Elevator apt, fireproof with stores
2700 ATLANTIC AVENUE
BROOKLYN · BIN 3326746
💬 Discuss this project
2023Year Built
14Stories
D6Building Class
M1-4/R8AZoning
244,506 sfGross Floor Area
234Units
LL97 CoveredRent Stabilized3 Open Violations ▸FDNY Report ↗
Elevator apt, fireproof with stores · Owner of record: 2700 ATLANTIC GROUND LESSOR LLC · 10,460 sf lot · 23.38 FAR built · Flood zone X
Locations of Work
ArchitectureStructuralMechanicalPlumbingFire ProtectionEquipmentCivil
Roof8p · 5 filings · 20 docs
Bulkhead1p · 1 filing · 12 docs
Floor 143p · 4 filings · 20 docs
Floor 133p · 4 filings · 20 docs
Floor 122p · 4 filings · 20 docs
Floor 113p · 5 filings · 20 docs
Floor 102p · 3 filings · 20 docs
Floor 92p · 3 filings · 20 docs
Floor 83p · 4 filings · 20 docs
Floor 73p · 4 filings · 20 docs
Floor 65p · 3 filings · 20 docs
Floor 53p · 3 filings · 20 docs
Floor 44p · 3 filings · 20 docs
Floor 35p · 4 filings · 20 docs
Floor 23p · 5 filings · 20 docs
Floor 16p · 5 filings · 20 docs
Cellar5p · 4 filings · 20 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
SMART CONSULTING NY703/22/2026
OWNERS REP403/22/2026
RELIABLE DEVELOPERS2703/22/2026
REMODELING INC BH103/22/2026
ALL STAR I LLC403/22/2026
OWNER OF 2700 ATLANTIC103/22/2026
2700 ATLANTIC1203/22/2026
▾Sales History (ACRIS)
DatePriceUnitSeller → Buyer$/sf
09/01/2021$17.0M—— → —— not available
▾Design Consultants (Architect / Engineer of Record)
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
SUNSHINE PLAZA LLC1903/21/2026
GREEN STUDIO203/21/2026
SYNERGY BUILDING CONSULTANTS1103/21/2026
HOWARD I SHAPIRO ASSOCIATES203/21/2026
AE DESIGN SOLUTION403/21/2026
SIERRA SAFETY CORP203/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
RELIABLE DEVELOPERS LLCGeneral Contractor3607/08/2026
PRECISION HOIST & SCAFFO*General Contractor2207/08/2026
SUNSHINE CONSTR USA INCGeneral Contractor1107/08/2026
SUCCESS DEVELOPERS LLCGeneral Contractor1007/08/2026
BH REMODELING INCGeneral Contractor907/08/2026
TRISTATE FIRE SPRINK INCFire Protection707/08/2026
CORE SCAFFOLD SYSTEMS INC.General Contractor303/21/2026
PRIME STRUCTURE INCGeneral Contractor303/21/2026
PRIME PIPING & HEATING INPlumbing207/08/2026
HIVOLTS ELECTRICAL INC 004090General Contractor203/22/2026
MANHATTAN D ENTERPRISESGeneral Contractor107/08/2026
PETER PIZZIMENTIElectrical103/21/2026
POWER DIRECT ELECTRIC INCElectrical103/22/2026
TOVIA WERZBERGERElectrical103/21/2026
NASH ELECTRIC SERVICES INElectrical103/22/2026
POWER DIRECT ELECTRIC INC 005103General Contractor103/22/2026
CREATIVE PLUMBING INPlumbing107/08/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
BIG APPLE GROUP NY A RMA91681810/09/2024
TOHFAZ UDDIN P.E.2001809/07/2023
Building Lifecycle
All (299)Filed (37)Permit Issued (56)Signed Off (20)Violation (60)Inspection (13)Objection (80)Special Inspection (30)Tax Incentive (3)
01/01/2027
421-a(16) construction completed
08/21/2025
Signed off — Alteration
Sprinkler and Standpipe filed in conjunction with NB #340765602
B00801992-I1
08/21/2025
Signed off — Alteration
Standpipe application filed in conjunction with NB#340765602
B00653424-I1
02/11/2025
Violation issued (ECB, closed)
Construction
12/02/2024
Inspection — Pass-Final SD - Fire Pump
Pass
View inspection ↗
11/21/2024
Signed off — Alteration
Fuel Oil Storage Work type filed in conjunction with NB #340765602
B00800171-I1
11/19/2024
Inspection — Pass-Final Boiler Equipment Inspection
Pass
View inspection ↗
11/13/2024
Objection resolved — Addressed
11/12/2024
Signed off — Alteration
Plumbing Work Type filed in conjunction with NB#340765602
B00522529-I1
11/11/2024
Signed off — Alteration
filing for engineered enclosure system in accordance with 3309.17
B00904135-I1
10/23/2024
Objection raised — Other
10/18/2024
Signed off — Alteration
B00115774-I1
10/17/2024
Signed off — Alteration
Structural work type filed in conjunction with NB #340765602
B00522548-I1
10/17/2024
Signed off — Alteration
Mechanical work type filed in conjunction with NB#340765602
B00522538-I1
10/09/2024
Filed — Alteration
Sprinkler and Standpipe filed in conjunction with NB #340765602
B00801992-P2
10/08/2024
Special inspection requirement — Post-installed Anchors
SOORJBALLY HARILALL
10/08/2024
Special inspection requirement — Fire-Resistant Penetrations and Joints
SOORJBALLY HARILALL
10/08/2024
Special inspection requirement — Sprinkler Systems
SOORJBALLY HARILALL
10/08/2024
Special inspection requirement — Standpipe Systems
SOORJBALLY HARILALL
10/01/2024
Signed off — Alteration
Curb cut filed in conjunction with NB #340765602
B00996256-I1
10/01/2024
Inspection — Pass-Final SD - Fire Pump
Pass
View inspection ↗
09/26/2024
Inspection — Pass-Final Curb Cut Non-Directive 14
Pass
View inspection ↗
09/25/2024
Permit issued — Standpipe
B00653424-I1-EW-SD
09/24/2024
Signed off — Alteration
Foundation and Earthwork filed in conjunction with NB#340765602
B00649988-I1
09/23/2024
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
09/23/2024
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
09/20/2024
Inspection — Pass-Final SD - Up to 9 Requested Floors
Pass
View inspection ↗
09/20/2024
Inspection — Pass-Final SP - Up to 3 Requested Floors
Pass
View inspection ↗
09/10/2024
Inspection — Pass-Final SD - More than 10 Requested Floors
Pass
View inspection ↗
09/10/2024
Inspection — Pass-Final SP - More than 10 Requested Floors
Pass
View inspection ↗
09/06/2024
Permit issued — Boiler Equipment
B00800171-I1-BE
09/03/2024
Inspection — Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic Test
Certified
View inspection ↗
09/03/2024
Inspection — Certified StandPipe-SD-Piping-Hydrostatic Test
Certified
View inspection ↗
08/21/2024
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
08/20/2024
421-a(16) registration filed
08/15/2024
Objection resolved — Addressed
08/06/2024
Special inspection requirement — HVAC-R and service water piping design and insulation
Soorjbally Harilall
08/06/2024
Special inspection requirement — HVAC-R and service water heating equipment
Soorjbally Harilall
08/06/2024
Special inspection requirement — HVAC-R and service water heating system controls
Soorjbally Harilall
08/06/2024
Special inspection requirement — Fire-Resistant Penetrations and Joints
SOORJBALLY HARILALL
08/06/2024
Special inspection requirement — Maintenance information
Soorjbally Harilall
08/06/2024
Special inspection requirement — Energy Code Compliance Inspections
Soorjbally Harilall
08/05/2024
Objection raised — Admin
07/31/2024
Filed — Alteration
Mechanical work type filed in conjunction with NB#340765602
B00522538-P1
07/31/2024
Special inspection requirement — Final
07/29/2024
Filed — Alteration
Plumbing Work Type filed in conjunction with NB#340765602
B00522529-P3
07/25/2024
Filed — Alteration
Sprinkler and Standpipe filed in conjunction with NB #340765602
B00801992-P1
07/25/2024
Special inspection requirement — HVAC-R and service water heating equipment
Soorjbally Harilall
07/25/2024
Special inspection requirement — HVAC-R and service water piping design and insulation
Soorjbally Harilall
07/25/2024
Special inspection requirement — Maintenance information
Soorjbally Harilall
07/25/2024
Special inspection requirement — Energy Code Compliance Inspections
Soorjbally Harilall
07/25/2024
Special inspection requirement — Fire-Resistant Penetrations and Joints
SOORJBALLY HARILALL
07/25/2024
Special inspection requirement — HVAC-R and service water heating system controls
Soorjbally Harilall
07/24/2024
Special inspection requirement — Sprinkler Systems
SOORJBALLY HARILALL
07/24/2024
Special inspection requirement — Standpipe Systems
SOORJBALLY HARILALL
07/24/2024
Special inspection requirement — Fire-Resistant Penetrations and Joints
SOORJBALLY HARILALL
07/24/2024
Special inspection requirement — Post-installed Anchors
SOORJBALLY HARILALL
07/11/2024
Violation issued (ECB, closed)
Unknown
07/03/2024
Signed off — Alteration
Installation of temporary Alimak 650 32/39 7,100# dual hoists filed in conjunction with NB Application # 340765602 per plan submitted. Work shall comply with 2022 building codes chapter 33. No change in use, egress and/or occupancy with this application.
B00808381-I1
06/19/2024
Signed off — Alteration
SOE and Earthwork filed in conjunction with NB# 340765602
B00649978-I1
Latest 60 of 299 events.
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWStandpipeSigned-offTRISTATE FIRE SPRINK INC09/25/2024
DOB NOWBoiler EquipmentSigned-offJACK PICCINI, INC09/06/2024
DOB NOWSprinklersSigned-offTRISTATE FIRE SPRINK INC06/18/2024
DOB NOWStandpipeSigned-offTRISTATE FIRE SPRINK INC06/18/2024
DOB NOWCurb CutSigned-offSUCCESS DEVELOPERS LLC03/07/2024
DOB NOWProtection and Mechanical MethodsSigned-offPRECISION HOIST & SCAFFO*01/11/2024
DOB NOWProtection and Mechanical MethodsSigned-offPRECISION HOIST & SCAFFO*01/11/2024
DOB NOWMechanical SystemsSigned-offSUCCESS DEVELOPERS LLC01/11/2024
DOB NOWSupported ScaffoldSigned-offPRECISION HOIST & SCAFFO*01/11/2024
DOB NOWProtection and Mechanical MethodsSigned-offPRECISION HOIST & SCAFFO*01/10/2024
DOB NOWPlumbingSigned-offPRIME PIPING & HEATING IN12/22/2023
DOB NOWSidewalk ShedSigned-offPRECISION HOIST & SCAFFO*12/07/2023
DOB NOWFoundationSigned-offRELIABLE DEVELOPERS LLC12/06/2023
DOB NOWStructuralSigned-offRELIABLE DEVELOPERS LLC12/06/2023
DOB NOWSupport of ExcavationSigned-offRELIABLE DEVELOPERS LLC12/05/2023
DOB NOWConstruction FenceSigned-offRELIABLE DEVELOPERS LLC12/05/2023
DOB NOWProtection and Mechanical MethodsSigned-offRELIABLE DEVELOPERS LLC12/05/2023
DOB NOWProtection and Mechanical MethodsSigned-offRELIABLE DEVELOPERS LLC08/28/2023
DOB NOWStandpipeSigned-offTRISTATE FIRE SPRINK INC08/23/2023
DOB NOWSprinklersSigned-offTRISTATE FIRE SPRINK INC06/21/2023
DOB NOWSprinklersSigned-offTRISTATE FIRE SPRINK INC06/21/2023
DOB NOWProtection and Mechanical MethodsSigned-offPRIME STRUCTURE INC05/04/2023
DOB NOWConstruction FenceSigned-offRELIABLE DEVELOPERS LLC04/03/2023
DOB NOWSupported ScaffoldSigned-offPRECISION HOIST & SCAFFO*01/27/2023
DOB NOWProtection and Mechanical MethodsSigned-offPRECISION HOIST & SCAFFO*01/27/2023
DOB NOWProtection and Mechanical MethodsSigned-offPRECISION HOIST & SCAFFO*01/25/2023
DOB NOWFoundationSigned-offRELIABLE DEVELOPERS LLC01/25/2023
DOB NOWProtection and Mechanical MethodsSigned-offPRECISION HOIST & SCAFFO*01/18/2023
DOB NOWStructuralSigned-offRELIABLE DEVELOPERS LLC01/12/2023
DOB NOWSupport of ExcavationSigned-offRELIABLE DEVELOPERS LLC01/09/2023
DOB NOWConstruction FenceSigned-offRELIABLE DEVELOPERS LLC01/09/2023
DOB NOWStructuralSigned-offSUCCESS DEVELOPERS LLC01/06/2023
DOB NOWConstruction FenceSigned-offSUCCESS DEVELOPERS LLC01/06/2023
DOB NOWSidewalk ShedSigned-offPRECISION HOIST & SCAFFO*12/28/2022
DOB NOWPlumbingSigned-offPRIME PIPING & HEATING IN12/20/2022
DOB NOWSupport of ExcavationSigned-offRELIABLE DEVELOPERS LLC12/08/2022
DOB NOWStructuralSigned-offRELIABLE DEVELOPERS LLC11/15/2022
DOB NOWSupport of ExcavationSigned-offRELIABLE DEVELOPERS LLC09/08/2022
DOB NOWPlumbingSigned-offAB PLUMBING INC08/31/2022
DOB NOWConstruction FenceSigned-offRELIABLE DEVELOPERS LLC08/15/2022
+ 19 more permits on file
8 projects · most recent 04/09/2025
General Wiring
FiledStatusContractorScope
04/09/2025CompletePOWER DIRECT ELECTRIC INC—
02/11/2025CancelledPOWER DIRECT ELECTRIC INC—
05/30/2024CompleteHIVOLTS ELECTRICAL INCGeneral Wiring
02/07/2023CompleteHIVOLTS ELECTRICAL INC1 meters, 1 new_meters
01/08/2023CompleteNASH ELECTRIC SERVICES IN—
12/16/2022CompleteNASH ELECTRIC SERVICES IN—
07/23/2022CompleteSOLAS ELECTRICAL CORP—
11/25/2021CompletePOWER DIRECT ELECTRIC INC1 meters, 1 new_meters
▾Field Inspections (DOB CAP) — 13
DateTypeResultReport
12/02/2024Pass-Final SD - Fire PumpPassView ↗
11/19/2024Pass-Final Boiler Equipment InspectionPassView ↗
10/01/2024Pass-Final SD - Fire PumpPassView ↗
09/26/2024Pass-Final Curb Cut Non-Directive 14PassView ↗
09/20/2024Pass-Final SD - Up to 9 Requested FloorsPassView ↗
09/20/2024Pass-Final SP - Up to 3 Requested FloorsPassView ↗
09/10/2024Pass-Final SD - More than 10 Requested FloorsPassView ↗
09/10/2024Pass-Final SP - More than 10 Requested FloorsPassView ↗
09/03/2024Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic TestCertifiedView ↗
09/03/2024Certified StandPipe-SD-Piping-Hydrostatic TestCertifiedView ↗
07/18/2023Certified StandPipe - SD - Hydrostatic 63/09 Test (Initial 75 Feet)CertifiedView ↗
11/01/2022Pass-Final PL - UndergroundPassView ↗
10/26/2022Pass-Final PL - UndergroundPassView ↗
▾Special Inspection Requirements (DOB NOW) — 78
DateRequirementInspectorRole
10/08/2024Sprinkler SystemsSOORJBALLY HARILALLspecial
10/08/2024Post-installed AnchorsSOORJBALLY HARILALLspecial
10/08/2024Fire-Resistant Penetrations and JointsSOORJBALLY HARILALLspecial
10/08/2024Standpipe SystemsSOORJBALLY HARILALLspecial
08/06/2024Maintenance informationSoorjbally Harilallenergy_progress
08/06/2024Energy Code Compliance InspectionsSoorjbally Harilallprogress
08/06/2024Fire-Resistant Penetrations and JointsSOORJBALLY HARILALLspecial
08/06/2024HVAC-R and service water piping design and insulationSoorjbally Harilallenergy_progress
08/06/2024HVAC-R and service water heating system controlsSoorjbally Harilallenergy_progress
08/06/2024HVAC-R and service water heating equipmentSoorjbally Harilallenergy_progress
07/31/2024Final—progress
07/25/2024Energy Code Compliance InspectionsSoorjbally Harilallprogress
07/25/2024HVAC-R and service water heating equipmentSoorjbally Harilallenergy_progress
07/25/2024HVAC-R and service water piping design and insulationSoorjbally Harilallenergy_progress
07/25/2024Maintenance informationSoorjbally Harilallenergy_progress
07/25/2024Fire-Resistant Penetrations and JointsSOORJBALLY HARILALLspecial
07/25/2024HVAC-R and service water heating system controlsSoorjbally Harilallenergy_progress
07/24/2024Standpipe SystemsSOORJBALLY HARILALLspecial
07/24/2024Sprinkler SystemsSOORJBALLY HARILALLspecial
07/24/2024Post-installed AnchorsSOORJBALLY HARILALLspecial
07/24/2024Fire-Resistant Penetrations and JointsSOORJBALLY HARILALLspecial
05/20/2024Fire-Resistant Penetrations and Joints—special
05/20/2024Heating SystemsSOORJBALLY HARILALLspecial
05/20/2024Mechanical SystemsSOORJBALLY HARILALLspecial
05/20/2024Fire-Resistance Rated Construction—progress
Latest 25 of 78.
▾Documents — 325 on file (BIS + DOB NOW)
▸Plans & Drawings38
▸DOB NOWPlans/Sketch37
09/01/2026B00567421-I1Request digital key ↗
09/01/2026B00573810-I1Request digital key ↗
08/30/2026B00649978-I1Request digital key ↗
Showing 3 of 37 on file for this type
▸DOB NOWPlans/Sketch - Construction Fence1
09/02/2026B00115774-I1Request digital key ↗
▸Applications & Permits46
▸BISPLAN / WORK APPROVAL APPLICATION38
05/06/2025340765602Open ↗
04/24/2025340765602Open ↗
02/05/2025340765602Open ↗
Showing 3 of 38 on file for this type
▸BISWORK PERMIT APPLICATION4
01/16/2025340765602Open ↗
05/10/2023340765602Open ↗
11/04/2021321805089Open ↗
Showing 3 of 4 on file for this type
▸BISBPP-5 - Authorization to the Department of Transportation2
01/22/2024340908361Open ↗
04/07/2021340792057Open ↗
▸BISCertificate Of Occupancy Application1
01/17/2024340765602Open ↗
▸BISHpd Permit Notice1
05/02/2023340765602Open ↗
▸Zoning, Tax Lot & Property Records10
▸BISZONING DIAGRAM3
08/09/2024340765602Open ↗
11/14/2022340765602Open ↗
05/16/2022340765602Open ↗
▸BISVERIFY TAX LOT1
09/18/2023340765602Open ↗
▸BISADDRESS: NEW HOUSE NUMBER APPROVED1
05/17/2022340765602Open ↗
▸BISCO OBJ: VERIFY ADDRESS-TOPO STAMP1
11/26/2024340765602Open ↗
▸BISZoning Exhibit Iii Desc Amp Ownrshp Stmnt1
05/17/2022340765602Open ↗
▸BISZoning Exhibit Ii Certification1
08/09/2024340765602Open ↗
▸BISTax Lot Tentative Lot Number Issued1
05/07/2021340765602Open ↗
▸BISZoning Exhibit I Certification1
05/17/2022340765602Open ↗
▸Seals & Professional Certifications88
▸DOB NOWDPL-1: Design Professional Seal & Signature38
09/02/2026B00115774-I1Open ↗
09/01/2026B00573810-I1Open ↗
08/29/2026B00775509-P1Open ↗
Showing 3 of 38 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature32
09/23/2026B00800171-I1Open ↗
09/23/2026B00800171-I1Open ↗
09/02/2026B00522548-I1Open ↗
Showing 3 of 32 on file for this type
▸DOB NOWProgress Inspector Seal & Signature13
09/02/2026B00522548-I1Open ↗
09/01/2026B00522538-P1Open ↗
09/01/2026B00522538-P1Open ↗
Showing 3 of 13 on file for this type
▸BISAPPLICANT OWNER SIGNATURE3
01/22/2024340908361Open ↗
04/07/2021340792057Open ↗
09/18/2020340765602Open ↗
▸BISTECHNICAL REPORT STATEMENT OF RESPONSIBILITY2
01/22/2024340908361Open ↗
04/07/2021340792057Open ↗
▸Trade Schedules & Equipment2
▸BISDep Stormwater Sewer Certification Hcp Scp1
11/07/2022340765602Open ↗
▸BISFa Fdny Approval Fd Faa1
11/06/2024340765602Open ↗
▸Safety & Tenant Protection14
▸BISSTREET TREE CHECKLIST4
02/14/2024340908361Open ↗
04/29/2021340765602Open ↗
04/07/2021340792057Open ↗
Showing 3 of 4 on file for this type
▸BISSTREET TREES: RECEIPT OF STREET TREES SITE PLAN2
12/06/2022340792057Open ↗
05/17/2022340765602Open ↗
▸BISBPP: STREET TREES SITE PLAN2
01/22/2024340908361Open ↗
04/07/2021340792057Open ↗
▸BISDEMOLITION SUBMITTAL CERTIFICATION FORM2
07/21/2021321805089Open ↗
07/21/2021321805089Open ↗
▸BISSTREET TREE SIGNOFF1
06/25/2025340765602Open ↗
▸BISANTI-HARASSMENT CHECKLIST1
07/21/2021321805089Open ↗
▸BISSTREET TREES SITE PLAN1
09/11/2024340765602Open ↗
▸BISSite Safety Plan Best Approval Required1
12/06/2022340765602Open ↗
▸Environmental & Asbestos25
▸DOB NOWOER: Notice to Proceed12
08/13/2026B00522529-P1Open ↗
08/13/2026B00522529-P3Open ↗
08/13/2026B00522529-P2Open ↗
Showing 3 of 12 on file for this type
▸DOB NOWOER: Notice of Satisfaction7
08/13/2026B00522529-I1Open ↗
08/13/2026B00800171-I1Open ↗
08/13/2026B00522548-I1Open ↗
Showing 3 of 7 on file for this type
▸BISENVIRONMENTAL RESTRICTIONS - OER NOTICE TO PROCEED3
02/13/2024340908361Open ↗
04/07/2021340792057Open ↗
03/31/2022340765602Open ↗
▸BISEnvironmental Restrictions Oer Notice Of Satisfaction1
09/12/2024340765602Open ↗
▸BISASBESTOS: CERTIFICATION (DEP ACP5)1
07/21/2021321805089Open ↗
▸BISRODENT CONTROL1
11/04/2021321805089Open ↗
▸Energy Compliance9
▸BISTechnical Report Energy Code Responsibility4
11/06/2024340765602Open ↗
10/07/2024340765602Open ↗
12/06/2022340765602Open ↗
Showing 3 of 4 on file for this type
▸DOB NOWEN2: As Built Energy Analysis.2
08/13/2026B00522538-I1Open ↗
08/13/2026B00522529-I1Open ↗
▸BISAs Built Energy Analysis En21
10/07/2024340765602Open ↗
▸BISPreliminary Commissioning Report Certification1
09/12/2024340765602Open ↗
▸BISTr8 Energy Code Progress Insps Technical Report1
05/19/2022340765602Open ↗
▸Inspections & Test Reports20
▸BISTechnical Report Responsibility5
11/26/2024340765602Open ↗
11/06/2024340765602Open ↗
10/07/2024340765602Open ↗
Showing 3 of 5 on file for this type
▸BISTECHNICAL REPORT: CONCRETE DESIGN MIX3
05/10/2023340765602Open ↗
05/10/2023340765602Open ↗
05/10/2023340765602Open ↗
▸BISDemolition Dm Job Signoff2
05/09/2023340765602Open ↗
12/06/2022340765602Open ↗
▸BISTECHNICAL REPORT: CONCRETE/TEST CYLINDER2
11/26/2024340765602Open ↗
05/10/2023340765602Open ↗
▸DOB NOWSOIL REPORT2
08/13/2026B00649988-I1Open ↗
08/13/2026B00649988-P1Open ↗
▸BISSOIL REPORT1
09/18/2020340765602Open ↗
▸BISTR2: CONCRETE FIELD TESTING TECHNICAL REPORT1
05/09/2023340765602Open ↗
▸BISSUBSURFACE / SOILS INVESTIGATION (BORINGS/TEST PITS)1
11/07/2022340765602Open ↗
▸BISTR3: CONCRETE DESIGN MIX TECHNICAL REPORT1
05/09/2023340765602Open ↗
▸DOB NOWTR4 Test Report and Plot Diagram1
08/13/2026B00649988-I1Open ↗
▸DOB NOWTR4 Plot Diagram1
08/13/2026B00649988-I1Open ↗
▸Approvals, Objections & Sign-offs27
▸BISSCHEDULE A - OCCUPANCY / USE23
05/06/2025340765602Open ↗
04/24/2025340765602Open ↗
10/03/2024340765602Open ↗
Showing 3 of 23 on file for this type
▸BISLETTERS - SUPPORTING DOCUMENTATION3
11/04/2021321805089Open ↗
07/21/2021321805089Open ↗
07/21/2021321805089Open ↗
▸BISHpd Inclusionary Housing Letter1
04/04/2022340765602Open ↗
▸Cost, Insurance & Ownership5
▸BISPROJECT-SPECIFIC GL INSURANCE3
05/10/2023340765602Open ↗
11/04/2021321805089Open ↗
07/21/2021321805089Open ↗
▸BISAcord 25 (Acord Certificate of Liability Insurance)2
11/04/2021321805089Open ↗
07/21/2021321805089Open ↗
▸Filing & Intake Forms25
▸BISADDITIONAL INFORMATION17
03/28/2025340765602Open ↗
11/27/2024340765602Open ↗
10/15/2024340765602Open ↗
Showing 3 of 17 on file for this type
▸BISBOROUGH INTAKE FORM3
11/04/2021321805089Open ↗
11/04/2021321805089Open ↗
07/21/2021321805089Open ↗
▸BISEFILING JOB APPLICATION COVER SHEET3
02/13/2024340908361Open ↗
04/07/2021340792057Open ↗
09/18/2020340765602Open ↗
▸BISBPP: CHECKLIST IN LIEU OF PLANS-ALT31
02/13/2024340908361Open ↗
▸BISEFILING COVER SHEET1
08/14/2018321805089Open ↗
▸Other Documents12
▸BISEXTERNAL FORMS - SUPPORTING DOCUMENTATION5
08/09/2024340765602Open ↗
08/09/2024340765602Open ↗
05/19/2022340765602Open ↗
Showing 3 of 5 on file for this type
▸DOB NOWAdjoining Owners Notification2
08/13/2026B00649988-I1Open ↗
08/13/2026B00649978-I1Open ↗
▸BISDetector Smoke Cert Of Installation1
01/18/2024340765602Open ↗
▸BISBPP - SUPPORTING DOCUMENTATION1
01/22/2024340908361Open ↗
▸BISPLOT DIAGRAM1
09/21/2020340765602Open ↗
▸BISSustainable Roof Zone Form1
09/18/2020340765602Open ↗
▸BISSite Survey Of Vacant Lot Required1
11/07/2022340765602Open ↗