← Back
Two family brick
270 91 STREET
BROOKLYN · BIN 3154694
💬 Discuss this project
1925Year Built
2Stories
B1Building Class
R4-1Zoning
2,312 sfGross Floor Area
2Units
Rent Stabilized0 Open ViolationsFDNY Report ↗
Two family brick · 2,000 sf lot · 1.16 FAR built · Flood zone X
Locations of Work
ArchitecturePlumbing
Cellar4p · 1 filing · 10 docs
▾Sales History (ACRIS)
DatePriceUnitSeller → Buyer$/sf
02/15/2024$1.2M—Private party → Private party$510/sf building
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
NIC 88 CORP212/27/2024
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
BASIC GROUPS203/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
CUBE BUILDERS GROUP NYGeneral Contractor404/09/2026
PIPESTYLISTS, INCPlumbing207/08/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
NIC DESIGN INC9758212/27/2024
Building Lifecycle
All (26)Filed (2)Permit Issued (4)Signed Off (2)Violation (4)Inspection (3)Special Inspection (11)
03/20/2026
Signed off — Alteration
Remove and cap bathroom and kitchen fixtures in the existing 2 story building. Plumbing works as per plan. No change in egress, use, or occupancy.
B01151555-S1
03/20/2026
Signed off — Alteration
Remove and cap bathroom and kitchen fixtures in the existing 2 story building. Plumbing works as per plan. No change in egress, use, or occupancy.
B01151555-I1
11/28/2025
Inspection — Certified Water and Sanitary-WS-Fixtures-Finish
Certified
View inspection ↗
11/26/2025
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Roughing
Certified
View inspection ↗
09/18/2025
Inspection — Certified Remove/Cap - work done in accordance with code
Certified
View inspection ↗
07/22/2025
Permit issued — General Construction
B01151555-I1-GC-CX
07/01/2025
Permit issued — Plumbing
B01151555-S1-PL
03/10/2025
Violation issued (ECB, closed)
Construction
03/10/2025
Violation issued (ECB, closed)
Construction
02/10/2025
Violation issued (HPD, closed)
I
02/09/2025
Violation issued (HPD, closed)
C
12/27/2024
Filed — Alteration
Remove and cap bathroom and kitchen fixtures in the existing 2 story building. Plumbing works as per plan. No change in egress, use, or occupancy.
B01151555-S1
12/27/2024
Permit issued — Plumbing
B01151555-S1-PL
12/24/2024
Special inspection requirement — Fire-Resistant Penetrations and Joints
Eric Sun
12/23/2024
Permit issued — Mechanical Systems
B01151555-I1-GC-CX
12/19/2024
Filed — Alteration
Remove and cap bathroom and kitchen fixtures in the existing 2 story building. Plumbing works as per plan. No change in egress, use, or occupancy.
B01151555-I1
12/05/2024
Special inspection requirement — Fire-Resistant Penetrations and Joints
Eric Sun
12/05/2024
Special inspection requirement — Mechanical Systems
Eric Sun
12/05/2024
Special inspection requirement — Energy Code Compliance Inspections
Eric Sun
12/05/2024
Special inspection requirement — Fire-Resistance Rated Construction
Eric Sun
12/05/2024
Special inspection requirement — Final
Eric Sun
12/05/2024
Special inspection requirement — HVAC-R and service water piping design and insulation
Eric Sun
12/05/2024
Special inspection requirement — HVAC-R and service water heating equipment
Eric Sun
12/05/2024
Special inspection requirement — HVAC-R and service water heating system controls
Eric Sun
12/05/2024
Special inspection requirement — Maintenance information
Eric Sun
12/05/2024
Special inspection requirement — Duct leakage testing, insulation and design
Eric Sun
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWGeneral ConstructionSigned-offCUBE BUILDERS GROUP NY07/22/2025
DOB NOWPlumbingSigned-offT & T PLUMBING INC07/01/2025
DOB NOWPlumbingSigned-offT & T PLUMBING INC12/27/2024
DOB NOWMechanical SystemsSigned-offCUBE BUILDERS GROUP NY12/23/2024
2 projects · most recent 09/13/2025
General Wiring
FiledStatusContractorScope
09/13/2025CompleteJ Y ELECTRIC INCGeneral Wiring
04/01/2025CompleteJ Y ELECTRIC INCGeneral Wiring
▾Field Inspections (DOB CAP) — 3
DateTypeResultReport
11/28/2025Certified Water and Sanitary-WS-Fixtures-FinishCertifiedView ↗
11/26/2025Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
09/18/2025Certified Remove/Cap - work done in accordance with codeCertifiedView ↗
▾Special Inspection Requirements (DOB NOW) — 11
DateRequirementInspectorRole
12/24/2024Fire-Resistant Penetrations and JointsEric Sunspecial
12/05/2024Fire-Resistant Penetrations and JointsEric Sunspecial
12/05/2024Mechanical SystemsEric Sunspecial
12/05/2024Energy Code Compliance InspectionsEric Sunprogress
12/05/2024Fire-Resistance Rated ConstructionEric Sunprogress
12/05/2024FinalEric Sunprogress
12/05/2024HVAC-R and service water piping design and insulationEric Sunenergy_progress
12/05/2024HVAC-R and service water heating equipmentEric Sunenergy_progress
12/05/2024HVAC-R and service water heating system controlsEric Sunenergy_progress
12/05/2024Maintenance informationEric Sunenergy_progress
12/05/2024Duct leakage testing, insulation and designEric Sunenergy_progress
▾Documents — 10 on file (BIS + DOB NOW)
▸Plans & Drawings2
▸DOB NOWPlans/Sketch2
08/23/2026B01151555-I1Request digital key ↗
08/23/2026B01151555-S1Request digital key ↗
▸Seals & Professional Certifications6
▸DOB NOWDPL-1: Design Professional Seal & Signature2
08/23/2026B01151555-I1Open ↗
08/23/2026B01151555-S1Open ↗
▸DOB NOWProgress Inspector Seal & Signature2
08/24/2026B01151555-I1Open ↗
08/24/2026B01151555-I1Open ↗
▸DOB NOWSpecial Inspector Seal & Signature2
08/27/2026B01151555-S1Open ↗
08/24/2026B01151555-I1Open ↗
▸Environmental & Asbestos2
▸DOB NOWDEP ACP-5: Asbestos Assessment Report2
08/23/2026B01151555-S1Open ↗
08/23/2026B01151555-I1Open ↗