MASONRY CLADDING INSTALLATION, PARAPET REBUILD, RAILING INSTALATION, BRICK REPLACEMENT, MASONRY RE-POINTING, AND PARTIAL ROOF REPLACEMENT . NO CHANGE IN USE, EGRESS OR OCCUPANCY.
On file for this project
8 documents · 1 drawing sheet
Installation of new & relocated sprinkler heads and piping. New floor drains and roof drains connected to existing sewer, new water closets and lavatories. New gas service from Con Ed, with new gas meter assembly and room, new gas distribution piping.
On file for this project
34 documents · 1 drawing sheet
Installation of new low pressure steam boiler plant, associated equipment and accessories. Installation of new VRF heating and cooling equipment for limited areas. No change in use, egress or occupancy.
On file for this project
17 documents · 2 drawing sheets
Latest 3 of 4 filings on this floor.
Floor 51p · 1 filing · 17 docs
Other
Installation of new low pressure steam boiler plant, associated equipment and accessories. Installation of new VRF heating and cooling equipment for limited areas. No change in use, egress or occupancy.
On file for this project
17 documents · 1 drawing sheet
Floor 4
Floor 38p · 4 filings · 20 docs
ArchitectureDMFire ProtectionMechanicalPlumbingStructural
Installation of new & relocated sprinkler heads and piping. New floor drains and roof drains connected to existing sewer, new water closets and lavatories. New gas service from Con Ed, with new gas meter assembly and room, new gas distribution piping.
On file for this project
34 documents · 3 drawing sheets
Installation of new low pressure steam boiler plant, associated equipment and accessories. Installation of new VRF heating and cooling equipment for limited areas. No change in use, egress or occupancy.
On file for this project
17 documents · 2 drawing sheets
DEMOLITION OF EXISTING INTERIOR MASONRY WALL. SLAB ON METAL DECK INFILL WITH STRUCTURAL STEEL. WELD SPLICING OF EXISTING STEEL BEAMS. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
On file for this project
11 documents · 2 drawing sheets
Latest 3 of 4 filings on this floor.
Floor 25p · 2 filings · 20 docs
DMFire ProtectionPlumbingStructural
Installation of new & relocated sprinkler heads and piping. New floor drains and roof drains connected to existing sewer, new water closets and lavatories. New gas service from Con Ed, with new gas meter assembly and room, new gas distribution piping.
On file for this project
34 documents · 3 drawing sheets
DEMOLITION OF EXISTING INTERIOR MASONRY WALL. SLAB ON METAL DECK INFILL WITH STRUCTURAL STEEL. WELD SPLICING OF EXISTING STEEL BEAMS. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
On file for this project
11 documents · 2 drawing sheets
Floor 16p · 4 filings · 20 docs
DMMechanicalPlumbingStructural
Issued Permit Scope
Boiler Equipment
Project M00434492Permit Issued · 07/19/2021
New Gas Service (1) boiler being installed (a boiler does not currently exist). Two new low pressure steam boilers, gas fired, for space heating. No change in use, egress or occupancy.
Installation of new & relocated sprinkler heads and piping. New floor drains and roof drains connected to existing sewer, new water closets and lavatories. New gas service from Con Ed, with new gas meter assembly and room, new gas distribution piping.
On file for this project
34 documents · 1 drawing sheet
Installation of new low pressure steam boiler plant, associated equipment and accessories. Installation of new VRF heating and cooling equipment for limited areas. No change in use, egress or occupancy.
On file for this project
17 documents · 3 drawing sheets
Latest 3 of 4 filings on this floor.
Cellar6p · 2 filings · 20 docs
DMFire ProtectionPlumbing
Installation of new & relocated sprinkler heads and piping. New floor drains and roof drains connected to existing sewer, new water closets and lavatories. New gas service from Con Ed, with new gas meter assembly and room, new gas distribution piping.
On file for this project
34 documents · 5 drawing sheets
Installation of new low pressure steam boiler plant, associated equipment and accessories. Installation of new VRF heating and cooling equipment for limited areas. No change in use, egress or occupancy.