← Back
Walk-up apt, over six families with stores
2707 SEDGWICK AVENUE
BRONX · BIN 2015500
💬 Discuss this project
1924Year Built
6Stories
C7Building Class
R6Zoning
68,982 sfGross Floor Area
78Units
LL97 CoveredRent Stabilized198 Open Violations ▸
Walk-up apt, over six families with stores · Owner of record: KINGSBRIDGE GROUP LLC · 14,985 sf lot · 4.6 FAR built · Flood zone X
Locations of Work
MechanicalPlumbing
Floor 612p · 1 filing · 9 docs
Floor 512p · 1 filing · 9 docs
Floor 412p · 1 filing · 9 docs
Floor 312p · 1 filing · 9 docs
Floor 212p · 1 filing · 9 docs
Floor 122p · 2 filings · 20 docs
Cellar4p · 2 filings · 10 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
J G CONSTRUCTION SRVCS407/08/2026
ORENCOGROUP503/22/2026
KINGSBRIDGE GROUP1103/22/2026
HNS CONSTRUCTION203/22/2026
EMERICK GROSS REAL ESTATE LP503/22/2026
OWNER OF 155 ST KINGSBRID103/22/2026
PAYCO LLC103/21/2026
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
SOLE PROPRIETOR803/05/2026
A M ENGINEERING SERVICES PC107/25/2025
NEW YORK ENGINEERING ASSOC., P.C.211/12/2021
HAIDER ENGINEERING, P.E.102/20/2018
▾Filing Representatives (Expediters)
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
ZONE PLUMBING & HEATING CPlumbing306/28/2026
ALPHONSE, MICHAELElectrical203/21/2026
PEREIRA, WESLLEYElectrical203/21/2026
CLIFTON WALDRONElectrical103/21/2026
DREAM TEAM ELEC'L CORPElectrical103/22/2026
JEAN-CLAUDE BELIZAIREElectrical103/21/2026
ABDUL AZIZElectrical103/21/2026
J & G CONSTRUCTION SVCSGeneral Contractor107/08/2026
J. SIBAJA KITCHEN AND VE*General Contractor104/09/2026
OASIS PLOMO CORPGeneral Contractor104/09/2026
CLEAN TECH MECHANICAL INCPlumbing107/08/2026
AZIZ ABDULElectrical103/21/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
PIRO STUDIO LLC7503803/05/2026
AM ENGINEERING SERVICES P7975107/25/2025
NEW YORK ENGINEERING ASSO851111/12/2021
Building Lifecycle
All (115)Filed (12)Permit Issued (6)Signed Off (2)Violation (60)Inspection (3)Objection (8)Special Inspection (24)
08/07/2026
Violation issued (HPD, closed)
C
05/18/2026
Signed off — Alteration
Proposed interior renovation of an existing restaurant, as per drawings, including replacement-in-kind of kitchen equipment, installation of a new ADA-compliant bathroom, walk-in box, and replacement of plumbing fixtures. No change in use, occupancy, or m
X01234079-I1
03/14/2026
Violation issued (HPD, closed)
B
03/14/2026
Violation issued (HPD, closed)
C
03/14/2026
Violation issued (HPD, closed)
C
03/14/2026
Violation issued (HPD, closed)
B
03/14/2026
Violation issued (HPD, closed)
A
03/14/2026
Violation issued (HPD, closed)
A
03/14/2026
Violation issued (HPD, closed)
B
03/14/2026
Violation issued (HPD, closed)
B
03/14/2026
Violation issued (HPD, closed)
C
03/14/2026
Violation issued (HPD, closed)
A
03/14/2026
Violation issued (HPD, closed)
B
03/14/2026
Violation issued (HPD, closed)
B
03/14/2026
Violation issued (HPD, closed)
B
03/14/2026
Violation issued (HPD, closed)
C
03/14/2026
Violation issued (HPD, closed)
C
03/14/2026
Violation issued (HPD, closed)
B
03/06/2026
Special inspection requirement — Fire-Resistant Penetrations and Joints
PIETRO ROSATO
03/06/2026
Special inspection requirement — Energy Code Compliance Inspections
PIETRO ROSATO
03/05/2026
Filed — Alteration
PROPOSED INTERIOR RENOVATION OF AN EXISTING RESTAURANT AS PER DRAWINGS, INCLUDING REPLACEMENT IN KIND OF KITCHEN EQUIPMENT, INSTALLATION OF A NEW ADA BATHROOM, WALK IN BOX, & REPLACEMENT OF PLUMBING FIXTURES. NO CHANGE IN USE, OCCUPANCY OR EGRESS.
X01241731-P6
03/02/2026
Violation issued (HPD, closed)
B
03/02/2026
Violation issued (HPD, closed)
A
03/02/2026
Violation issued (HPD, closed)
C
03/02/2026
Violation issued (HPD, closed)
C
03/02/2026
Violation issued (HPD, closed)
B
02/18/2026
Special inspection requirement — Energy Code Compliance Inspections
PIETRO ROSATO
02/18/2026
Special inspection requirement — Fire-Resistant Penetrations and Joints
PIETRO ROSATO
01/28/2026
Violation issued (HPD, closed)
B
01/28/2026
Violation issued (HPD, closed)
B
01/28/2026
Violation issued (HPD, closed)
B
01/28/2026
Violation issued (HPD, closed)
B
01/28/2026
Violation issued (HPD, closed)
C
01/28/2026
Violation issued (HPD, closed)
A
01/28/2026
Violation issued (HPD, closed)
B
01/28/2026
Violation issued (HPD, closed)
B
01/06/2026
Filed — Alteration
PROPOSED INTERIOR RENOVATION OF AN EXISTING RESTAURANT AS PER DRAWINGS, INCLUDING REPLACEMENT IN KIND OF KITCHEN EQUIPMENT, INSTALLATION OF A NEW ADA BATHROOM, WALK IN BOX, & REPLACEMENT OF PLUMBING FIXTURES. NO CHANGE IN USE, OCCUPANCY OR EGRESS.
X01241731-P5
01/05/2026
Special inspection requirement — Fire-Resistant Penetrations and Joints
PIETRO ROSATO
01/05/2026
Special inspection requirement — Energy Code Compliance Inspections
PIETRO ROSATO
01/03/2026
Violation issued (HPD, closed)
C
01/03/2026
Violation issued (HPD, closed)
B
01/03/2026
Violation issued (HPD, closed)
C
01/03/2026
Violation issued (HPD, closed)
A
01/03/2026
Violation issued (HPD, closed)
C
12/04/2025
Filed — Alteration
PROPOSED INTERIOR RENOVATION OF AN EXISTING RESTAURANT AS PER DRAWINGS, INCLUDING REPLACEMENT IN KIND OF KITCHEN EQUIPMENT, INSTALLATION OF A NEW ADA BATHROOM, WALK IN BOX, & REPLACEMENT OF PLUMBING FIXTURES. NO CHANGE IN USE, OCCUPANCY OR EGRESS.
X01241731-P4
12/04/2025
Special inspection requirement — Fire-Resistant Penetrations and Joints
PIETRO ROSATO
12/04/2025
Special inspection requirement — Energy Code Compliance Inspections
PIETRO ROSATO
11/26/2025
Filed — Alteration
PROPOSED INTERIOR RENOVATION OF AN EXISTING RESTAURANT AS PER DRAWINGS, INCLUDING REPLACEMENT IN KIND OF KITCHEN EQUIPMENT, INSTALLATION OF A NEW ADA BATHROOM, WALK IN BOX, & REPLACEMENT OF PLUMBING FIXTURES. NO CHANGE IN USE, OCCUPANCY OR EGRESS.
X01241731-P3
11/26/2025
Special inspection requirement — Energy Code Compliance Inspections
PIETRO ROSATO
11/26/2025
Special inspection requirement — Fire-Resistant Penetrations and Joints
PIETRO ROSATO
11/07/2025
Filed — Alteration
PROPOSED INTERIOR RENOVATION OF AN EXISTING RESTAURANT AS PER DRAWINGS, INCLUDING REPLACEMENT IN KIND OF KITCHEN EQUIPMENT, INSTALLATION OF A NEW ADA BATHROOM, WALK IN BOX, & REPLACEMENT OF PLUMBING FIXTURES. NO CHANGE IN USE, OCCUPANCY OR EGRESS.
X01241731-P2
11/03/2025
Special inspection requirement — Energy Code Compliance Inspections
PIETRO ROSATO
11/03/2025
Special inspection requirement — Fire-Resistant Penetrations and Joints
PIETRO ROSATO
10/31/2025
Inspection — Pass-Final CND-Occupancy Inspection
Pass
View inspection ↗
10/24/2025
Violation issued (HPD, closed)
A
10/24/2025
Violation issued (HPD, closed)
B
10/24/2025
Violation issued (HPD, closed)
C
10/24/2025
Violation issued (HPD, closed)
B
10/24/2025
Violation issued (HPD, closed)
A
10/24/2025
Violation issued (HPD, closed)
C
Latest 60 of 115 events.
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWMechanical SystemsPermit IssuedJ. SIBAJA KITCHEN AND VE*08/19/2025
DOB NOWPlumbingPermit IssuedZONE PLUMBING & HEATING C07/09/2025
DOB NOWGeneral ConstructionSigned-offOASIS PLOMO CORP06/17/2025
DOB NOWBoiler EquipmentPermit IssuedWASOFF PLBG. & UTL.CO INC01/12/2022
DOB NOWPlumbingPermit IssuedCLEAN TECH MECHANICAL INC01/11/2022
DOB NOWSidewalk ShedSigned-offJ & G CONSTRUCTION SVCS02/21/2018
BISFPISSUEDMASTER FIRE SYSTEMS, INC06/26/2014
BISPLISSUEDCAPE PLUMBING INC02/07/2014
BISFPISSUEDMASTER FIRE SYSTEMS, INC12/11/2013
BISOTISSUEDHNS CONSTRUCTION CORP08/08/2013
BISPLISSUEDORION PLUMBING & HTG CORP07/08/2013
BISMHISSUEDHNS CONSTRUCTION CORP05/13/2013
BISFPISSUEDCITYWIDE FIRE SYS PLBG EN05/19/2011
BISOTISSUEDBCS CONSTRUCT SERV CORP10/07/2010
BISEQISSUEDCOLGATE SCAFFOLDING06/15/2005
BISFBISSUEDPETER AGLIARDO JR12/05/2001
2 projects · most recent 03/05/2026
Gas Water/Sanitary
FiledStatusContractorScope
03/05/2026Permit Issued5 BORO'S PLUMBING INCGas, Water/Sanitary
09/20/2021Permit IssuedCLEAN TECH MECHANICAL INCGas
2 projects · most recent 05/31/2025
General Wiring
FiledStatusContractorScope
05/31/2025Permit IssuedDREAM TEAM ELEC'L CORPGeneral Wiring
02/20/2018Permit IssuedWCK ELECTRIC CORP.—
1 project · most recent 03/05/2026
Tenant Protection Plan 72 Hour
FiledStatusContractorScope
03/05/2026Permit Issued5 BORO'S PLUMBING INCTenant Protection Plan 72 Hour
▾Field Inspections (DOB CAP) — 3
DateTypeResultReport
10/31/2025Pass-Final CND-Occupancy InspectionPassView ↗
09/23/2025Certified Gas-Gas-Piping-RoughingCertifiedView ↗
08/04/2025Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
▾Special Inspection Requirements (DOB NOW) — 24
DateRequirementInspectorRole
03/06/2026Fire-Resistant Penetrations and JointsPIETRO ROSATOspecial
03/06/2026Energy Code Compliance InspectionsPIETRO ROSATOprogress
02/18/2026Energy Code Compliance InspectionsPIETRO ROSATOprogress
02/18/2026Fire-Resistant Penetrations and JointsPIETRO ROSATOspecial
01/05/2026Fire-Resistant Penetrations and JointsPIETRO ROSATOspecial
01/05/2026Energy Code Compliance InspectionsPIETRO ROSATOprogress
12/04/2025Fire-Resistant Penetrations and JointsPIETRO ROSATOspecial
12/04/2025Energy Code Compliance InspectionsPIETRO ROSATOprogress
11/26/2025Energy Code Compliance InspectionsPIETRO ROSATOprogress
11/26/2025Fire-Resistant Penetrations and JointsPIETRO ROSATOspecial
11/03/2025Energy Code Compliance InspectionsPIETRO ROSATOprogress
11/03/2025Fire-Resistant Penetrations and JointsPIETRO ROSATOspecial
09/24/2025Energy Code Compliance InspectionsPIETRO ROSATOprogress
09/24/2025Fire-Resistant Penetrations and JointsPIETRO ROSATOspecial
07/15/2025Tenant Protection Plan ComplianceAlbert Munozspecial
07/14/2025Mechanical SystemsAlbert Munozspecial
07/14/2025FinalAlbert Munozprogress
09/20/2021Heating SystemsLOUIS ARENAspecial
09/14/2021Fuel-Oil Storage and Fuel-Oil Piping SystemsLOUIS ARENAspecial
09/14/2021Energy Code Compliance InspectionsLOUIS ARENAprogress
09/14/2021HVAC-R and service water heating equipmentLOUIS ARENAenergy_progress
09/14/2021HVAC-R and service water heating system controlsLOUIS ARENAenergy_progress
09/14/2021Maintenance informationLOUIS ARENAenergy_progress
02/20/2018FinalJAFAR HAIDERprogress
▾Documents — 130 on file (BIS + DOB NOW)
▸Plans & Drawings13
▸DOB NOWPlans/Sketch13
08/26/2026X00020892-I1Request digital key ↗
08/25/2026X00593642-I1Request digital key ↗
08/19/2026X01234079-I1Request digital key ↗
Showing 3 of 13 on file for this type
▸Applications & Permits18
▸BISPLAN / WORK APPROVAL APPLICATION10
06/26/2014220382958Open ↗
06/10/2014220382958Open ↗
04/14/2014220288356Open ↗
Showing 3 of 10 on file for this type
▸BISWORK PERMIT APPLICATION8
06/30/2014220382958Open ↗
02/10/2014220288356Open ↗
12/12/2013220346114Open ↗
Showing 3 of 8 on file for this type
▸Seals & Professional Certifications47
▸DOB NOWDPL-1: Design Professional Seal & Signature13
08/25/2026X00593578-I1Open ↗
08/25/2026X00593642-I1Open ↗
08/17/2026X01241731-P1Open ↗
Showing 3 of 13 on file for this type
▸DOB NOWProgress Inspector Seal & Signature11
09/29/2026X01241731-I1Open ↗
09/23/2026X00593642-I1Open ↗
09/11/2026X01241731-P4Open ↗
Showing 3 of 11 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature11
09/29/2026X01241731-I1Open ↗
09/23/2026X00593642-I1Open ↗
09/23/2026X00593642-I1Open ↗
Showing 3 of 11 on file for this type
▸BISTECHNICAL REPORT: RESPONSIBILITY/CERTIFICATION6
06/10/2014220382958Open ↗
04/18/2014220288356Open ↗
12/12/2013220346114Open ↗
Showing 3 of 6 on file for this type
▸BISPROFESSIONAL CERTIFIED CHECKLIST3
11/21/2013220346114Open ↗
05/10/2013220288356Open ↗
10/01/2010220085798Open ↗
▸BISPROFESSIONAL CERTIFICATION STATEMENT FORM2
05/10/2013220288356Open ↗
10/01/2010220085798Open ↗
▸BISPROFESSIONAL CERTIFICATION STATEMENT1
11/21/2013220346114Open ↗
▸Trade Schedules & Equipment9
▸BISSCHEDULE B - PLUMBING3
09/17/2013220288356Open ↗
05/10/2013220288356Open ↗
10/01/2010220085798Open ↗
▸BISSELF-CERT PLUMBING NOTICE3
04/25/2014220288356Open ↗
02/05/2014220288356Open ↗
11/01/2013220288356Open ↗
▸BISSCHEDULE B - PLUMBING/SPRINKLER/STANDPIPE2
06/10/2014220382958Open ↗
04/14/2014220288356Open ↗
▸BISFA - FDNY APPROVAL : FD-FAA1
04/25/2014220288356Open ↗
▸Safety & Tenant Protection1
▸BISDEMOLITION SUBMITTAL CERTIFICATION FORM1
06/24/2013220288356Open ↗
▸Environmental & Asbestos16
▸DOB NOWDEP ACP-5: Asbestos Assessment Report12
08/25/2026X00593642-I1Open ↗
08/17/2026X01241731-P6Open ↗
08/17/2026X01241731-P5Open ↗
Showing 3 of 12 on file for this type
▸BISTHIS IS 'NOT AN ASBESTOS PROJECT'2
12/16/2010220097115Open ↗
10/01/2010220085798Open ↗
▸BISASBESTOS: CERTIFICATION (DEP ACP5)2
06/10/2014220382958Open ↗
05/10/2013220288356Open ↗
▸Energy Compliance4
▸BISTECHNICAL REPORT: ENERGY CODE PROGRESS INSPS3
04/18/2014220288356Open ↗
09/17/2013220288356Open ↗
05/10/2013220288356Open ↗
▸BISAS-BUILT ENERGY ANALYSIS1
04/18/2014220288356Open ↗
▸Approvals, Objections & Sign-offs4
▸BISADMINISTRATIVE OBJECTIONS2
12/16/2010220097115Open ↗
10/01/2010220085798Open ↗
▸BISCERTIFICATE OF OCCUPANCY/LOC: REQUEST1
04/18/2014220288356Open ↗
▸BISSUPERSEDING LETTER1
02/10/2014220288356Open ↗
▸Cost, Insurance & Ownership6
▸BISCOST AFFIDAVIT6
06/10/2014220382958Open ↗
11/21/2013220346114Open ↗
06/24/2013220288356Open ↗
Showing 3 of 6 on file for this type
▸Filing & Intake Forms11
▸BISADDITIONAL INFORMATION5
06/25/2014220288356Open ↗
06/10/2014220288356Open ↗
04/14/2014220288356Open ↗
Showing 3 of 5 on file for this type
▸BISEFILING COVER SHEET5
06/10/2014220382958Open ↗
11/21/2013220346114Open ↗
05/10/2013220288356Open ↗
Showing 3 of 5 on file for this type
▸BISeFiling Job Application Cover Sheet1
06/26/2014220382958Open ↗
▸Other Documents1
▸DOB NOWBSA Meeting Minutes/BSA Resolution1
08/13/2026X00020892-I1Open ↗