← Back
Miscellaneous two family
27 WINDSOR PLACE
BROOKLYN · BIN 3026887
💬 Discuss this project
1901Year Built
3Stories
B9Building Class
R5BZoning
2,142 sfGross Floor Area
2Units
Miscellaneous two family · 1,700 sf lot · 1.26 FAR built · Flood zone X
Locations of Work
Architecture
Roof2p · 1 filing · 6 docs
Floor 22p · 1 filing · 6 docs
Floor 1
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
M-CON ENGINEERING, PC110/22/2021
BRAUDE PANKIEWICZ ARCHITECTS110/05/2021
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
JRK CREATIVE203/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
HOME AIR INCGeneral Contractor303/21/2026
STM INTERIOR CONSTRUCTIONGeneral Contractor107/08/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
M-CON ENGINEERING7341110/22/2021
BRAUDE PANKIEWICZ ARCHITE4572110/05/2021
Building Lifecycle
All (7)Filed (2)Permit Issued (2)Signed Off (1)Inspection (2)
10/06/2022
Inspection — Pass-Final CND-Occupancy Inspection
Pass
View inspection ↗
09/22/2022
Inspection — Fail-Final CND-Occupancy Inspection
Fail
View inspection ↗
07/13/2022
Signed off — Alteration
B00615678-I1
06/23/2022
Permit issued — Mechanical Systems
B00615678-I1-MS
02/19/2022
Permit issued — General Construction
B00602672-I1-GC
10/22/2021
Filed — Alteration
B00615678-I1
10/05/2021
Filed — Alteration
THIS APPLICATION IS FOR THE PARTIAL RENOVATION OF SECOND FLOOR APARTMENT IN A 3 STORY , 2-FAMILY TOWNHOUSE.
B00602672-I1
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWMechanical SystemsSigned-offHOME AIR INC06/23/2022
DOB NOWGeneral ConstructionPermit IssuedSTM INTERIOR CONSTRUCTION02/19/2022
BISOTISSUED3 L BROS CORP.04/04/1995
Nothing on file for this building.
▾Field Inspections (DOB CAP) — 2
DateTypeResultReport
10/06/2022Pass-Final CND-Occupancy InspectionPassView ↗
09/22/2022Fail-Final CND-Occupancy InspectionFailView ↗
▾Special Inspection Requirements (DOB NOW) — 3
DateRequirementInspectorRole
09/29/2021Structural Stability – Alterations of existing buildingsTALIA BRAUDEspecial
09/29/2021FinalTALIA BRAUDEprogress
09/29/2021Lighting in dwelling unitsTALIA BRAUDEenergy_progress
▾Documents — 10 on file (BIS + DOB NOW)
▸Plans & Drawings2
▸DOB NOWPlans/Sketch2
09/01/2026B00602672-I1Request digital key ↗
08/31/2026B00615678-I1Request digital key ↗
▸Seals & Professional Certifications5
▸DOB NOWDPL-1: Design Professional Seal & Signature2
09/01/2026B00602672-I1Open ↗
08/31/2026B00615678-I1Open ↗
▸DOB NOWProgress Inspector Seal & Signature2
08/23/2026B00602672-I1Open ↗
08/23/2026B00602672-I1Open ↗
▸DOB NOWSpecial Inspector Seal & Signature1
08/23/2026B00602672-I1Open ↗
▸Environmental & Asbestos2
▸DOB NOWDEP ACP-5: Asbestos Assessment Report2
09/01/2026B00602672-I1Open ↗
08/31/2026B00615678-I1Open ↗
▸Energy Compliance1
▸DOB NOWEN2: As Built Energy Analysis.1
08/13/2026B00615678-I1Open ↗