Two family brick
270 MAC DOUGAL STREET
BROOKLYN · BIN 3041716
💬 Discuss this project
1899Year Built
2Stories
B1Building Class
R6Zoning
1,980 sfGross Floor Area
2Units
Two family brick · 1,800 sf lot · 1.1 FAR built · Flood zone X
Locations of Work
No floor-level scope or drawing coverage on file for this building.
▾Sales History (ACRIS)
DatePriceUnitSeller → Buyer$/sf
07/22/2021$1.1M—— → —$538/sf building
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
ALMA ENGINEERING, PC201/13/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
NORTHSHORE INDUSTRIES INCGeneral Contractor303/21/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
ALMA ENGINEERING, P.C.7833201/13/2026
Building Lifecycle
All (17)Filed (2)Permit Issued (1)Signed Off (1)Objection (10)Special Inspection (3)
03/03/2026
Signed off — Alteration
Replacing the cellar's deteriorated wooden girder with a steel beam-column system. Doubling a few termite-damaged floor joists in the cellar.
B01243623-I1
02/24/2026
Objection resolved — Addressed
02/24/2026
Special inspection requirement — Structural Stability – Alterations of existing buildings
SAHAND AINECHI
02/24/2026
Special inspection requirement — Structural Steel - Details
SAHAND AINECHI
02/24/2026
Special inspection requirement — Final
SAHAND AINECHI
01/30/2026
Objection raised — Admin
01/13/2026
Filed — Alteration
Replacing the cellar's deteriorated wooden girder with a steel beam-column system. Doubling a few termite-damaged floor joists in the cellar.
B01243623-P1
01/06/2026
Permit issued — Structural
B01243623-I1-GC-CX
08/20/2025
Objection resolved — Addressed
08/04/2025
Objection resolved — Addressed
08/04/2025
Objection resolved — Addressed
08/04/2025
Objection resolved — Addressed
07/28/2025
Objection raised — Structural
07/28/2025
Objection raised — Structural
07/28/2025
Objection raised — Structural
07/28/2025
Objection raised — Structural
07/14/2025
Filed — Alteration
Replacing the cellar's deteriorated wooden girder with a steel beam-column system. Doubling a few termite-damaged floor joists in the cellar.
B01243623-I1
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWStructuralSigned-offNORTHSHORE INDUSTRIES INC01/06/2026
Nothing on file for this building.
▾Special Inspection Requirements (DOB NOW) — 3
DateRequirementInspectorRole
02/24/2026Structural Stability – Alterations of existing buildingsSAHAND AINECHIspecial
02/24/2026Structural Steel - DetailsSAHAND AINECHIspecial
02/24/2026FinalSAHAND AINECHIprogress
▾Documents — 9 on file (BIS + DOB NOW)
▸Plans & Drawings2
▸DOB NOWPlans/Sketch2
08/21/2026B01243623-I1Request digital key ↗
08/21/2026B01243623-P1Request digital key ↗
▸Seals & Professional Certifications5
▸DOB NOWDPL-1: Design Professional Seal & Signature2
08/21/2026B01243623-I1Open ↗
08/21/2026B01243623-P1Open ↗
▸DOB NOWSpecial Inspector Seal & Signature2
09/02/2026B01243623-I1Open ↗
09/02/2026B01243623-I1Open ↗
▸DOB NOWProgress Inspector Seal & Signature1
09/02/2026B01243623-I1Open ↗
▸Environmental & Asbestos2
▸DOB NOWDEP ACP-5: Asbestos Assessment Report2
08/21/2026B01243623-I1Open ↗
08/21/2026B01243623-P1Open ↗