← Back
Condo, residential unit in 2-10 unit building
Park Slope East Condominium
270 1 STREET · BIN 3020763
💬 Discuss this project
1920Year Built
4Stories
R1Building Class
R6BZoning
6,094 sfGross Floor Area
8Units
Rent Stabilized2 Open Violations ▸FDNY Report ↗
Condo, residential unit in 2-10 unit building · 2,700 sf lot · 2.26 FAR built · Flood zone X
Locations of Work
ArchitectureGeneral
Cellar4p · 1 filing · 11 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
PARK SLOPE EAST CONDOMINIUM203/21/2026
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
GRAFEDE ARCHITECTURE, PLLC206/14/2021
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
RELIABLE EXPEDITING203/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
TW2M DESIGN/BUILD LLCGeneral Contractor303/21/2026
ARCH PLUMBING & HTNG CORPPlumbing107/08/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
SUPERIOR - HOME INSPECTIO1804206/14/2021
Building Lifecycle
All (40)Filed (2)Permit Issued (2)Signed Off (2)Violation (27)Inspection (4)Special Inspection (3)
04/30/2026
Violation issued (HPD, open)
A
11/20/2023
Violation issued (HPD, closed)
I
03/17/2023
Violation issued (HPD, closed)
A
02/18/2022
Violation issued (HPD, closed)
A
02/18/2022
Violation issued (HPD, closed)
I
10/15/2021
Signed off — Alteration
Interior renovation of cellar recreation space used conjunctively with first floor dwelling unit as indicated on drawings and associated specifications.
B00534477-S1
09/13/2021
Inspection — Certified Water and Sanitary-WS-Fixtures-Finish
Certified
View inspection ↗
09/09/2021
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Underground
Certified
View inspection ↗
08/03/2021
Inspection — Certified Water and Sanitary-WS-Fixtures-Finish
Certified
View inspection ↗
08/02/2021
Signed off — Alteration
Interior renovation of cellar recreation space used conjunctively with first floor dwelling unit as indicated on drawings and associated specifications.
B00534477-I1
07/07/2021
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Roughing
Certified
View inspection ↗
06/17/2021
Permit issued — Plumbing
B00534477-S1-PL
06/15/2021
Permit issued — General Construction
B00534477-I1-GC
06/14/2021
Filed — Alteration
Interior renovation of cellar recreation space used conjunctively with first floor dwelling unit as indicated on drawings and associated specifications.
B00534477-S1
06/14/2021
Special inspection requirement — Fire-Resistant Penetrations and Joints
Steven Williams
06/14/2021
Special inspection requirement — Energy Code Compliance Inspections
Darryl E. Cook
06/14/2021
Special inspection requirement — HVAC-R and service water piping design and insulation
Darryl E. Cook
06/07/2021
Filed — Alteration
Interior renovation of cellar recreation space used conjunctively with first floor dwelling unit as indicated on drawings and associated specifications.
B00534477-I1
04/05/2021
Violation issued (HPD, closed)
I
04/05/2021
Violation issued (HPD, closed)
A
10/28/2019
Violation issued (HPD, closed)
I
01/03/2008
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
01/19/2007
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
01/31/2005
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
10/22/2004
Violation issued (ECB, closed)
Construction
10/22/2004
Violation issued (ECB, closed)
Construction
10/22/2004
Violation issued (ECB, closed)
Construction
02/13/2004
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
03/19/2003
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
03/26/2002
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
02/27/2001
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
02/07/2000
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
03/16/1999
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
05/04/1998
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
09/16/1997
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
02/10/1997
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
08/29/1995
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
06/01/1994
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
08/16/1993
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
06/01/1993
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWPlumbingSigned-offARCH PLUMBING & HTNG CORP06/17/2021
DOB NOWGeneral ConstructionSigned-offTW2M DESIGN/BUILD LLC06/15/2021
BIS—ISSUEDPARK SLOPE LLC04/11/2005
BISEQISSUEDPARK SLOPE EAST LLC03/18/2005
BISPLISSUEDSMART PLBG & HTG CORP05/12/2004
BIS—ISSUEDPARK SLOPE LLC04/12/2004
BISEQISSUEDHI TECH BRIDGING INC01/09/2004
Nothing on file for this building.
▾Field Inspections (DOB CAP) — 4
DateTypeResultReport
09/13/2021Certified Water and Sanitary-WS-Fixtures-FinishCertifiedView ↗
09/09/2021Certified Water and Sanitary-WS-Sanitary Piping-UndergroundCertifiedView ↗
08/03/2021Certified Water and Sanitary-WS-Fixtures-FinishCertifiedView ↗
07/07/2021Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
▾Special Inspection Requirements (DOB NOW) — 3
DateRequirementInspectorRole
06/14/2021Fire-Resistant Penetrations and JointsSteven Williamsspecial
06/14/2021Energy Code Compliance InspectionsDarryl E. Cookprogress
06/14/2021HVAC-R and service water piping design and insulationDarryl E. Cookenergy_progress
▾Documents — 11 on file (BIS + DOB NOW)
▸Plans & Drawings2
▸DOB NOWPlans/Sketch2
09/01/2026B00534477-S1Request digital key ↗
09/01/2026B00534477-I1Request digital key ↗
▸Seals & Professional Certifications5
▸DOB NOWDPL-1: Design Professional Seal & Signature2
09/01/2026B00534477-S1Open ↗
09/01/2026B00534477-I1Open ↗
▸DOB NOWProgress Inspector Seal & Signature2
08/24/2026B00534477-S1Open ↗
08/24/2026B00534477-S1Open ↗
▸DOB NOWSpecial Inspector Seal & Signature1
08/24/2026B00534477-S1Open ↗
▸Environmental & Asbestos2
▸DOB NOWDEP ACP-5: Asbestos Assessment Report2
09/01/2026B00534477-I1Open ↗
09/01/2026B00534477-S1Open ↗
▸Energy Compliance2
▸DOB NOWEN2: As Built Energy Analysis.2
08/13/2026B00534477-I1Open ↗
08/13/2026B00534477-S1Open ↗