← Back
BuildNYC
Elevator cooperative
2701 NEWKIRK AVENUE
BROOKLYN · BIN 3120444
💬 Discuss this project
1959Year Built
6Stories
D4Building Class
R6Zoning
41,400 sfGross Floor Area
51Units
LL97 CoveredRent Stabilized58 Active Violations ▸FISP: SWARMPFDNY Report ↗
Elevator cooperative · Owner of record: 2701 Newkirk Ave Owners · 10,800 sf lot · 3.83 FAR built · Flood zone X
Locations of Work
ArchitectureStructuralElectricalFire ProtectionEquipmentGeneral
Names shown beside floors are taken automatically from the text of filed documents and may be incomplete or wrong.
RoofMaxx Properties1p · 1 filing · 6 docs
Floor 1Installation of heavy duty sidewalk shed4p · 1 filing · 2 docs
CellarMaxx Properties1p · 1 filing · 4 docs
Site & exteriorMaxx Properties12p · 2 filings · 8 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
2701 Newkirk Avenue Owners803/22/2026
Maxx Properties504/09/2026
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
DS Engineering Services109/30/2025
Ashraf109/18/2025
Levin Engineering104/08/2024
Enthink Engineers107/28/2021
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
Levin Engineering203/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
New York UnitedGeneral Contractor104/09/2026
BK Construction ServicesScaffold104/09/2026
New American ConstructionScaffold107/08/2026
Big Apple Fire Sprinkler Co IFire Protection107/08/2026
Canido Basonas ConstructionGeneral Contractor107/11/2012
D & L Plumbing and HeatingPlumbing109/24/1991
Metropolitan Heat & PowerPlumbing105/27/2015
Rockledge ScaffoldGeneral Contractor107/18/2012
Vertex RestorationGeneral Contractor106/03/2003
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
DS Engineering Services1608109/30/2025
Project Tactical Solution5859109/30/2025
Levin Engineering1267104/08/2024
Building Lifecycle
02/20/2027
Facade inspection report due (FISP Cycle 10, sub-cycle A)
The filing window opened 02/21/2025. 1 Cycle 10 filing on record, latest 05/07/2026, status Swarmp
09/06/2026
§ 27-2045(B)(1)(B) HMC, § 12-06, § 12-07, § 12-09 RCNY REPAIR, REPLACE OR PROVIDE AN APPROVED AND OPERATIONAL CARBON MONOXIDE DETECTING DEVICE,…
HPD violation · open
09/06/2026
§ 27-2005 ADM CODE REPAIR THE BROKEN OR DEFECTIVE PLASTERED SURFACES AND PAINT IN A UNIFORM COLOR AT EAST AND SOUTH WALLS IN THE BATHROOM LOCATED…
HPD violation · open
09/06/2026
§ 27-2005 ADM CODE REPAIR THE BROKEN OR DEFECTIVE PLASTERED SURFACES AND PAINT IN A UNIFORM COLOR AT CEILING IN THE BATHROOM LOCATED AT APT 4D, 3rd…
HPD violation · open
09/06/2026
§ 27-2026, 2027 HMC: PROPERLY REPAIR THE SOURCE AND ABATE THE EVIDENCE OF A WATER LEAK AT CEILING IN THE BATHROOM LOCATED AT APT 4D, 3rd STORY, 2nd…
HPD violation · open
169 history events on file for this building. Sign in free to see the full history. Sign in · Create account
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWGeneral ConstructionSigned-offNew York United10/08/2025
DOB NOWSidewalk ShedSigned-offBK Construction Services09/19/2025
DOB NOWSprinklersSigned-offBig Apple Fire Sprinkler Co I07/10/2024
DOB NOWSidewalk ShedSigned-offNew American Construction08/01/2021
BISBLISSUEDMetropolitan HT & Power05/27/2015
BISPLISSUEDMetropolitan Heat & Power05/27/2015
BISEQISSUEDRockledge Scaffold07/18/2012
BISOTISSUEDCanido Basonas Construction07/11/2012
BISOTISSUEDVertex Restoration06/03/2003
BISFSISSUEDManhattan BLR & Equipment/Domini08/17/1998
BISSPISSUEDD & L Plumbing and Heating09/24/1991
BISOTISSUEDArcadia Construction09/10/1991
2 projects · most recent 09/19/2025
FiledStatusContractorScope
09/19/2025CompleteHigh Quality Electric of NYC—
07/30/2021CompleteRichard Neu—
▾Field Inspections (DOB CAP) — 2
DateTypeResultReport
07/26/2024Certified Sprinkler-SP-Fixtures-FinishCertifiedView ↗
07/22/2024Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic TestCertifiedView ↗
▾Special Inspection Requirements (DOB NOW) — 7
DateRequirementInspectorRole
09/24/2025MasonryDaniel Siegelspecial
09/24/2025FinalDaniel Siegelprogress
09/24/2025Tenant Protection Plan ComplianceMax Leespecial
01/22/2024Tenant Protection Plan ComplianceDmitry Levinspecial
12/08/2023Sprinkler SystemsDmitry Levinspecial
12/08/2023Post-installed AnchorsDmitry Levinspecial
12/08/2023Fire-Resistant Penetrations and JointsDmitry Levinspecial
63 filed documents on file for this building. Sign in free to see the full history. Sign in · Create account