Miscellaneous educational facility
Congregation Bnai Jeshurun Community House
270 WEST 89 STREET · BIN 1033304
💬 Discuss this project
1928Year Built
6Stories
W9Building Class
R10AZoning
46,153 sfGross Floor Area
1Units
LL97 Covered5 Open Violations ▸FISP: UNSAFEFDNY Report ↗
Miscellaneous educational facility · 7,855 sf lot · 5.88 FAR built · Flood zone X
Locations of Work
ArchitecturePlumbing
Roof3p · 1 filing · 11 docs
Floor 67p · 1 filing · 9 docs
Floor 59p · 2 filings · 17 docs
Floor 47p · 1 filing · 9 docs
Floor 37p · 1 filing · 9 docs
Floor 212p · 3 filings · 20 docs
Floor 18p · 1 filing · 9 docs
Mezzanine7p · 1 filing · 9 docs
Basement7p · 1 filing · 9 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
SPRING SCAFFOLDING LLC1103/22/2026
PLATINUM SERVICES NY503/22/2026
HESCHEL SCHOOL203/22/2026
ABRAHAM J. HERCHEL SCHOOL403/22/2026
ABRAHAM JOSHUA HESCHEL SCHOOL403/22/2026
ROCK GROUP NY1803/21/2026
ABRAM JOSHA MESCHEL SCHOOL403/21/2026
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
URBAN INTEGRATIONS206/21/2023
HOWARD L ZIMMERMAN ARCH & ENG DPC403/21/2023
ASHRAF CORP103/08/2023
ARCHITECTURE OUTFIT PLLC203/06/2023
PAUL PERDEK, PROF. ENG. PLLC107/15/2020
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
JAM CONSULTANTS, INC.803/21/2026
HLZAE203/21/2026
GREEN STUDIO203/21/2026
UNITED SAFETY CONSULTANTS203/21/2026
AE DESIGN SOLUTION203/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
TAURINO MANAGEMENT, INCGeneral Contractor1203/21/2026
ADLER WINDOWS INCGeneral Contractor1007/08/2026
SPRING SCAFFOLDING LLCGeneral Contractor903/21/2026
GEORGE BASSOLINOPlumbing303/21/2026
PLATINUM SERVICES NY LLCGeneral Contractor303/21/2026
MITACEK, JOHNElectrical103/21/2026
ABDUL AZIZElectrical103/21/2026
SKYLINE RESTORATION INCGeneral Contractor107/08/2026
MELVYN ZWEBNERElectrical103/21/2026
AZIZ ABDULElectrical103/21/2026
ACCESS PLUMBING CORPPlumbing107/08/2026
ROOPCHAND SINGHElectrical103/21/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
DELTA TESTING LABS687203/21/2023
Building Lifecycle
All (142)Filed (10)Permit Issued (14)Signed Off (6)Facade (FISP) (15)Violation (60)Inspection (7)Objection (24)Special Inspection (6)
04/09/2026
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
09/17/2025
Violation issued (FDNY_ORDER, closed)
09/17/2025
Violation issued (FDNY_ORDER, closed)
09/17/2025
Violation issued (FDNY_ORDER, closed)
09/17/2025
Violation issued (FDNY_ORDER, closed)
09/17/2025
Violation issued (FDNY_NOV, closed)
09/17/2025
Violation issued (FDNY_NOV, closed)
07/17/2025
Violation issued (FDNY_ORDER, closed)
03/18/2025
Inspection — Pass-Final CND-Occupancy Inspection
Pass
View inspection ↗
03/12/2025
Signed off — Alteration
Restoration and replacement of historic wooden and steel frame windows and doors. No change to use, egress, or occupancy.
M00800578-I1
12/10/2024
Cycle 9 facade report submitted
12/10/2024
Cycle 9 facade report signed — UNSAFE
12/04/2024
Cycle 9 facade inspection completed
12/01/2024
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
10/18/2024
Signed off — Alteration
PLUMBING WORK ASSOCIATED WITH RENOVATIONS AS PER PLANS FILED HEREWITH.
M00841813-I1
10/15/2024
Violation issued (FDNY_NOV, closed)
09/16/2024
Violation issued (FDNY_ORDER, closed)
09/16/2024
Violation issued (FDNY_NOV, closed)
09/16/2024
Violation issued (FDNY_NOV, closed)
08/15/2024
Violation issued (FDNY_NOV, closed)
08/02/2024
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
07/01/2024
Permit issued — General Construction
M00800578-I1-GC
05/02/2024
Violation issued (FDNY_NOV, closed)
05/02/2024
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
02/22/2024
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
02/14/2024
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Roughing
Certified
View inspection ↗
02/14/2024
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Underground
Certified
View inspection ↗
02/07/2024
Violation issued (FDNY_NOV, closed)
02/01/2024
Permit issued — General Construction
M00800578-I1-GC
01/02/2024
Permit issued — General Construction
M00837143-I1-GC
12/26/2023
Permit issued — General Construction
M00800578-I1-GC
12/13/2023
Violation issued (FDNY_NOV, closed)
12/13/2023
Violation issued (FDNY_NOV, closed)
12/01/2023
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
11/16/2023
Violation issued (FDNY_NOV, closed)
11/08/2023
Permit issued — General Construction
M00800578-I1-GC
11/02/2023
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
09/19/2023
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
09/07/2023
Violation issued (FDNY_NOV, closed)
09/04/2023
Signed off — Alteration
INSTALLATION OF PIPE SCAFFOLDING AS PER PLANS. PIPE SCAFFOLDING SHALL COMPLY WITH CHAPTER #33 OF THE 2022 CODE. NO CHANGE IN USE, EGRESS OR OCCUPANCY UNDER THIS APPLICATION.
M00835688-I1
08/16/2023
Signed off — Alteration
PIPE SCAFFOLDING INSTALLED PER PLANS, NO CHANGE IN USE, EGRESS OR OCCUPANCY
M00548254-I1
08/02/2023
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
07/27/2023
Signed off — Alteration
REMOVAL OF STALL PARTITIONS AT 5TH FL RESTROOM, INSTALL OF NEW TOILET, INSTALL NEW FULL-HEIGHT STALL PARTITIONS, RELOCATE OF LIGHTING FIXTURE AND ASSOCIATED PATCHING AND REPAIR OF FINISHES. NO CHANGE TO USE EGRESS NOR OCCUPANCY
M00837073-I1
07/27/2023
Signed off — Alteration
MECHANICAL WORK ASSOCIATED WITH INTERIOR RENOVATION AS PER PLANS FILED HEREWITH.
M00841786-I1
07/25/2023
Inspection — Certified Water and Sanitary-WS-Fixtures-Finish
Certified
View inspection ↗
07/25/2023
Inspection — Pass-Final CND-Occupancy Inspection
Pass
View inspection ↗
07/12/2023
Inspection — Certified Remove/Cap - work done in accordance with code
Certified
View inspection ↗
07/10/2023
Permit issued — Mechanical Systems
M00841786-I1-MS
07/05/2023
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Roughing
Certified
View inspection ↗
06/26/2023
Permit issued — Plumbing
M00841813-I1-PL
06/21/2023
Filed — Alteration
PIPE SCAFFOLDING INSTALLED PER PLANS, NO CHANGE IN USE, EGRESS OR OCCUPANCY
M00548254-P1
06/13/2023
Permit issued — General Construction
M00837143-I1-GC
06/12/2023
Objection resolved — Addressed
06/12/2023
Objection resolved — Addressed
06/12/2023
Objection resolved — Addressed
06/12/2023
Objection resolved — Addressed
06/12/2023
Objection resolved — Addressed
06/02/2023
Permit issued — Supported Scaffold
M00548254-I1-SF
05/12/2023
Violation issued (FDNY_NOV, closed)
05/02/2023
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
Latest 60 of 142 events.
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWGeneral ConstructionSigned-offADLER WINDOWS INC07/01/2024
DOB NOWGeneral ConstructionSigned-offADLER WINDOWS INC02/01/2024
DOB NOWGeneral ConstructionPermit IssuedTAURINO MANAGEMENT, INC01/02/2024
DOB NOWGeneral ConstructionSigned-offADLER WINDOWS INC12/26/2023
DOB NOWGeneral ConstructionSigned-offADLER WINDOWS INC11/08/2023
DOB NOWMechanical SystemsSigned-offTAURINO MANAGEMENT, INC07/10/2023
DOB NOWPlumbingSigned-offACCESS PLUMBING CORP06/26/2023
DOB NOWGeneral ConstructionPermit IssuedTAURINO MANAGEMENT, INC06/13/2023
DOB NOWSupported ScaffoldSigned-offSPRING SCAFFOLDING LLC06/02/2023
DOB NOWGeneral ConstructionSigned-offTAURINO MANAGEMENT, INC04/28/2023
DOB NOWSupported ScaffoldSigned-offPLATINUM SERVICES NY LLC03/09/2023
DOB NOWSupported ScaffoldSigned-offSPRING SCAFFOLDING LLC06/03/2022
DOB NOWSupported ScaffoldSigned-offSPRING SCAFFOLDING LLC06/28/2021
DOB NOWSupported ScaffoldPermit IssuedSKYLINE RESTORATION INC07/16/2020
BISEQISSUEDPLATINUM SERVICES NY LLC03/10/2026
BISEQISSUEDPLATINUM SERVICES NY LLC03/14/2025
BISEQISSUEDPLATINUM SERVICES NY LLC03/14/2024
BISOTISSUEDSKYLINE RESTORATION INC02/19/2024
BISEQISSUEDPLATINUM SERVICES NY LLC03/02/2023
BISOTISSUEDSKYLINE RESTORATION INC02/16/2023
BISEQISSUEDPLATINUM SERVICES NY LLC03/01/2022
BISOTISSUEDSKYLINE RESTORATION INC02/18/2022
BISEQISSUEDROCK GROUP NY CORP03/03/2021
BISEQISSUEDROCK GROUP NY CORP03/02/2021
BISOTISSUEDSKYLINE RESTORATION INC03/01/2021
BISEQISSUEDROCK GROUP NY CORP03/10/2020
BISOTISSUEDSKYLINE RESTORATION INC02/28/2020
BISEQISSUEDROCK GROUP NY CORP02/27/2020
BISOTISSUEDSKYLINE RESTORATION INC06/20/2019
BISEQISSUEDROCK GROUP NY CORP03/27/2019
BISEQISSUEDROCK GROUP NY CORP03/22/2019
BISEQISSUEDROCK GROUP NY CORP03/27/2018
BISEQISSUEDROCK GROUP NY CORP01/18/2018
BISOTISSUEDSATO CONSTRUCTION CO.INC01/05/2018
BISMHISSUEDQUADRANT DEVELOPMENT10/12/2017
BIS—ISSUEDWESTERMAN CONSTRUCTION CO08/02/2017
BISMHISSUEDWESTERMAN CONSTRUCTION CO07/21/2017
BISOTISSUEDWESTERMAN CONSTRUCTION CO07/21/2017
BISSPISSUEDTRISTATE PLBG SVCS CORP07/13/2017
BISPLISSUEDTRISTATE PLBG SVCS CORP07/13/2017
+ 24 more permits on file
5 projects · most recent 06/20/2024
General Wiring
FiledStatusContractorScope
06/20/2024CompleteJTE ELECTRICAL SERVICES—
12/26/2023Permit IssuedILLUMINOUS ELECTRIC CORP.General Wiring
05/25/2023CompleteEMPIRE STATE ELECTL CORPGeneral Wiring
07/29/2020CompleteENNELL GRP ELECTRIC CORPGeneral Wiring
02/08/2019Permit IssuedNEE ELECTRICAL, LLCGeneral Wiring
1 project · most recent 07/15/2020
Scaffold
FiledStatusContractorScope
07/15/2020Permit IssuedSKYLINE RESTORATION INCScaffold
▾Field Inspections (DOB CAP) — 7
DateTypeResultReport
03/18/2025Pass-Final CND-Occupancy InspectionPassView ↗
02/14/2024Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
02/14/2024Certified Water and Sanitary-WS-Sanitary Piping-UndergroundCertifiedView ↗
07/25/2023Certified Water and Sanitary-WS-Fixtures-FinishCertifiedView ↗
07/25/2023Pass-Final CND-Occupancy InspectionPassView ↗
07/12/2023Certified Remove/Cap - work done in accordance with codeCertifiedView ↗
07/05/2023Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
▾Special Inspection Requirements (DOB NOW) — 6
DateRequirementInspectorRole
03/09/2023Fire-Resistant Penetrations and JointsRICHARD GREENWALDspecial
03/09/2023Post-installed AnchorsRICHARD GREENWALDspecial
03/09/2023Mechanical SystemsRICHARD GREENWALDspecial
03/09/2023Post-installed AnchorsRICHARD GREENWALDspecial
03/09/2023FinalRICHARD GREENWALDprogress
03/01/2023Finalmarta sandersprogress
▾Documents — 394 on file (BIS + DOB NOW)
▸Plans & Drawings10
▸DOB NOWPlans/Sketch9
09/03/2026M00548254-I1Request digital key ↗
09/03/2026M00548254-P1Request digital key ↗
09/01/2026M00800578-P1Request digital key ↗
Showing 3 of 9 on file for this type
▸DOB NOWPlans/Sketch - Supported Scaffold1
09/04/2026M00366813-I1Request digital key ↗
▸Applications & Permits88
▸BISPLAN / WORK APPROVAL APPLICATION46
06/21/2023122885039Open ↗
04/25/2023122885039Open ↗
08/05/2021140591321Open ↗
Showing 3 of 46 on file for this type
▸BISWORK PERMIT APPLICATION28
03/17/2025140591321Open ↗
03/14/2024140591321Open ↗
03/02/2023140591321Open ↗
Showing 3 of 28 on file for this type
▸DOB NOWLPC Approval/Permit6
08/13/2026M00800578-P1Open ↗
08/13/2026M00841786-I1Open ↗
08/13/2026M00841813-I1Open ↗
Showing 3 of 6 on file for this type
▸BISPLACE OF ASSEMBLY4
07/19/2017122922258Open ↗
06/26/2017122922258Open ↗
06/23/2017122922258Open ↗
Showing 3 of 4 on file for this type
▸BISCERTIFICATE OF OCCUPANCY: APPLICATION1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸BISPLACE OF ASSEMBLY SIGN OFF1
07/19/2017122922258Open ↗
▸BISPLACE OF ASSEMBLY APPLICATION1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸BISPLAN - WORK & PERMITS - SUPPPORTING DOCUMENTATION1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸Seals & Professional Certifications69
▸BISTECHNICAL REPORT: RESPONSIBILITY/CERTIFICATION32
12/19/2019123068651Open ↗
12/19/2019123068651Open ↗
07/24/2019123898158Open ↗
Showing 3 of 32 on file for this type
▸BISPROFESSIONAL CERTIFICATION STATEMENT10
07/17/2019123898158Open ↗
06/28/2019123898158Open ↗
08/18/2017123351023Open ↗
Showing 3 of 10 on file for this type
▸DOB NOWDPL-1: Design Professional Seal & Signature10
09/03/2026M00548254-I1Open ↗
09/03/2026M00548254-P1Open ↗
09/01/2026M00800578-I1Open ↗
Showing 3 of 10 on file for this type
▸BISPROFESSIONAL CERTIFIED CHECKLIST7
06/28/2019123898158Open ↗
08/18/2017123351023Open ↗
Showing 2 of 7 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature4
08/22/2026M00841786-I1Open ↗
08/22/2026M00841786-I1Open ↗
08/22/2026M00841813-I1Open ↗
Showing 3 of 4 on file for this type
▸BISTECHNICAL REPORT STATEMENT OF RESPONSIBILITY2
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 2 on file for this type
▸BISREQUIRED ITEMS CHECKLIST FOR PROFESSIONAL CERTIFICATION2
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 2 on file for this type
▸DOB NOWProgress Inspector Seal & Signature2
08/25/2026M00837073-I1Open ↗
08/22/2026M00841786-I1Open ↗
▸Trade Schedules & Equipment14
▸BISSCHEDULE B - PLUMBING/SPRINKLER/STANDPIPE7
08/18/2017123351023Open ↗
Showing 1 of 7 on file for this type
▸BISEQUIPMENT USE APPLICATION/PERMIT2
10/12/2018123351023Open ↗
10/12/2018123351023Open ↗
▸BISSELF-CERT PLUMBING NOTICE2
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 2 on file for this type
▸BISFA - FDNY APPROVAL : FD-FAA2
08/15/2018123054960Open ↗
Showing 1 of 2 on file for this type
▸BISEQUIPMENT USE PERMITS1
10/12/2018123351023Open ↗
▸Safety & Tenant Protection4
▸BISSTREET TREE CHECKLIST1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸BISTenant Protection Plan and Notes1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸DOB NOWParks Department Acknowledgment Letter for Street Trees Plan1
08/13/2026M00837143-I1Open ↗
▸DOB NOWStreet Tree Checklist1
08/31/2026M00837143-I1Open ↗
▸Environmental & Asbestos15
▸BISASBESTOS: CERTIFICATION (DEP ACP5)9
01/22/2019123068651Open ↗
08/18/2017123351023Open ↗
07/05/2017122875497Open ↗
Showing 3 of 9 on file for this type
▸DOB NOWDEP ACP-5: Asbestos Assessment Report4
08/31/2026M00837143-I1Open ↗
08/14/2026M00837073-I1Open ↗
08/13/2026M00841786-I1Open ↗
Showing 3 of 4 on file for this type
▸BISASBESTOS: COMPLETION OR CLOSEOUT (ACP20/21/5)1
01/24/2019123068651Open ↗
▸DOB NOWDEP ACP-20/ACP-21: Asbestos Project Conditional Completion Form/Asbestos Project Completion Form1
08/15/2026M00800578-I1Open ↗
▸Energy Compliance7
▸BISTECHNICAL REPORT: ENERGY CODE PROGRESS INSPS5
07/24/2019123898158Open ↗
06/28/2019123898158Open ↗
06/20/2017121961485Open ↗
Showing 3 of 5 on file for this type
▸BISAS-BUILT ENERGY ANALYSIS2
05/11/2020123898158Open ↗
06/20/2017121961485Open ↗
▸Inspections & Test Reports5
▸BISTECHNICAL REPORT: RESPONSIBILITY5
05/10/2023122885039Open ↗
05/11/2020123898158Open ↗
05/11/2020123898158Open ↗
Showing 3 of 5 on file for this type
▸Approvals, Objections & Sign-offs79
▸BISCERTIFICATE OF OCCUPANCY/LOC: REQUEST28
02/22/2021121185868Open ↗
05/14/2020123898158Open ↗
05/11/2020123898158Open ↗
Showing 3 of 28 on file for this type
▸BISLANDMARKS APPROVAL12
03/21/2025122885039Open ↗
12/16/2019123898158Open ↗
01/24/2019123068651Open ↗
Showing 3 of 12 on file for this type
▸BISLETTERS - SUPPORTING DOCUMENTATION10
03/14/2024140591321Open ↗
03/02/2023140591321Open ↗
03/02/2022140591321Open ↗
Showing 3 of 10 on file for this type
▸BISSCHEDULE A - OCCUPANCY / USE10
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 10 on file for this type
▸BISSHED LETTER8
03/14/2024140591321Open ↗
03/02/2023140591321Open ↗
03/02/2022140591321Open ↗
Showing 3 of 8 on file for this type
▸DOB NOWFee Exempt Supporting Document - DOF ACRIS report or BIB letter7
08/31/2026M00837143-I1Open ↗
08/13/2026M00800578-I1Open ↗
08/13/2026M00837073-I1Open ↗
Showing 3 of 7 on file for this type
▸BISSUPERSEDING LETTER3
03/17/2025140591321Open ↗
06/20/2019122885039Open ↗
08/10/2017121185868Open ↗
▸BISCONSTRUCTION CODE DETERMINATION1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸Cost, Insurance & Ownership22
▸BISCOST AFFIDAVIT21
04/25/2023122885039Open ↗
05/11/2020123898158Open ↗
06/28/2019123898158Open ↗
Showing 3 of 21 on file for this type
▸BISDEPT OF FINANCE VERIFICATION1
05/08/2019121185868Open ↗
▸Filing & Intake Forms59
▸BISBOROUGH INTAKE FORM27
03/17/2025140591321Open ↗
05/01/2020121185868Open ↗
01/27/2020121185868Open ↗
Showing 3 of 27 on file for this type
▸BISADDITIONAL INFORMATION19
03/21/2025122885039Open ↗
05/11/2023122885039Open ↗
08/05/2021140591321Open ↗
Showing 3 of 19 on file for this type
▸BISEFILING COVER SHEET11
06/28/2019123898158Open ↗
08/18/2017123351023Open ↗
07/26/2017123332321Open ↗
Showing 3 of 11 on file for this type
▸BISEFILING JOB APPLICATION COVER SHEET2
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 2 on file for this type
▸Other Documents22
▸BISEXTERNAL FORMS - SUPPORTING DOCUMENTATION12
06/28/2019123898158Open ↗
07/26/2017123332321Open ↗
07/19/2017122922258Open ↗
Showing 3 of 12 on file for this type
▸DOB NOWProof of Historic Building6
08/13/2026M00841786-I1Open ↗
08/13/2026M00837143-I1Open ↗
08/13/2026M00841813-I1Open ↗
Showing 3 of 6 on file for this type
▸BISSEPTIC - SUPPORTING DOCUMENTATION1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸BISPlot Diagram1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸BISUnknown1
12/19/2019123068651Open ↗
▸DOB NOWProperty Ownership Certification1
08/31/2026M00837143-I1Open ↗