Congregation Bnai Jeshurun Community House
270 WEST 89TH STREET · BIN 1033304
💬 Discuss this project
1928Year Built
6Stories
W9Building Class
R10AZoning
46,153 sfGross Floor Area
1Units
LL97 Covered2 Active Violations 3 old, status unconfirmed ▸FISP: UNSAFEFDNY Report ↗
Miscellaneous educational facility · 7,855 sf lot · 5.88 FAR built · Flood zone X
Locations of Work
ArchitectureStructuralElectricalMechanicalPlumbingGeneral
Names shown beside floors are taken automatically from the text of filed documents and may be incomplete or wrong.
RoofBnai Jeshurun3p · 1 filing · 11 docs
Floor 6Bnai Jeshurun42p · 2 filings · 20 docs
Floor 5Bnai Jeshurun49p · 4 filings · 20 docs
Floor 4Bnai Jeshurun42p · 2 filings · 20 docs
Floor 3Bnai Jeshurun42p · 2 filings · 20 docs
Floor 2Bnai Jeshurun54p · 4 filings · 20 docs
Floor 1Bnai Jeshurun45p · 3 filings · 20 docs
MezzanineBnai Jeshurun7p · 1 filing · 9 docs
BasementBnai Jeshurun7p · 1 filing · 9 docs
Site & exteriorPipe scaffolding installation11p · 3 filings · 9 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
Abram Josha Meschel School603/21/2026
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
Urban Integrations206/21/2023
Howard L Zimmerman Arch & Engineering403/21/2023
Ashraf103/08/2023
Architecture Outfit203/06/2023
Paul Perdek, Prof. Engineering107/15/2020
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
J.A.M. Associates803/21/2026
Hlzae203/21/2026
Green Studio203/21/2026
United Safety Consultants203/21/2026
AE Design Solution203/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
Taurino ManagementGeneral Contractor1203/21/2026
Adler Windowsspecialty_contractor1007/08/2026
Spring ScaffoldingScaffold903/21/2026
George BassolinoPlumbing303/21/2026
Platinum Services NYScaffold303/21/2026
Skyline RestorationScaffold107/08/2026
GT Electrical CompanyElectrical103/21/2026
Access PlumbingPlumbing107/08/2026
Aziz AbdulElectrical103/21/2026
Illuminous ElectricElectrical103/21/2026
Megan Electrical Enterp'sElectrical103/21/2026
Wise Electric SolutionsElectrical103/21/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
Delta Testing Labs687203/21/2023
Building Lifecycle
All (140)Filed (10)Permit Issued (14)Signed Off (6)Facade (FISP) (15)Violation (60)Inspection (5)Objection (24)Special Inspection (6)
04/09/2026
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
09/17/2025
Violation issued (FDNY_ORDER, closed)
09/17/2025
Violation issued (FDNY_ORDER, closed)
09/17/2025
Violation issued (FDNY_ORDER, closed)
09/17/2025
Violation issued (FDNY_ORDER, closed)
09/17/2025
Violation issued (FDNY_NOV, closed)
09/17/2025
Violation issued (FDNY_NOV, closed)
07/17/2025
Violation issued (FDNY_ORDER, closed)
03/18/2025
Inspection — Pass-Final CND-Occupancy Inspection
Pass
View inspection ↗
03/12/2025
Signed off — Alteration
Restoration and replacement of historic wooden and steel frame windows and doors. No change to use, egress, or occupancy.
M00800578-I1
12/10/2024
Cycle 9 facade report submitted
12/10/2024
Cycle 9 facade report signed — UNSAFE
12/04/2024
Cycle 9 facade inspection completed
12/01/2024
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
10/18/2024
Signed off — Alteration
PLUMBING WORK ASSOCIATED WITH RENOVATIONS AS PER PLANS FILED HEREWITH.
M00841813-I1
10/15/2024
Violation issued (FDNY_NOV, closed)
09/16/2024
Violation issued (FDNY_ORDER, closed)
09/16/2024
Violation issued (FDNY_NOV, closed)
09/16/2024
Violation issued (FDNY_NOV, closed)
08/15/2024
Violation issued (FDNY_NOV, closed)
08/02/2024
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
07/01/2024
Permit issued — General Construction
M00800578-I1-GC
05/02/2024
Violation issued (FDNY_NOV, closed)
05/02/2024
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
02/22/2024
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
02/07/2024
Violation issued (FDNY_NOV, closed)
02/01/2024
Permit issued — General Construction
M00800578-I1-GC
01/02/2024
Permit issued — General Construction
M00837143-I1-GC
12/26/2023
Permit issued — General Construction
M00800578-I1-GC
12/13/2023
Violation issued (FDNY_NOV, closed)
12/13/2023
Violation issued (FDNY_NOV, closed)
12/01/2023
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
11/16/2023
Violation issued (FDNY_NOV, closed)
11/08/2023
Permit issued — General Construction
M00800578-I1-GC
11/02/2023
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
09/19/2023
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
09/07/2023
Violation issued (FDNY_NOV, closed)
09/04/2023
Signed off — Alteration
INSTALLATION OF PIPE SCAFFOLDING AS PER PLANS. PIPE SCAFFOLDING SHALL COMPLY WITH CHAPTER #33 OF THE 2022 CODE. NO CHANGE IN USE, EGRESS OR OCCUPANCY UNDER THIS APPLICATION.
M00835688-I1
08/16/2023
Signed off — Alteration
PIPE SCAFFOLDING INSTALLED PER PLANS, NO CHANGE IN USE, EGRESS OR OCCUPANCY
M00548254-I1
08/02/2023
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
07/27/2023
Signed off — Alteration
REMOVAL OF STALL PARTITIONS AT 5TH FL RESTROOM, INSTALL OF NEW TOILET, INSTALL NEW FULL-HEIGHT STALL PARTITIONS, RELOCATE OF LIGHTING FIXTURE AND ASSOCIATED PATCHING AND REPAIR OF FINISHES. NO CHANGE TO USE EGRESS NOR OCCUPANCY
M00837073-I1
07/27/2023
Signed off — Alteration
MECHANICAL WORK ASSOCIATED WITH INTERIOR RENOVATION AS PER PLANS FILED HEREWITH.
M00841786-I1
07/25/2023
Inspection — Certified Water and Sanitary-WS-Fixtures-Finish
Certified
View inspection ↗
07/25/2023
Inspection — Pass-Final CND-Occupancy Inspection
Pass
View inspection ↗
07/12/2023
Inspection — Certified Remove/Cap - work done in accordance with code
Certified
View inspection ↗
07/10/2023
Permit issued — Mechanical Systems
M00841786-I1-MS
07/05/2023
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Roughing
Certified
View inspection ↗
06/26/2023
Permit issued — Plumbing
M00841813-I1-PL
06/21/2023
Filed — Alteration
PIPE SCAFFOLDING INSTALLED PER PLANS, NO CHANGE IN USE, EGRESS OR OCCUPANCY
M00548254-P1
06/13/2023
Permit issued — General Construction
M00837143-I1-GC
06/12/2023
Objection resolved — Addressed
06/12/2023
Objection resolved — Addressed
06/12/2023
Objection resolved — Addressed
06/12/2023
Objection resolved — Addressed
06/12/2023
Objection resolved — Addressed
06/02/2023
Permit issued — Supported Scaffold
M00548254-I1-SF
05/12/2023
Violation issued (FDNY_NOV, closed)
05/02/2023
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
04/28/2023
Permit issued — General Construction
M00837073-I1-GC
04/11/2023
Objection raised — Scope
Latest 60 of 140 events.
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWGeneral ConstructionSigned-offAdler Windows07/01/2024
DOB NOWGeneral ConstructionSigned-offAdler Windows02/01/2024
DOB NOWGeneral ConstructionPermit IssuedTaurino Management01/02/2024
DOB NOWGeneral ConstructionSigned-offAdler Windows12/26/2023
DOB NOWGeneral ConstructionSigned-offAdler Windows11/08/2023
DOB NOWMechanical SystemsSigned-offTaurino Management07/10/2023
DOB NOWPlumbingSigned-offAccess Plumbing06/26/2023
DOB NOWGeneral ConstructionPermit IssuedTaurino Management06/13/2023
DOB NOWSupported ScaffoldSigned-offSpring Scaffolding06/02/2023
DOB NOWGeneral ConstructionSigned-offTaurino Management04/28/2023
DOB NOWSupported ScaffoldSigned-offPlatinum Services NY03/09/2023
DOB NOWSupported ScaffoldSigned-offSpring Scaffolding06/03/2022
DOB NOWSupported ScaffoldSigned-offSpring Scaffolding06/28/2021
DOB NOWSupported ScaffoldPermit IssuedSkyline Restoration07/16/2020
BISEQISSUEDPlatinum Services NY03/10/2026
BISEQISSUEDPlatinum Services NY03/14/2025
BISEQISSUEDPlatinum Services NY03/14/2024
BISOTISSUEDSkyline Restoration02/19/2024
BISEQISSUEDPlatinum Services NY03/02/2023
BISOTISSUEDSkyline Restoration02/16/2023
BISEQISSUEDPlatinum Services NY03/01/2022
BISOTISSUEDSkyline Restoration02/18/2022
BISEQISSUEDRock Group NY03/03/2021
BISEQISSUEDRock Group NY03/02/2021
BISOTISSUEDSkyline Restoration03/01/2021
BISEQISSUEDRock Group NY03/10/2020
BISOTISSUEDSkyline Restoration02/28/2020
BISEQISSUEDRock Group NY02/27/2020
BISOTISSUEDSkyline Restoration06/20/2019
BISEQISSUEDRock Group NY03/27/2019
BISEQISSUEDRock Group NY03/22/2019
BISEQISSUEDRock Group NY03/27/2018
BISEQISSUEDRock Group NY01/18/2018
BISOTISSUEDSato Construction Co01/05/2018
BISMHISSUEDQuadrant Development10/12/2017
BIS—ISSUEDWesterman Construction Co08/02/2017
BISMHISSUEDWesterman Construction Co07/21/2017
BISOTISSUEDWesterman Construction Co07/21/2017
BISSPISSUEDTristate Plumbing Services07/13/2017
BISPLISSUEDTristate Plumbing Services07/13/2017
+ 24 more permits on file
5 projects · most recent 06/20/2024
General Wiring
FiledStatusContractorScope
06/20/2024CompleteJte Electrical Services—
12/26/2023Permit IssuedIlluminous ElectricGeneral Wiring
05/25/2023CompleteEmpire State ElectlGeneral Wiring
07/29/2020CompleteEnnell Group ElectricGeneral Wiring
02/08/2019Permit IssuedNee ElectricalGeneral Wiring
1 project · most recent 07/15/2020
Scaffold
FiledStatusContractorScope
07/15/2020Permit IssuedSkyline RestorationScaffold
▾Field Inspections (DOB CAP) — 5
DateTypeResultReport
03/18/2025Pass-Final CND-Occupancy InspectionPassView ↗
07/25/2023Certified Water and Sanitary-WS-Fixtures-FinishCertifiedView ↗
07/25/2023Pass-Final CND-Occupancy InspectionPassView ↗
07/12/2023Certified Remove/Cap - work done in accordance with codeCertifiedView ↗
07/05/2023Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
▾Special Inspection Requirements (DOB NOW) — 6
DateRequirementInspectorRole
03/09/2023Fire-Resistant Penetrations and JointsRICHARD GREENWALDspecial
03/09/2023Post-installed AnchorsRICHARD GREENWALDspecial
03/09/2023Mechanical SystemsRICHARD GREENWALDspecial
03/09/2023Post-installed AnchorsRICHARD GREENWALDspecial
03/09/2023FinalRICHARD GREENWALDprogress
03/01/2023Finalmarta sandersprogress
▾Tenants in the building
TenantSpaceFloorsRenovation projects
Bnai JeshurunReligiousEntire building
Project M00841786 Alteration · LOC Issued · 03/21/2023
Project M00841813 Alteration · LOC Issued · 03/21/2023
Project M00837073 Alteration · LOC Issued · 03/06/2023
Project M00837143 Alteration CO · Permit Entire · 03/06/2023
Project M00800578 Alteration · LOC Issued · 12/27/2022
Names are taken automatically from the text of each project’s filed documents (title blocks and cover sheets) and screened to exclude owners, landlords and designers. They may be incomplete or wrong; check the filing.
▾Documents — 394 on file (BIS + DOB NOW)
▸Plans & Drawings10
▸DOB NOWPlans/Sketch9
09/03/2026M00548254-P1Request digital key ↗
09/03/2026M00548254-I1Request digital key ↗
09/01/2026M00800578-P1Request digital key ↗
Showing 3 of 9 on file for this type
▸DOB NOWPlans/Sketch - Supported Scaffold1
09/04/2026M00366813-I1Request digital key ↗
▸Applications & Permits88
▸BISPLAN / WORK APPROVAL APPLICATION46
06/21/2023122885039Open ↗
04/25/2023122885039Open ↗
08/05/2021140591321Open ↗
Showing 3 of 46 on file for this type
▸BISWORK PERMIT APPLICATION28
03/17/2025140591321Open ↗
03/14/2024140591321Open ↗
03/02/2023140591321Open ↗
Showing 3 of 28 on file for this type
▸DOB NOWLPC Approval/Permit6
08/13/2026M00841786-I1Open ↗
08/13/2026M00841813-I1Open ↗
08/13/2026M00800578-I1Open ↗
Showing 3 of 6 on file for this type
▸BISPLACE OF ASSEMBLY4
07/19/2017122922258Open ↗
06/26/2017122922258Open ↗
06/23/2017122922258Open ↗
Showing 3 of 4 on file for this type
▸BISCERTIFICATE OF OCCUPANCY: APPLICATION1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸BISPLACE OF ASSEMBLY SIGN OFF1
07/19/2017122922258Open ↗
▸BISPLACE OF ASSEMBLY APPLICATION1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸BISPLAN - WORK & PERMITS - SUPPPORTING DOCUMENTATION1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸Seals & Professional Certifications69
▸BISTECHNICAL REPORT: RESPONSIBILITY/CERTIFICATION32
12/19/2019123068651Open ↗
12/19/2019123068651Open ↗
07/24/2019123898158Open ↗
Showing 3 of 32 on file for this type
▸BISPROFESSIONAL CERTIFICATION STATEMENT10
07/17/2019123898158Open ↗
06/28/2019123898158Open ↗
08/18/2017123351023Open ↗
Showing 3 of 10 on file for this type
▸DOB NOWDPL-1: Design Professional Seal & Signature10
09/03/2026M00548254-P1Open ↗
09/03/2026M00548254-I1Open ↗
09/01/2026M00800578-I1Open ↗
Showing 3 of 10 on file for this type
▸BISPROFESSIONAL CERTIFIED CHECKLIST7
06/28/2019123898158Open ↗
08/18/2017123351023Open ↗
Showing 2 of 7 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature4
08/22/2026M00841786-I1Open ↗
08/22/2026M00841786-I1Open ↗
08/22/2026M00841813-I1Open ↗
Showing 3 of 4 on file for this type
▸BISTECHNICAL REPORT STATEMENT OF RESPONSIBILITY2
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 2 on file for this type
▸BISREQUIRED ITEMS CHECKLIST FOR PROFESSIONAL CERTIFICATION2
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 2 on file for this type
▸DOB NOWProgress Inspector Seal & Signature2
08/25/2026M00837073-I1Open ↗
08/22/2026M00841786-I1Open ↗
▸Trade Schedules & Equipment14
▸BISSCHEDULE B - PLUMBING/SPRINKLER/STANDPIPE7
08/18/2017123351023Open ↗
Showing 1 of 7 on file for this type
▸BISEQUIPMENT USE APPLICATION/PERMIT2
10/12/2018123351023Open ↗
10/12/2018123351023Open ↗
▸BISSELF-CERT PLUMBING NOTICE2
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 2 on file for this type
▸BISFA - FDNY APPROVAL : FD-FAA2
08/15/2018123054960Open ↗
Showing 1 of 2 on file for this type
▸BISEQUIPMENT USE PERMITS1
10/12/2018123351023Open ↗
▸Safety & Tenant Protection4
▸BISSTREET TREE CHECKLIST1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸BISTenant Protection Plan and Notes1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸DOB NOWParks Department Acknowledgment Letter for Street Trees Plan1
08/13/2026M00837143-I1Open ↗
▸DOB NOWStreet Tree Checklist1
08/31/2026M00837143-I1Open ↗
▸Environmental & Asbestos15
▸BISASBESTOS: CERTIFICATION (DEP ACP5)9
01/22/2019123068651Open ↗
08/18/2017123351023Open ↗
07/05/2017122875497Open ↗
Showing 3 of 9 on file for this type
▸DOB NOWDEP ACP-5: Asbestos Assessment Report4
08/31/2026M00837143-I1Open ↗
08/14/2026M00837073-I1Open ↗
08/13/2026M00841786-I1Open ↗
Showing 3 of 4 on file for this type
▸BISASBESTOS: COMPLETION OR CLOSEOUT (ACP20/21/5)1
01/24/2019123068651Open ↗
▸DOB NOWDEP ACP-20/ACP-21: Asbestos Project Conditional Completion Form/Asbestos Project Completion Form1
08/15/2026M00800578-I1Open ↗
▸Energy Compliance7
▸BISTECHNICAL REPORT: ENERGY CODE PROGRESS INSPS5
07/24/2019123898158Open ↗
06/28/2019123898158Open ↗
06/20/2017121961485Open ↗
Showing 3 of 5 on file for this type
▸BISAS-BUILT ENERGY ANALYSIS2
05/11/2020123898158Open ↗
06/20/2017121961485Open ↗
▸Inspections & Test Reports5
▸BISTECHNICAL REPORT: RESPONSIBILITY5
05/10/2023122885039Open ↗
05/11/2020123898158Open ↗
05/11/2020123898158Open ↗
Showing 3 of 5 on file for this type
▸Approvals, Objections & Sign-offs79
▸BISCERTIFICATE OF OCCUPANCY/LOC: REQUEST28
02/22/2021121185868Open ↗
05/14/2020123898158Open ↗
05/11/2020123898158Open ↗
Showing 3 of 28 on file for this type
▸BISLANDMARKS APPROVAL12
03/21/2025122885039Open ↗
12/16/2019123898158Open ↗
01/24/2019123068651Open ↗
Showing 3 of 12 on file for this type
▸BISLETTERS - SUPPORTING DOCUMENTATION10
03/14/2024140591321Open ↗
03/02/2023140591321Open ↗
03/02/2022140591321Open ↗
Showing 3 of 10 on file for this type
▸BISSCHEDULE A - OCCUPANCY / USE10
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 10 on file for this type
▸BISSHED LETTER8
03/14/2024140591321Open ↗
03/02/2023140591321Open ↗
03/02/2022140591321Open ↗
Showing 3 of 8 on file for this type
▸DOB NOWFee Exempt Supporting Document - DOF ACRIS report or BIB letter7
08/31/2026M00837143-I1Open ↗
08/13/2026M00800578-I1Open ↗
08/13/2026M00837073-I1Open ↗
Showing 3 of 7 on file for this type
▸BISSUPERSEDING LETTER3
03/17/2025140591321Open ↗
06/20/2019122885039Open ↗
08/10/2017121185868Open ↗
▸BISCONSTRUCTION CODE DETERMINATION1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸Cost, Insurance & Ownership22
▸BISCOST AFFIDAVIT21
04/25/2023122885039Open ↗
05/11/2020123898158Open ↗
06/28/2019123898158Open ↗
Showing 3 of 21 on file for this type
▸BISDEPT OF FINANCE VERIFICATION1
05/08/2019121185868Open ↗
▸Filing & Intake Forms59
▸BISBOROUGH INTAKE FORM27
03/17/2025140591321Open ↗
05/01/2020121185868Open ↗
01/27/2020121185868Open ↗
Showing 3 of 27 on file for this type
▸BISADDITIONAL INFORMATION19
03/21/2025122885039Open ↗
05/11/2023122885039Open ↗
08/05/2021140591321Open ↗
Showing 3 of 19 on file for this type
▸BISEFILING COVER SHEET11
06/28/2019123898158Open ↗
08/18/2017123351023Open ↗
07/26/2017123332321Open ↗
Showing 3 of 11 on file for this type
▸BISEFILING JOB APPLICATION COVER SHEET2
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 2 on file for this type
▸Other Documents22
▸BISEXTERNAL FORMS - SUPPORTING DOCUMENTATION12
06/28/2019123898158Open ↗
07/26/2017123332321Open ↗
07/19/2017122922258Open ↗
Showing 3 of 12 on file for this type
▸DOB NOWProof of Historic Building6
08/13/2026M00841813-I1Open ↗
08/13/2026M00837143-I1Open ↗
08/13/2026M00800578-I1Open ↗
Showing 3 of 6 on file for this type
▸BISSEPTIC - SUPPORTING DOCUMENTATION1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸BISPlot Diagram1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸BISUnknown1
12/19/2019123068651Open ↗
▸DOB NOWProperty Ownership Certification1
08/31/2026M00837143-I1Open ↗