)
A
12/11/2021
Permit issued — Mechanical Systems
M00543973-I1-MS
12/11/2021
Permit issued — General Construction
M00543963-I1-GC
12/11/2021
Permit issued — Structural
M00543983-I1-ST
11/23/2021
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Roughing
Certified
View inspection ↗
09/10/2021
Permit issued — Mechanical Systems
M00543973-I1-MS
09/10/2021
Permit issued — Plumbing
M00543965-I1-PL
09/03/2021
Permit issued — Structural
M00543983-I1-ST
09/01/2021
Permit issued — General Construction
M00543963-I1-GC
07/22/2021
Filed — Alteration
Partial renovation of basement and first floor
M00543983-I1
07/21/2021
Filed — Alteration
PLUMBING WORK IN CONJUNCTION WITH INTERIOR RENOVATION OF BASEMENT AND FIRST FLOOR OF EXITING RESIDENTIAL BUILDING. NO CHANGE IN USE, OCCUPANCY, OR EGRESS.
M00543965-I1
07/21/2021
Filed — Alteration
MECHANICAL WORK IN CONJUNCTION WITH INTERIOR RENOVATION OF BASEMENT AND FIRST FLOOR OF EXITING RESIDENTIAL BUILDING. NO CHANGE IN USE, OCCUPANCY, OR EGRESS.
M00543973-I1
07/02/2021
Filed — Alteration
INTERIOR RENOVATION OF BASEMENT AND FIRST FLOOR OF EXITING RESIDENTIAL BUILDING. NO CHANGE IN USE, OCCUPANCY, OR EGRESS.
M00543963-I1
04/01/2021
Violation issued (HPD, closed)
A
12/07/2020
Signed off — Alteration
PROPOSED INSTALLATION OF HEAVY DUTY SIDEWALK SHED AS PER PLANS. LIVE LOAD 300 LBS PER SQUARE FEET. SIDEWALK SHED SHALL COMPLY WITH CHAPTER #33 OF THE NYC BUILDING CODE. NO CHANGE IN USE, OCCUPANCY, OR EGRESS UNDER THIS APPLICATION.
M00022061-I1
09/21/2018
Permit issued — Sidewalk Shed
M00022061-I1-SH
08/10/2018
Permit issued — Sidewalk Shed
M00022061-I1-SH
02/26/2018
Filed — Alteration
PROPOSED INSTALLATION OF HEAVY DUTY SIDEWALK SHED AS PER PLANS. LIVE LOAD 300 LBS PER SQUARE FEET. SIDEWALK SHED SHALL COMPLY WITH CHAPTER #33 OF THE NYC BUILDING CODE. NO CHANGE IN USE, OCCUPANCY, OR EGRESS UNDER THIS APPLICATION.
M00022061-I1
02/26/2018
Permit issued — Sidewalk Shed
M00022061-I1-SH
02/23/2018
Special inspection requirement — Final
BRIAN T. O'CONNOR
05/15/2014
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
01/19/2007
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
02/13/2004
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
02/27/2001
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
Latest 60 of 63 events.
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWMechanical SystemsSigned-offTOMCHRIS CONTRACTING CORP12/11/2021
DOB NOWGeneral ConstructionSigned-offTOMCHRIS CONTRACTING CORP12/11/2021
DOB NOWStructuralSigned-offTOMCHRIS CONTRACTING CORP12/11/2021
DOB NOWMechanical SystemsSigned-offTOMCHRIS CONTRACTING CORP09/10/2021
DOB NOWPlumbingSigned-offORBIT PLBG & HTG INC09/10/2021
DOB NOWStructuralSigned-offTOMCHRIS CONTRACTING CORP09/03/2021
DOB NOWGeneral ConstructionSigned-offTOMCHRIS CONTRACTING CORP09/01/2021
DOB NOWSidewalk ShedSigned-offBILLY ENTERPRISES INC09/21/2018
DOB NOWSidewalk ShedSigned-offBILLY ENTERPRISES INC08/10/2018
DOB NOWSidewalk ShedSigned-offBILLY ENTERPRISES INC02/26/2018
BISOTISSUEDNYRES RESTORATION , INC07/02/2018
BISOTISSUEDPECONIC PNTG & REN. INC08/23/2012
BISOTISSUEDPECONIC PNTG & REN. INC06/20/2012
BISPLISSUEDWASOFF PLBG & UTILITY CO07/21/1999
BISBLISSUEDWASOFF PLBG & UTILITY CO07/21/1999
BISPLISSUEDA REAL GOOD PLUMBER INC07/31/1997
2 projects · most recent 09/16/2021
FiledStatusContractorScope
09/16/2021CompleteGLENDALE ELECTL CONTNG IN—
02/23/2018CompleteWCK ELECTRIC CORP.—
▾Field Inspections (DOB CAP) — 5
DateTypeResultReport
05/23/2022Pass-Final PL - Up to 3 Requested FloorsPassView ↗
05/18/2022Fail-Final PL - Up to 3 Requested FloorsFailView ↗
05/11/2022Certified Remove/Cap - work done in accordance with codeCertifiedView ↗
04/12/2022Fail-Final PL - Up to 3 Requested FloorsFailView ↗
11/23/2021Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
▾Special Inspection Requirements (DOB NOW) — 17
DateRequirementInspectorRole
06/24/2022Structural Stability – Alterations of existing buildingsAngelos Georgopoulosspecial
06/24/2022Structural Steel - High Strength BoltingAngelos Georgopoulosspecial
06/24/2022FinalAngelos Georgopoulosprogress
06/24/2022Structural Steel - DetailsAngelos Georgopoulosspecial
06/24/2022Structural Steel - WeldingAngelos Georgopoulosspecial
06/22/2022FinalGAETANO D'ANTONIOprogress
06/22/2022Fire-Resistant Penetrations and JointsGAETANO D'ANTONIOspecial
06/22/2022Mechanical SystemsGAETANO D'ANTONIOspecial
06/02/2022Structural Stability – Alterations of existing buildingsAngelos Georgopoulosspecial
06/02/2022Structural Steel - High Strength BoltingAngelos Georgopoulosspecial
06/02/2022Structural Steel - DetailsAngelos Georgopoulosspecial
06/02/2022Structural Steel - WeldingAngelos Georgopoulosspecial
06/02/2022FinalAngelos Georgopoulosprogress
05/20/2022Fire-Resistant Penetrations and JointsGAETANO D'ANTONIOspecial
05/20/2022Mechanical SystemsGAETANO D'ANTONIOspecial
05/20/2022FinalGAETANO D'ANTONIOprogress
02/23/2018FinalBRIAN T. O'CONNORprogress
▾Documents — 96 on file (BIS + DOB NOW)
▸Plans & Drawings9
▸DOB NOWPlans/Sketch9
09/06/2026M00022061-I1Request digital key ↗
09/03/2026M00543963-I1Request digital key ↗
09/03/2026M00543965-I1Request digital key ↗
Showing 3 of 9 on file for this type
▸Applications & Permits13
▸DOB NOWLPC Approval/Permit8
09/03/2026M00543965-I1Open ↗
09/02/2026M00543973-I1Open ↗
09/02/2026M00543973-P1Open ↗
Showing 3 of 8 on file for this type
▸BISWORK PERMIT APPLICATION3
07/02/2018123398885Open ↗
08/30/2012120912085Open ↗
06/21/2012120912085Open ↗
▸BISPLAN / WORK APPROVAL APPLICATION2
06/15/2018123398885Open ↗
05/07/2012120912085Open ↗
▸Seals & Professional Certifications38
▸DOB NOWSpecial Inspector Seal & Signature12
08/29/2026M00543983-I1Open ↗
08/29/2026M00543983-I1Open ↗
08/29/2026M00543983-I1Open ↗
Showing 3 of 12 on file for this type
▸BISTECHNICAL REPORT: RESPONSIBILITY/CERTIFICATION10
01/24/2019123398885Open ↗
01/24/2019123398885Open ↗
01/24/2019123398885Open ↗
Showing 3 of 10 on file for this type
▸DOB NOWDPL-1: Design Professional Seal & Signature9
09/06/2026M00022061-I1Open ↗
09/03/2026M00543963-I1Open ↗
09/03/2026M00543963-P1Open ↗
Showing 3 of 9 on file for this type
▸DOB NOWProgress Inspector Seal & Signature5
08/29/2026M00543983-I1Open ↗
08/28/2026M00022061-I1Open ↗
08/27/2026M00543973-P1Open ↗
Showing 3 of 5 on file for this type
▸BISPROFESSIONAL CERTIFIED CHECKLIST1
06/15/2018123398885Open ↗
▸BISProfessional and Owner Certification (POC3)1
06/15/2018123398885Open ↗
▸Safety & Tenant Protection1
▸BISTenant Protection Plan and Notes1
06/15/2018123398885Open ↗
▸Environmental & Asbestos13
▸DOB NOWDEP ACP-5: Asbestos Assessment Report8
09/03/2026M00543963-I1Open ↗
09/03/2026M00543965-I1Open ↗
09/02/2026M00543973-P1Open ↗
Showing 3 of 8 on file for this type
▸BISTHIS IS NOT AN ASBESTOS PROJECT4
12/02/2011120912085Open ↗
12/02/2011120912085Open ↗
12/02/2011120912085Open ↗
Showing 3 of 4 on file for this type
▸BISASBESTOS: CERTIFICATION (DEP ACP5)1
06/15/2018123398885Open ↗
▸Energy Compliance6
▸BISTECHNICAL REPORT: ENERGY CODE PROGRESS INSPS3
07/02/2018123398885Open ↗
06/15/2018123398885Open ↗
10/30/2013120912085Open ↗
▸BISAS-BUILT ENERGY ANALYSIS2
01/24/2019123398885Open ↗
10/30/2013120912085Open ↗
▸BISTR8: Energy Code Progress Inspections1
03/21/2012120912085Open ↗
▸Approvals, Objections & Sign-offs6
▸BISCERTIFICATE OF OCCUPANCY/LOC: REQUEST2
01/24/2019123398885Open ↗
10/30/2013120912085Open ↗
▸BISLANDMARKS APPROVAL2
01/24/2019123398885Open ↗
06/15/2018123398885Open ↗
▸BISADMINISTRATIVE OBJECTIONS2
03/21/2012120912085Open ↗
12/02/2011120912085Open ↗
▸Cost, Insurance & Ownership5
▸BISCOST AFFIDAVIT5
01/24/2019123398885Open ↗
06/15/2018123398885Open ↗
10/30/2013120912085Open ↗
Showing 3 of 5 on file for this type
▸Filing & Intake Forms4
▸BISEFILING COVER SHEET2
06/15/2018123398885Open ↗
12/02/2011120912085Open ↗
▸BISADDITIONAL INFORMATION1
06/20/2012120912085Open ↗
▸BISBOROUGH INTAKE FORM1
01/24/2019123398885Open ↗
▸Other Documents1
▸DOB NOWBSA Meeting Minutes/BSA Resolution1
09/06/2026M00022061-I1Open ↗