LL97 Covered3 Open Violations 1 unresolved · 2 paperwork only▸
ECB12/29/20251RCNY 103-09(E). FAILURE TO FILE A RETAINING WALL CONDITION ASSESSMENTREPORT BY THE DEADLINE AS REQUIRED BY 1RCNY 103-09(E)(2) AND (5). TO DATE, THE DEPARTMENT HAS NOT RECEIVED A RETAINING WALL CONDITION ASSESS$1K due
ECB08/12/2019B 254 FOUND BECKETT CG25 GAS FIRED BURNER NOT REGISTERED, REGISTER THE BURNER AND SUBMIT A CERTIFICATE OF CORRECTIONNothing owed — awaiting certificate of correction
ECB10/23/2017FAILURE TO FILE ANNUAL CERTIFICATION THAT COOLING TOWER 1000002241 HAS BEEN INSPECTED, TESTED AND DISINFECTED AND THAT A MAINTENANCE PLAN HAS BEEN DEVELOPED AND IMPLEMENTED BY NOVEMBER 1, 2016. REM: FILE ANNUALNothing owed — awaiting certificate of correction
Hospital, sanitarium, mental institution · Owner of record: LONG ISLAND JEWISH HOSPITAL · 1,306,800 sf lot · 1.54 FAR built · Flood zone X
Locations of Work
No floor-level scope or drawing coverage on file for this building.