One story - permanent living quarter
270-11 UNION TURNPIKE
QUEENS · BIN 4174287
💬 Discuss this project
1945Year Built
1.5Stories
A2Building Class
R2AZoning
1,118 sfGross Floor Area
1Units
0 Open ViolationsFDNY Report ↗
One story - permanent living quarter · 3,840 sf lot · 0.29 FAR built · Flood zone X
Locations of Work
ArchitectureStructuralPlumbing
Roof3p · 1 filing · 10 docs
Floor 21 filing · 20 docs
Floor 11 filing · 20 docs
Cellar2p · 2 filings · 20 docs
Basement1p · 1 filing · 10 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
HNS CONSTRUCTION103/22/2026
HNJ CONSTRUCTION103/22/2026
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
NY BUILDING ASSOCIATES INC207/31/2025
NASIR J, KHANZADA LLC907/23/2024
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
S R SOLAR DESIGN403/21/2026
NASIR J. KHANZADA LLC1803/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
HNJ CONSTRUCTION CORPGeneral Contractor903/21/2026
LONG ISLAND POWER SOLUTIOGeneral Contractor107/08/2026
SAI JI PLUMBING, INCPlumbing107/08/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
NKM ENGINEERING PLLC6244207/31/2025
NASIR J. KHANZADA LLC1527807/23/2024
Building Lifecycle
All (91)Filed (11)Permit Issued (5)Signed Off (3)Violation (4)Inspection (9)Objection (29)Special Inspection (30)
08/05/2025
Signed off — Alteration
INSTALLATION OF SOLAR PANELS ON EXISTING ROOF. NO CHANGE IN USE, OCCUPANCY, OR EGRESS. NO CHANGE IN BULK
Q01125845-I1
08/05/2025
Special inspection requirement — Air barrier - visual inspection
NARESH MAHANGU
08/05/2025
Special inspection requirement — Fire-Resistant Penetrations and Joints
NARESH MAHANGU
08/05/2025
Special inspection requirement — Structural Stability – Alterations of existing buildings
NARESH MAHANGU
08/05/2025
Special inspection requirement — Final
NARESH MAHANGU
08/05/2025
Special inspection requirement — Energy Code Compliance Inspections
NARESH MAHANGU
07/31/2025
Filed — Alteration
INSTALLATION OF SOLAR PANELS ON EXISTING ROOF. NO CHANGE IN USE, OCCUPANCY, OR EGRESS. NO CHANGE IN BULK
Q01125845-P1
07/31/2025
Special inspection requirement — Energy Code Compliance Inspections
NARESH MAHANGU
07/31/2025
Special inspection requirement — Air barrier - visual inspection
NARESH MAHANGU
07/31/2025
Special inspection requirement — Fire-Resistant Penetrations and Joints
NARESH MAHANGU
07/31/2025
Special inspection requirement — Structural Stability – Alterations of existing buildings
NARESH MAHANGU
07/31/2025
Special inspection requirement — Final
NARESH MAHANGU
03/27/2025
Permit issued — Solar
Q01125845-I1-SL
03/20/2025
Filed — Alteration
INSTALLATION OF SOLAR PANELS ON EXISTING ROOF. NO CHANGE IN USE, OCCUPANCY, OR EGRESS. NO CHANGE IN BULK
Q01125845-I1
12/11/2024
Inspection — Pass-Final CND-Occupancy Inspection
Pass
View inspection ↗
11/12/2024
Inspection — Fail-Final CND-Occupancy Inspection
Fail
View inspection ↗
10/25/2024
Special inspection requirement — Fenestration areas
Nasir Khanzada
10/25/2024
Special inspection requirement — Interior lighting power
Nasir Khanzada
10/25/2024
Special inspection requirement — Structural Wood Frame
Nasir Khanzada
10/25/2024
Special inspection requirement — Insulation placement and R values
Nasir Khanzada
10/25/2024
Special inspection requirement — Fenestration and door U-factor and product ratings
Nasir Khanzada
10/25/2024
Special inspection requirement — Subsurface Investigations (Borings/Test Pits)
Nasir Khanzada
10/25/2024
Special inspection requirement — Subsurface Investigations (Borings/Test Pits)
Nasir Khanzada
10/25/2024
Special inspection requirement — Protection of exposed foundation insulation
Nasir Khanzada
10/25/2024
Special inspection requirement — Fire-Resistant Penetrations and Joints
Nasir Khanzada
10/25/2024
Special inspection requirement — Final
Nasir Khanzada
10/25/2024
Special inspection requirement — Construction Utilizing CLT or SCL, Type IV
Nasir Khanzada
10/25/2024
Special inspection requirement — Fire-Resistance Rated Construction
Nasir Khanzada
10/25/2024
Special inspection requirement — Structural Stability – Alterations of existing buildings
Nasir Khanzada
10/25/2024
Special inspection requirement — Energy Code Compliance Inspections
Nasir Khanzada
10/25/2024
Special inspection requirement — Fenestration air leakage
Nasir Khanzada
10/25/2024
Special inspection requirement — Air barrier - visual inspection
Nasir Khanzada
10/25/2024
Special inspection requirement — Footing and Foundation
Nasir Khanzada
10/25/2024
Special inspection requirement — Private On-Site Storm Water Disposal Systems-, and Detention Facilities, Installation
Nasir Khanzada
10/25/2024
Special inspection requirement — Private On-Site Storm Water Disposal Systems-, and Detention Facilities, Installation
Nasir Khanzada
10/25/2024
Special inspection requirement — Structural Stability – Alterations of existing buildings
Nasir Khanzada
10/11/2024
Objection resolved — Addressed
08/08/2024
Objection raised — Other
07/23/2024
Filed — Alteration CO
APPLICATION FILED TO ADDITION 2ND. FLOOR AT THEEXISTING ATTIC LEVEL WITHREPLACEMENT OF BRICK AND MORTARON THE FRONT FASCIA OF THE SINGLESTORY RESIDENTIAL BUILDING.
Q00841864-P6
04/05/2024
Objection resolved — Addressed
04/05/2024
Objection resolved — Addressed
04/05/2024
Objection resolved — Addressed
04/01/2024
Objection raised — Other
04/01/2024
Objection raised — Other
04/01/2024
Objection raised — Other
04/01/2024
Objection raised — Other
03/28/2024
Filed — Alteration CO
APPLICATION FILED TO ADDITION 2ND. FLOOR AT THEEXISTING ATTIC LEVEL WITHREPLACEMENT OF BRICK AND MORTARON THE FRONT FASCIA OF THE SINGLESTORY RESIDENTIAL BUILDING.
Q00841864-P3
03/08/2024
Signed off — Alteration
APPLICATION FILED TO INSTALL CONSTRUCTION FENCE. IN CINJUNSITION WITH DOB NOW JOB#Q08001487-I1
Q00842457-I1
03/07/2024
Inspection — Pass-Final CND-Occupancy Inspection
Pass
View inspection ↗
03/06/2024
Signed off — Alteration
APPPLICATION FILED TO INSTALLATION FO PLUMBING FIXTURES IN CONJUNCTION WITHALT-1 FILING FOR ADDITION OF SECONDFLOOR.
Q00842465-I1
11/20/2023
Inspection — Pass-Final PL - Up to 3 Requested Floors
Pass
View inspection ↗
11/02/2023
Filed — Alteration
APPPLICATION FILED TO INSTALLATION FO PLUMBING FIXTURES IN CONJUNCTION WITHALT-1 FILING FOR ADDITION OF SECONDFLOOR.
Q00842465-P2
11/02/2023
Violation issued (ECB, closed)
Construction
09/25/2023
Objection resolved — Addressed
09/20/2023
Objection raised — Zoning
09/15/2023
Inspection — Certified Storm Drainage-ST-Piping-Underground
Certified
View inspection ↗
09/12/2023
Filed — Alteration CO
APPLICATION FILED TO ADDITION 2ND. FLOOR AT THEEXISTING ATTIC LEVEL WITHREPLACEMENT OF BRICK AND MORTARON THE FRONT FASCIA OF THE SINGLESTORY RESIDENTIAL BUILDING.
Q00841864-P2
09/01/2023
Objection resolved — Addressed
08/24/2023
Objection resolved — Addressed
08/23/2023
Objection resolved — Addressed
Latest 60 of 91 events.
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWSolarSigned-offLONG ISLAND POWER SOLUTIO03/27/2025
DOB NOWPlumbingSigned-offSAI JI PLUMBING, INC07/26/2023
DOB NOWStructuralSigned-offHNJ CONSTRUCTION CORP06/28/2023
DOB NOWStructuralPermit IssuedHNJ CONSTRUCTION CORP06/28/2023
DOB NOWConstruction FenceSigned-offHNJ CONSTRUCTION CORP05/31/2023
BISPLISSUEDMATIELLO PLBG & HTG INC06/09/2006
BISOTISSUEDIAM CNSTRUCTION INC05/15/2006
2 projects · most recent 10/13/2024
General Wiring Lighting
FiledStatusContractorScope
10/13/2024CompleteCATIZONE ELECTRICAL INC—
02/16/2024CompleteBDS ELECTRIC CORP.General Wiring, Lighting
1 project · most recent 07/23/2024
Wood
FiledStatusContractorScope
07/23/2024Signed-offHNJ CONSTRUCTION CORPWood
▾Field Inspections (DOB CAP) — 9
DateTypeResultReport
12/11/2024Pass-Final CND-Occupancy InspectionPassView ↗
11/12/2024Fail-Final CND-Occupancy InspectionFailView ↗
03/07/2024Pass-Final CND-Occupancy InspectionPassView ↗
11/20/2023Pass-Final PL - Up to 3 Requested FloorsPassView ↗
09/15/2023Certified Storm Drainage-ST-Piping-UndergroundCertifiedView ↗
08/11/2023Certified Gas-Gas-Piping-RoughingCertifiedView ↗
08/11/2023Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
08/11/2023Certified Water and Sanitary-WS-Sanitary Piping-UndergroundCertifiedView ↗
07/28/2023Pass-Final CND-Occupancy InspectionPassView ↗
▾Special Inspection Requirements (DOB NOW) — 95
DateRequirementInspectorRole
08/05/2025Air barrier - visual inspectionNARESH MAHANGUenergy_progress
08/05/2025Energy Code Compliance InspectionsNARESH MAHANGUprogress
08/05/2025FinalNARESH MAHANGUprogress
08/05/2025Fire-Resistant Penetrations and JointsNARESH MAHANGUspecial
08/05/2025Structural Stability – Alterations of existing buildingsNARESH MAHANGUspecial
07/31/2025Air barrier - visual inspectionNARESH MAHANGUenergy_progress
07/31/2025FinalNARESH MAHANGUprogress
07/31/2025Energy Code Compliance InspectionsNARESH MAHANGUprogress
07/31/2025Structural Stability – Alterations of existing buildingsNARESH MAHANGUspecial
07/31/2025Fire-Resistant Penetrations and JointsNARESH MAHANGUspecial
10/25/2024Protection of exposed foundation insulationNasir Khanzadaenergy_progress
10/25/2024Fenestration and door U-factor and product ratingsNasir Khanzadaenergy_progress
10/25/2024Interior lighting powerNasir Khanzadaenergy_progress
10/25/2024Fenestration areasNasir Khanzadaenergy_progress
10/25/2024Insulation placement and R valuesNasir Khanzadaenergy_progress
10/25/2024Air barrier - visual inspectionNasir Khanzadaenergy_progress
10/25/2024Fenestration air leakageNasir Khanzadaenergy_progress
10/25/2024Private On-Site Storm Water Disposal Systems-, and Detention Facilities, InstallationNasir Khanzadaspecial
10/25/2024Structural Stability – Alterations of existing buildingsNasir Khanzadaspecial
10/25/2024Subsurface Investigations (Borings/Test Pits)Nasir Khanzadaspecial
10/25/2024Construction Utilizing CLT or SCL, Type IVNasir Khanzadaspecial
10/25/2024Fire-Resistant Penetrations and JointsNasir Khanzadaspecial
10/25/2024Energy Code Compliance InspectionsNasir Khanzadaprogress
10/25/2024Structural Wood FrameNasir Khanzadaprogress
10/25/2024Footing and FoundationNasir Khanzadaprogress
Latest 25 of 95.
▾Documents — 96 on file (BIS + DOB NOW)
▸Plans & Drawings10
▸DOB NOWPlans/Sketch10
08/25/2026Q00842465-I1Request digital key ↗
08/25/2026Q00842465-P2Request digital key ↗
08/25/2026Q00842457-I1Request digital key ↗
Showing 3 of 10 on file for this type
▸Zoning, Tax Lot & Property Records6
▸DOB NOWZD1: DOB Zoning Diagram5
08/13/2026Q00841864-P2Open ↗
08/13/2026Q00841864-P6Open ↗
08/13/2026Q00841864-I1Open ↗
Showing 3 of 5 on file for this type
▸DOB NOWHouse Number Verification: TOPO Stamp1
08/13/2026Q00841864-I1Open ↗
▸Seals & Professional Certifications37
▸DOB NOWProgress Inspector Seal & Signature14
08/27/2026Q01125845-P1Open ↗
08/27/2026Q01125845-P1Open ↗
08/27/2026Q00841864-P6Open ↗
Showing 3 of 14 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature13
08/27/2026Q01125845-P1Open ↗
08/27/2026Q00841864-P6Open ↗
08/27/2026Q00841864-P6Open ↗
Showing 3 of 13 on file for this type
▸DOB NOWDPL-1: Design Professional Seal & Signature10
08/25/2026Q00842465-P1Open ↗
08/25/2026Q00842465-I1Open ↗
08/25/2026Q00842465-P2Open ↗
Showing 3 of 10 on file for this type
▸Safety & Tenant Protection5
▸DOB NOWStreet Tree Checklist5
08/13/2026Q00841864-P1Open ↗
08/13/2026Q00841864-I1Open ↗
08/13/2026Q00841864-P2Open ↗
Showing 3 of 5 on file for this type
▸Environmental & Asbestos9
▸DOB NOWDEP ACP-5: Asbestos Assessment Report9
08/25/2026Q00842465-I1Open ↗
08/25/2026Q00842465-P2Open ↗
08/21/2026Q00841864-P6Open ↗
Showing 3 of 9 on file for this type
▸Inspections & Test Reports6
▸DOB NOWSOIL REPORT5
08/13/2026Q00841864-P6Open ↗
08/13/2026Q00841864-P3Open ↗
08/13/2026Q00841864-P2Open ↗
Showing 3 of 5 on file for this type
▸DOB NOWTR4 Test Report and Plot Diagram1
08/13/2026Q00841864-I1Open ↗
▸Approvals, Objections & Sign-offs1
▸DOB NOWUtility Company Final Acceptance Letter1
08/13/2026Q01125845-I1Open ↗
▸Other Documents22
▸DOB NOWLocal Law 92/94 of 2019 Sustainable Roof Zone5
08/13/2026Q00841864-P1Open ↗
08/13/2026Q00841864-P3Open ↗
08/13/2026Q00841864-I1Open ↗
Showing 3 of 5 on file for this type
▸DOB NOWSite Survey: Initial5
08/13/2026Q00841864-P1Open ↗
08/13/2026Q00841864-P2Open ↗
08/13/2026Q00841864-P3Open ↗
Showing 3 of 5 on file for this type
▸DOB NOWProperty Ownership Certification5
08/21/2026Q00841864-P6Open ↗
08/21/2026Q00841864-I1Open ↗
08/14/2026Q00841864-P3Open ↗
Showing 3 of 5 on file for this type
▸DOB NOWPlot Diagram5
08/13/2026Q00841864-I1Open ↗
08/13/2026Q00841864-P2Open ↗
08/13/2026Q00841864-P6Open ↗
Showing 3 of 5 on file for this type
▸DOB NOWFinal Survey1
08/13/2026Q00841864-I1Open ↗
▸DOB NOWAdjoining Owners Notification1
08/13/2026Q00841864-I1Open ↗