Two stories - detached, small or mid-size
27 WHITMAN DRIVE
BROOKLYN · BIN 3243165
💬 Discuss this project
1960Year Built
2Stories
A1Building Class
R2Zoning
3,720 sfGross Floor Area
1Units
Two stories - detached, small or mid-size · 11,357 sf lot · 0.33 FAR built · Flood zone X500
Locations of Work
No floor-level scope or drawing coverage on file for this building.
▾Sales History (ACRIS)
DatePriceUnitSeller → Buyer$/sf
04/08/2014$1.5M—— → —$403/sf building
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
PARKER AND WEST ENGINEERING, PLLC108/11/2025
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
SUNRUN103/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
SUNRUN INSTALLATION SVCGeneral Contractor104/09/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
PARKER AND WEST ENGINEERI5272108/11/2025
Building Lifecycle
All (8)Filed (1)Permit Issued (1)Signed Off (1)Special Inspection (5)
01/15/2026
Signed off — Alteration
FILING HEREWITH TAX ABATEMENT APPLICATION FOR INSTALLATION OF ROOF MOUNTED SOLAR PANELS. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
B01268935-I1
08/14/2025
Permit issued — Solar
B01268935-I1-SL
08/11/2025
Filed — Alteration
FILING HEREWITH TAX ABATEMENT APPLICATION FOR INSTALLATION OF ROOF MOUNTED SOLAR PANELS. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
B01268935-I1
08/08/2025
Special inspection requirement — Fire-Resistant Penetrations and Joints
Walid Abdulla
08/08/2025
Special inspection requirement — Structural Stability – Alterations of existing buildings
Walid Abdulla
08/08/2025
Special inspection requirement — Energy Code Compliance Inspections
Walid Abdulla
08/08/2025
Special inspection requirement — Final
Walid Abdulla
08/08/2025
Special inspection requirement — Air barrier - visual inspection
Walid Abdulla
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWSolarSigned-offSUNRUN INSTALLATION SVC08/14/2025
1 project · most recent 08/11/2025
General Wiring
FiledStatusContractorScope
08/11/2025CompleteSUNRUN SOLAR ELECTL CORPGeneral Wiring
▾Special Inspection Requirements (DOB NOW) — 5
DateRequirementInspectorRole
08/08/2025Fire-Resistant Penetrations and JointsWalid Abdullaspecial
08/08/2025Structural Stability – Alterations of existing buildingsWalid Abdullaspecial
08/08/2025Energy Code Compliance InspectionsWalid Abdullaprogress
08/08/2025FinalWalid Abdullaprogress
08/08/2025Air barrier - visual inspectionWalid Abdullaenergy_progress
▾Documents — 9 on file (BIS + DOB NOW)
▸Plans & Drawings1
▸DOB NOWPlans/Sketch1
08/21/2026B01268935-I1Request digital key ↗
▸Seals & Professional Certifications6
▸DOB NOWProgress Inspector Seal & Signature3
08/27/2026B01268935-I1Open ↗
08/27/2026B01268935-I1Open ↗
08/27/2026B01268935-I1Open ↗
▸DOB NOWSpecial Inspector Seal & Signature2
08/27/2026B01268935-I1Open ↗
08/27/2026B01268935-I1Open ↗
▸DOB NOWDPL-1: Design Professional Seal & Signature1
08/13/2026B01268935-I1Open ↗
▸Environmental & Asbestos1
▸DOB NOWDEP ACP-5: Asbestos Assessment Report1
08/13/2026B01268935-I1Open ↗
▸Approvals, Objections & Sign-offs1
▸DOB NOWUtility Company Final Acceptance Letter1
08/13/2026B01268935-I1Open ↗