← Back
Public elementary, junior or senior high
P.S. 399 Stanley Eugene Clark
2701 ALBEMARLE ROAD · BIN 3117396
💬 Discuss this project
1981Year Built
3Stories
W1Building Class
R6Zoning
39,680 sfGross Floor Area
0Units
LL97 Covered21 Open Violations 10 unresolved · 11 paperwork only ▸FDNY Report ↗
Public elementary, junior or senior high · Owner of record: NYC DEPARTMENT OF EDUCATION · 24,620 sf lot · 1.61 FAR built · Flood zone X
Locations of Work
ArchitectureStructuralMechanicalPlumbingEquipment
Permit Issued — active, not yet Signed-off
RoofUnder Construction29p · 3 filings · 20 docs
Floor 3Under Construction21p · 2 filings · 20 docs
Floor 2Under Construction22p · 2 filings · 20 docs
Floor 1Under Construction20p · 2 filings · 20 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
NYC SCHOOL CONSTRUCTION AUTHORITY3909/15/2026
NYC DEPARTMENT OF EDUCATION103/22/2026
DEPT OF EDUCATION P.S. 3503/22/2026
DEPT OF EDUCATION PS 230/803/22/2026
DOE PS 230 040203/22/2026
DEPARTMENT OF EDUCATION903/22/2026
DOE K399 PS 230 040203/22/2026
DEPARTMENT OF EDUCATION 0303/22/2026
DOE K 399 040103/22/2026
DOE P.S.230603/22/2026
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
RAJNIKANT DOSHI205/23/2024
AME SERVICES INC301/26/2024
STEPHEN B JACOBS GROUP203/08/2023
KERI ENGINEERING, P.C.109/20/2022
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
AME SERVICES603/21/2026
STEPHEN B JACOBS GROUP403/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
FAITH CONSTRUCTION INCGeneral Contractor1907/08/2026
EVERLAST SCAFFOLDING INCGeneral Contractor1007/08/2026
CENTRAL MECHANICAL SYSTEMS INCGeneral Contractor309/15/2026
VARSITY PLBG AND HTG INCPlumbing207/08/2026
FRANCIS RICHARDSElectrical103/21/2026
GIOVANNI DITURIElectrical103/21/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
TWIN PEAKS INC.317605/23/2024
Building Lifecycle
All (110)Filed (8)Permit Issued (29)Violation (60)Inspection (1)Objection (12)
09/14/2026
Permit issued — Mechanical Systems
B08001612-I1-MS
04/22/2026
Violation issued (ECB, open)
Construction
04/22/2026
Violation issued (ECB, open)
Construction
04/22/2026
Violation issued (ECB, open)
Construction
03/27/2026
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Roughing
Certified
View inspection ↗
03/16/2026
Permit issued — Structural
B08001612-S1-ST
03/16/2026
Permit issued — General Construction
B00835241-I1-GC
03/16/2026
Permit issued — Construction Fence
B00953481-I1-FN
03/16/2026
Permit issued — General Construction
B00835241-I1-GC
03/16/2026
Permit issued — Construction Fence
B00953481-I1-FN
03/16/2026
Permit issued — General Construction
B08001612-I1-GC
03/16/2026
Permit issued — Structural
B08001612-S1-ST
02/13/2026
Permit issued — Sidewalk Shed
B00953504-I1-SH
02/02/2026
Permit issued — Supported Scaffold
B00953499-I1-SF
01/30/2026
Permit issued — Sidewalk Shed
B00953504-I1-SH
01/30/2026
Permit issued — Supported Scaffold
B00953499-I1-SF
12/22/2025
Permit issued — Plumbing
B00835241-S1-PL
11/14/2025
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
10/27/2025
Violation issued (FDNY_ORDER, closed)
06/03/2025
Permit issued — General Construction
B08001612-I1-MS
05/22/2025
Violation issued (ECB, open)
Construction
05/01/2025
Permit issued — General Construction
B00835241-I1-GC
04/18/2025
Violation issued (ECB, closed)
Construction
04/01/2025
Permit issued — General Construction
B08001612-I1-GC
04/01/2025
Permit issued — Structural
B08001612-S1-ST
03/14/2025
Permit issued — Construction Fence
B00953481-I1-FN
03/10/2025
Permit issued — Construction Fence
B00953481-I1-FN
01/29/2025
Permit issued — Supported Scaffold
B00953499-I1-SF
01/29/2025
Permit issued — Sidewalk Shed
B00953504-I1-SH
12/24/2024
Permit issued — Plumbing
B00835241-S1-PL
11/06/2024
Violation issued (FDNY_ORDER, closed)
11/06/2024
Violation issued (FDNY_ORDER, closed)
05/31/2024
Permit issued — General Construction
B00835241-I1-GC
05/30/2024
Permit issued — General Construction
B08001612-I1-MS
05/28/2024
Permit issued — Structural
B08001612-S1-ST
05/23/2024
Filed — Alteration
Provide new structural steel dunnage on the roof for new mechanical equipment
B08001612-P1
04/08/2024
Permit issued — Mechanical Systems
B08001612-I1-GC
04/05/2024
Permit issued — Sidewalk Shed
B00953504-I1-SH
03/26/2024
Violation issued (ECB, open)
Construction
03/26/2024
Violation issued (ECB, open)
Construction
03/07/2024
Permit issued — Construction Fence
B00953481-I1-FN
02/22/2024
Permit issued — Supported Scaffold
B00953499-I1-SF
02/09/2024
Objection resolved — Addressed
02/09/2024
Objection resolved — Addressed
02/01/2024
Objection raised — Other
02/01/2024
Objection raised — Other
01/26/2024
Filed — Alteration
B00953499-I1
01/26/2024
Filed — Alteration
Filing for the installation of construction fence on behalf of contractor
B00953481-I1
01/26/2024
Filed — Alteration
Filing for the installation of sidewalk shed on behalf of contractor
B00953504-I1
06/30/2023
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
05/03/2023
Objection resolved — Addressed
05/03/2023
Objection resolved — Addressed
03/22/2023
Violation issued (ECB, open)
Construction
03/22/2023
Violation issued (ECB, open)
Construction
03/14/2023
Objection raised — Other
03/14/2023
Objection raised — Other
03/08/2023
Filed — Alteration
REMOVE AND REPLACE ROOFING AT ROOF A & B, REPAIR CRACKED MASONRY & FINISHES. REPLACE BULKHEAD DOOR AND FRRAME. REPLACE WIINDOWS, PROVIDE NEW GUARDS AT 1ST FL. REPAIR INTERIOR FINISHES.
B00835241-S1
03/07/2023
Filed — Alteration
REMOVE AND REPLACE ROOFING AT ROOF A & B, REPAIR CRACKED MASONRY & FINISHES. REPLACE BULKHEAD DOOR AND FRRAME. REPLACE WIINDOWS, PROVIDE NEW GUARDS AT 1ST FL. REPAIR INTERIOR FINISHES.
B00835241-I1
01/04/2023
Objection raised — Other
01/04/2023
Objection resolved — Addressed
Latest 60 of 110 events.
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWMechanical SystemsPermit IssuedCENTRAL MECHANICAL SYSTEMS INC09/14/2026
DOB NOWStructuralPermit IssuedFAITH CONSTRUCTION INC03/16/2026
DOB NOWGeneral ConstructionPermit IssuedFAITH CONSTRUCTION INC03/16/2026
DOB NOWConstruction FencePermit IssuedFAITH CONSTRUCTION INC03/16/2026
DOB NOWGeneral ConstructionPermit IssuedFAITH CONSTRUCTION INC03/16/2026
DOB NOWConstruction FencePermit IssuedFAITH CONSTRUCTION INC03/16/2026
DOB NOWGeneral ConstructionPermit IssuedFAITH CONSTRUCTION INC03/16/2026
DOB NOWStructuralPermit IssuedFAITH CONSTRUCTION INC03/16/2026
DOB NOWSidewalk ShedPermit IssuedEVERLAST SCAFFOLDING02/13/2026
DOB NOWSupported ScaffoldPermit IssuedEVERLAST SCAFFOLDING02/02/2026
DOB NOWSidewalk ShedPermit IssuedEVERLAST SCAFFOLDING01/30/2026
DOB NOWSupported ScaffoldPermit IssuedEVERLAST SCAFFOLDING01/30/2026
DOB NOWPlumbingPermit IssuedVARSITY PLBG AND HTG INC12/22/2025
DOB NOWGeneral ConstructionPermit IssuedCENTRAL MECHANICAL SYSTEM06/03/2025
DOB NOWGeneral ConstructionPermit IssuedFAITH CONSTRUCTION INC05/01/2025
DOB NOWGeneral ConstructionPermit IssuedFAITH CONSTRUCTION INC04/01/2025
DOB NOWStructuralPermit IssuedFAITH CONSTRUCTION INC04/01/2025
DOB NOWConstruction FencePermit IssuedFAITH CONSTRUCTION INC03/14/2025
DOB NOWConstruction FencePermit IssuedFAITH CONSTRUCTION INC03/10/2025
DOB NOWSupported ScaffoldPermit IssuedEVERLAST SCAFFOLDING01/29/2025
DOB NOWSidewalk ShedPermit IssuedEVERLAST SCAFFOLDING01/29/2025
DOB NOWPlumbingPermit IssuedVARSITY PLBG AND HTG INC12/24/2024
DOB NOWGeneral ConstructionPermit IssuedFAITH CONSTRUCTION INC05/31/2024
DOB NOWGeneral ConstructionPermit IssuedCENTRAL MECHANICAL SYSTEM05/30/2024
DOB NOWStructuralPermit IssuedFAITH CONSTRUCTION INC05/28/2024
DOB NOWMechanical SystemsPermit IssuedFAITH CONSTRUCTION INC04/08/2024
DOB NOWSidewalk ShedPermit IssuedEVERLAST SCAFFOLDING04/05/2024
DOB NOWConstruction FencePermit IssuedFAITH CONSTRUCTION INC03/07/2024
DOB NOWSupported ScaffoldPermit IssuedEVERLAST SCAFFOLDING02/22/2024
BISPLISSUEDV. C. VITANZA SONS INC07/03/2023
BISOTISSUEDKORDUN CONSTRUCTION CORP11/29/2022
BISOTISSUEDKORDUN CONSTRUCTION CORP11/29/2022
BISPLISSUEDV. C. VITANZA SONS INC07/13/2022
BISOTISSUEDKORDUN CONSTRUCTION CORP11/19/2021
BISOTISSUEDKORDUN CONSTRUCTION CORP11/19/2021
BISOTISSUEDKORDUN CONSTRUCTION CORP11/19/2021
BISPLISSUEDV. C. VITANZA SONS INC06/30/2021
BISEQISSUEDKORDUN CONSTRUCTION CORP01/05/2021
BISOTISSUEDKORDUN CONSTRUCTION CORP11/25/2020
BISOTISSUEDKORDUN CONSTRUCTION CORP11/25/2020
+ 21 more permits on file
1 project · most recent 05/23/2024
Heating and Air Conditioning Systems Ventilation Systems
FiledStatusContractorScopeMake / Model / Capacity
05/23/2024Permit IssuedCENTRAL MECHANICAL SYSTEMHeating and Air Conditioning Systems, Ventilation Systems
Heat / Cool
Johnson Controls GVA1K2B5FA2A60AC202BG2AFG2F5H2AJAN2001A000KD0002 7,800 CFM · Rooftop Unit ×1
GVA1K2B5FA2A60AC222BF2AEG2F3H2AJAN20001A000LD0002 7,300 CFM · Rooftop Unit ×1
GVB1K2B5FA2A60AD222BG2AFG2F3H2AJBN20001A000KE0002 8,600 CFM · Rooftop Unit ×1
GVB1K4B5FA2A60AC224EF2ABG2F3H0AJBN20001A010MD0002 8,050 CFM · Rooftop Unit ×1
Ventilation
Loren Cook ACE-B 1,045 CFM · Exhaust Fan ×1
PRN118EC E4 770 CFM · Exhaust Fan ×1
PRN135EC G4 1,300 CFM · Exhaust Fan ×1
PV180DEC L4 3,475 CFM · Exhaust Fan ×1
1 project · most recent 03/08/2023
Storm
FiledStatusContractorScope
03/08/2023Permit IssuedVARSITY PLBG AND HTG INCStorm
10 projects · most recent 07/23/2026
General Wiring Lighting
FiledStatusContractorScope
07/23/2026Permit IssuedURBAN ELECTRICAL CORPGeneral Wiring
04/15/2024CompleteLUNA NYC ELECTRIC CORPGeneral Wiring
04/09/2024Permit IssuedMILAD CONTRACTING CORP.General Wiring, Lighting
04/05/2024Permit IssuedSTANCO SYSTEM ELEC'L CONT—
08/29/2022CompleteCHARAN ELEC'L ENTERP'S IN—
01/08/2020CompleteCHARAN ELEC'L ENTERP'S INGeneral Wiring
09/17/2019CompleteFALCON ELEC'L CONTR'G COR—
09/17/2019CompleteFALCON ELEC'L CONTR'G CORGeneral Wiring
09/17/2019CompleteFALCON ELEC'L CONTR'G COR—
12/28/2017Permit IssuedMILAD CONTRACTING CORP.—
1 project · most recent 05/23/2024
Steel Concrete
FiledStatusContractorScope
05/23/2024Permit IssuedCENTRAL MECHANICAL SYSTEMSteel, Concrete
2 projects · most recent 01/26/2024
Sidewalk Shed Fence
FiledStatusContractorScope
01/26/2024Permit IssuedEVERLAST SCAFFOLDING INCSidewalk Shed
01/26/2024Permit IssuedFAITH CONSTRUCTION INCFence
▾Field Inspections (DOB CAP) — 1
DateTypeResultReport
03/27/2026Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
▾Special Inspection Requirements (DOB NOW) — 29
DateRequirementInspectorRole
05/23/2024Construction Operations Influencing Adjacent StructuresMIKHAIL ZEYGMANspecial
05/23/2024FinalMIKHAIL ZEYGMANprogress
05/23/2024Structural Steel - DetailsMIKHAIL ZEYGMANspecial
05/23/2024Structural Steel - High Strength BoltingMIKHAIL ZEYGMANspecial
05/23/2024Structural Stability – Alterations of existing buildingsMIKHAIL ZEYGMANspecial
05/23/2024Structural Steel - WeldingMIKHAIL ZEYGMANspecial
05/22/2024FinalMIKHAIL ZEYGMANprogress
05/22/2024Structural Steel - High Strength BoltingMIKHAIL ZEYGMANspecial
05/22/2024Structural Steel - WeldingMIKHAIL ZEYGMANspecial
05/22/2024Construction Operations Influencing Adjacent StructuresMIKHAIL ZEYGMANspecial
05/22/2024Structural Stability – Alterations of existing buildingsMIKHAIL ZEYGMANspecial
05/22/2024Structural Steel - DetailsMIKHAIL ZEYGMANspecial
04/20/2023Structural Stability – Alterations of existing buildingsMIKHAIL ZEYGMANspecial
03/30/2023MasonryMIKHAIL ZEYGMANspecial
03/21/2023Energy Code Compliance InspectionsMIKHAIL ZEYGMANprogress
02/27/2023Fenestration air leakageMIKHAIL ZEYGMANenergy_progress
02/27/2023Air barrier - visual inspectionMIKHAIL ZEYGMANenergy_progress
02/27/2023Insulation placement and R valuesMIKHAIL ZEYGMANenergy_progress
02/27/2023Fenestration and door U-factor and product ratingsMIKHAIL ZEYGMANenergy_progress
12/05/2022Electrical motors and elevatorsMIKHAIL ZEYGMANenergy_progress
09/26/2022HVAC-R and service water heating system controlsMIKHAIL ZEYGMANenergy_progress
09/26/2022HVAC-R and service water heating equipmentMIKHAIL ZEYGMANenergy_progress
09/26/2022Post-installed AnchorsMIKHAIL ZEYGMANspecial
09/26/2022Fire-Resistant Penetrations and JointsMIKHAIL ZEYGMANspecial
09/26/2022HVAC-R and service water piping design and insulationMIKHAIL ZEYGMANenergy_progress
Latest 25 of 29.
▾Documents — 84 on file (BIS + DOB NOW)
▸Plans & Drawings8
▸DOB NOWPlans/Sketch8
08/28/2026B08001612-P1Request digital key ↗
08/26/2026B00953504-I1Request digital key ↗
08/26/2026B00953481-I1Request digital key ↗
Showing 3 of 8 on file for this type
▸Seals & Professional Certifications37
▸DOB NOWSpecial Inspector Seal & Signature15
09/01/2026B08001612-I1Open ↗
09/01/2026B08001612-I1Open ↗
09/01/2026B08001612-I1Open ↗
Showing 3 of 15 on file for this type
▸DOB NOWProgress Inspector Seal & Signature14
09/01/2026B08001612-I1Open ↗
09/01/2026B08001612-I1Open ↗
09/01/2026B08001612-I1Open ↗
Showing 3 of 14 on file for this type
▸DOB NOWDPL-1: Design Professional Seal & Signature8
08/28/2026B08001612-I1Open ↗
08/28/2026B08001612-S1Open ↗
08/28/2026B08001612-P1Open ↗
Showing 3 of 8 on file for this type
▸Trade Schedules & Equipment1
▸BISFA - FDNY APPROVAL : FD-FAA1
05/23/2024302584754Open ↗
▸Safety & Tenant Protection3
▸DOB NOWNYCSCA - Approved Site Safety Plans3
08/13/2026B00953504-I1Open ↗
08/13/2026B00953499-I1Open ↗
08/13/2026B00953481-I1Open ↗
▸Approvals, Objections & Sign-offs27
▸DOB NOWDesign Commission Approval City Owned (Exterior Work)8
08/13/2026B08001612-I1Open ↗
08/13/2026B08001612-P1Open ↗
08/13/2026B08001612-S1Open ↗
Showing 3 of 8 on file for this type
▸DOB NOWFee Exempt Supporting Document - DOF ACRIS report or BIB letter8
08/26/2026B00953499-I1Open ↗
08/13/2026B00953481-I1Open ↗
08/13/2026B00953504-I1Open ↗
Showing 3 of 8 on file for this type
▸DOB NOWDesign Commission Sign Off City Owned (Exterior Work)7
08/13/2026B00835241-S1Open ↗
08/13/2026B08001612-S1Open ↗
08/13/2026B08001612-I1Open ↗
Showing 3 of 7 on file for this type
▸DOB NOWDEP Variance (V5) letter4
08/13/2026B00835241-S1Open ↗
08/13/2026B08001612-I1Open ↗
08/13/2026B08001612-S1Open ↗
Showing 3 of 4 on file for this type
▸Other Documents8
▸DOB NOWNYCSCA - BCC Plan Examination Transmittal8
08/13/2026B08001612-S1Open ↗
08/13/2026B00835241-I1Open ↗
08/13/2026B08001612-I1Open ↗
Showing 3 of 8 on file for this type