← Back
BRONX
2702 CRESTON AVENUE
BRONX · Bedford Park · BIN 2131356
💬 Discuss this project
—Year Built
—Stories
—Building Class
—Zoning
—Gross Floor Area
—Units
2 Open Violations ▸
Locations of Work
PlumbingFire Protection
Permit Issued — active, not yet Signed-off
RoofUnder Construction2 filings · 11 docs
Floor 12Under Construction2 filings · 11 docs
Floor 11Under Construction2 filings · 11 docs
Floor 10Under Construction2 filings · 11 docs
Floor 9Under Construction2 filings · 11 docs
Floor 8Under Construction2 filings · 11 docs
Floor 7Under Construction2 filings · 11 docs
Floor 6Under Construction2 filings · 11 docs
Floor 5Under Construction2 filings · 11 docs
Floor 4Under Construction2 filings · 11 docs
Floor 3Under Construction2 filings · 11 docs
Floor 2Under Construction2 filings · 11 docs
Floor 1Under Construction2 filings · 11 docs
Sub-BasementUnder Construction2 filings · 11 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
SPAXEL109/13/2026
PROPCO108/06/2026
▾Design Consultants (Architect / Engineer of Record)
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
SPAXEL BUILDERS LLCGeneral Contractor108/06/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
BIG APPLE GROUP NY A RMA91681105/11/2026
Building Lifecycle
All (110)Filed (23)Permit Issued (30)Signed Off (2)Violation (3)Inspection (14)Objection (8)Special Inspection (30)
09/16/2026
Signed off — Alteration
FILING HEREWITH SITE WORK APPLICATOIN IN ASSOCIATION WITH NB# 220212543 FOR ON-SITE IMPROVEMENTS INCLUDING PROPOSED PAVEMENT AND GRADING UPDATES.
X00572534-I1
08/28/2026
Inspection — Certified Sprinkler-SP-Fixtures-Finish
Certified
View inspection ↗
08/25/2026
Violation issued (ECB, open)
Construction
08/11/2026
Signed off — Alteration
INSTALLATION OF 300 PSF SIDEWALK SHED, WINDOW PROTECTION AND ROOF OF PROTECTION AS PER PLANS. SIDEWALK SHED SHALL COMPLY WITH CHAPTER # 33 OF THE 2014 CODE. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
X00661827-I1
08/05/2026
Permit issued — Construction Fence
X00567886-I1-FN
07/30/2026
Violation issued (ECB, open)
Construction
05/15/2026
Inspection — Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic Test
Certified
View inspection ↗
05/14/2026
Objection resolved — Addressed
05/14/2026
Special inspection requirement — Maintenance information
SOORJBALLY HARILALL
05/14/2026
Special inspection requirement — Final
Soorjbally Harilall
05/14/2026
Special inspection requirement — Mechanical Systems
SOORJBALLY HARILALL
05/14/2026
Special inspection requirement — Lighting controls
SOORJBALLY HARILALL
05/14/2026
Special inspection requirement — HVAC-R and service water piping design and insulation
SOORJBALLY HARILALL
05/14/2026
Special inspection requirement — Shutoff dampers
SOORJBALLY HARILALL
05/14/2026
Special inspection requirement — Duct leakage testing, insulation and design
SOORJBALLY HARILALL
05/14/2026
Special inspection requirement — Energy Code Compliance Inspections
Soorjbally Harilall
05/14/2026
Special inspection requirement — Interior lighting power
SOORJBALLY HARILALL
05/14/2026
Special inspection requirement — Heating Systems
SOORJBALLY HARILALL
05/14/2026
Special inspection requirement — HVAC-R and service water heating system controls
SOORJBALLY HARILALL
05/14/2026
Special inspection requirement — Lighting in dwelling units
SOORJBALLY HARILALL
05/14/2026
Special inspection requirement — HVAC-R and service water heating equipment
SOORJBALLY HARILALL
05/14/2026
Special inspection requirement — Exterior lighting power
SOORJBALLY HARILALL
05/14/2026
Special inspection requirement — Metering
SOORJBALLY HARILALL
05/14/2026
Special inspection requirement — Electrical motors and elevators
SOORJBALLY HARILALL
05/12/2026
Objection raised — Other
05/11/2026
Filed — Alteration
MECHANICAL SPECIFICATIONS IN CONJUNCTION WITH NEW BUILDING 220212543.
X00661034-P2
05/07/2026
Inspection — Certified StandPipe-Fire Pump (SD)-Fire Pump Test
Certified
View inspection ↗
05/07/2026
Inspection — Certified StandPipe-SD-Fixtures-Finish-SD
Certified
View inspection ↗
05/05/2026
Special inspection requirement — HVAC-R and service water heating system controls
SOORJBALLY HARILALL
05/05/2026
Special inspection requirement — HVAC-R and service water piping design and insulation
SOORJBALLY HARILALL
05/05/2026
Special inspection requirement — Duct leakage testing, insulation and design
SOORJBALLY HARILALL
05/05/2026
Special inspection requirement — HVAC-R and service water heating equipment
SOORJBALLY HARILALL
05/05/2026
Special inspection requirement — Maintenance information
SOORJBALLY HARILALL
05/05/2026
Special inspection requirement — Lighting controls
SOORJBALLY HARILALL
05/05/2026
Special inspection requirement — Interior lighting power
SOORJBALLY HARILALL
05/05/2026
Special inspection requirement — Lighting in dwelling units
SOORJBALLY HARILALL
05/05/2026
Special inspection requirement — Mechanical Systems
SOORJBALLY HARILALL
05/05/2026
Special inspection requirement — Energy Code Compliance Inspections
Soorjbally Harilall
05/05/2026
Special inspection requirement — Heating Systems
SOORJBALLY HARILALL
05/05/2026
Special inspection requirement — Final
Soorjbally Harilall
05/05/2026
Special inspection requirement — Exterior lighting power
SOORJBALLY HARILALL
05/05/2026
Special inspection requirement — Shutoff dampers
SOORJBALLY HARILALL
05/04/2026
Inspection — Certified StandPipe-SD-Piping-Hydrostatic Test
Certified
View inspection ↗
05/01/2026
Inspection — Certified Sprinkler-SP-Fixtures-Finish
Certified
View inspection ↗
04/28/2026
Violation issued (ECB, closed)
Construction
04/28/2026
Inspection — Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic Test
Certified
View inspection ↗
04/22/2026
Filed — Alteration
MECHANICAL SPECIFICATIONS IN CONJUNCTION WITH NEW BUILDING 220212543.
X00661034-P1
04/17/2026
Permit issued — Plumbing
X00476258-I1-PL
04/02/2026
Permit issued — Standpipe
X00579813-I1-PL
03/11/2026
Permit issued — Sprinklers
X00579813-I1-PL
01/02/2026
Permit issued — Sidewalk Shed
X01340467-I1-SH
12/29/2025
Filed — Alteration
X01340467-I1
12/23/2025
Filed — Alteration
FIRE PROTECTION SPECIFICATION IN CONJUNCTION WITH NB# 220212543.
X00579813-P1
12/23/2025
Permit issued — Protection and Mechanical Methods
X01133221-I1-PMM
12/22/2025
Permit issued — General Construction
X00572534-I1-GC
12/10/2025
Permit issued — Construction Fence
X00567886-I1-FN
10/09/2025
Filed — Alteration
X01101824-P4
09/16/2025
Filed — Alteration
X01101824-P3
08/13/2025
Permit issued — Supported Scaffold
X01101824-I1-SF
08/05/2025
Permit issued — Plumbing
X00579813-I1-EW-SP
Latest 60 of 110 events.
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWConstruction FencePermit IssuedSPAXEL BUILDERS LLC08/05/2026
DOB NOWPlumbingSigned-offHORBRIDGE PLUMBING & HEATING04/17/2026
DOB NOWStandpipeSigned-offHORBRIDGE PLUMBING & HEAT04/02/2026
DOB NOWSprinklersSigned-offMOHAMED ABDELRAZEK03/11/2026
DOB NOWSidewalk ShedPermit IssuedCLASSIC CONSULTING GROUP01/02/2026
DOB NOWProtection and Mechanical MethodsSigned-offCLASSIC CONSULTING GROUP12/23/2025
DOB NOWGeneral ConstructionSigned-offSPAXEL BUILDERS LLC12/22/2025
DOB NOWConstruction FencePermit IssuedSPAXEL BUILDERS LLC12/10/2025
DOB NOWSupported ScaffoldSigned-offMC SUPERSTRUCTURE INC08/13/2025
DOB NOWPlumbingPermit IssuedFIVE BOROUGH NYC LLC08/05/2025
DOB NOWSprinklersPermit IssuedFIVE BOROUGH NYC LLC08/05/2025
DOB NOWStandpipePermit IssuedFIVE BOROUGH NYC LLC08/05/2025
DOB NOWMechanical SystemsSigned-offSPAXEL BUILDERS LLC07/01/2025
DOB NOWSidewalk ShedPermit IssuedCLASSIC CONSULTING GROUP03/11/2025
DOB NOWGeneral ConstructionSigned-offSPAXEL BUILDERS LLC12/26/2024
DOB NOWProtection and Mechanical MethodsSigned-offCLASSIC CONSULTING GROUP11/26/2024
DOB NOWConstruction FencePermit IssuedSPAXEL BUILDERS LLC11/21/2024
DOB NOWPlumbingSigned-offMOHAMED ABDELRAZEK10/18/2024
DOB NOWSupported ScaffoldSigned-offMC SUPERSTRUCTURE INC09/12/2024
DOB NOWSprinklersPermit IssuedFIVE BOROUGH NYC LLC08/21/2024
DOB NOWStandpipePermit IssuedFIVE BOROUGH NYC LLC08/21/2024
DOB NOWStandpipePermit IssuedFIVE BOROUGH NYC LLC08/21/2024
DOB NOWSidewalk ShedSigned-offCLASSIC CONSULTING GROUP03/15/2024
DOB NOWGeneral ConstructionSigned-offSPAXEL BUILDERS LLC12/20/2023
DOB NOWPlumbingSigned-offINNOVATION PLUMBING LLC12/14/2023
DOB NOWConstruction FencePermit IssuedSPAXEL BUILDERS LLC11/13/2023
DOB NOWPlumbingSigned-offINNOVATION PLUMBING LLC09/21/2023
DOB NOWConstruction FencePermit IssuedSPAXEL BUILDERS LLC11/15/2022
DOB NOWSidewalk ShedSigned-offTRI BOROUGH SCAFFOLDING01/13/2022
DOB NOWConstruction FencePermit IssuedSPAXEL BUILDERS LLC11/16/2021
1 project · most recent 05/11/2026
Heating and Air Conditioning Systems Ventilation Systems
FiledStatusContractorScopeMake / Model / Capacity
05/11/2026Signed-offSPAXEL BUILDERS LLCHeating and Air Conditioning Systems, Ventilation Systems
Heat / Cool
Cooper & Hunter CH-HPR48M-230VO 48,000 BTU · Heat Pump Outdoor ×93
CH-HPR36M-230VO 36,000 BTU · Heat Pump Outdoor ×36
Ventilation
Daikin GOLD FRX (SIZE 070) 129,000 BTU · Erv ×3
REYQ144XBBTJA 144,189 BTU · Vrf Outdoor ×3
1 project · most recent 12/23/2025
FiledStatusContractorScope
12/23/2025Permit IssuedFIVE BOROUGH NYC LLC—
2 projects · most recent 12/23/2025
Storm Water/Sanitary
FiledStatusContractorScope
12/23/2025Signed-offHORBRIDGE PLUMBING & HEATStorm, Water/Sanitary
05/29/2024Signed-offHORBRIDGE PLUMBING & HEATStorm, Water/Sanitary
5 projects · most recent 01/13/2026
General Wiring
FiledStatusContractorScope
01/13/2026Permit IssuedJOSEPH WEINSTEIN ELECTRICGeneral Wiring
10/10/2024Permit IssuedSOLAS ELECTRICAL CORP—
10/09/2024Permit IssuedRICHARD NEUGeneral Wiring
08/28/2024Permit IssuedBRIGHT ELECTRIC CORPGeneral Wiring
03/12/2024Permit IssuedRICHARD NEU—
2 projects · most recent 08/15/2024
Sidewalk Shed
FiledStatusContractorScope
08/15/2024Permit IssuedCLASSIC CONSULTING GROUPSidewalk Shed
01/13/2022Signed-offTRI BOROUGH SCAFFOLDING.&Sidewalk Shed
▾Field Inspections (DOB CAP) — 14
DateTypeResultReport
08/28/2026Certified Sprinkler-SP-Fixtures-FinishCertifiedView ↗
05/15/2026Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic TestCertifiedView ↗
05/07/2026Certified StandPipe-Fire Pump (SD)-Fire Pump TestCertifiedView ↗
05/07/2026Certified StandPipe-SD-Fixtures-Finish-SDCertifiedView ↗
05/04/2026Certified StandPipe-SD-Piping-Hydrostatic TestCertifiedView ↗
05/01/2026Certified Sprinkler-SP-Fixtures-FinishCertifiedView ↗
04/28/2026Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic TestCertifiedView ↗
04/11/2025Pass-Final PL - Up to 3 Requested FloorsPassView ↗
02/28/2025Fail-Final PL - Up to 3 Requested FloorsFailView ↗
11/25/2024Certified StandPipe - SD - Alarm Sys 64/09 - FinishCertifiedView ↗
12/22/2023Certified Storm Drainage-ST-Piping-RoughingCertifiedView ↗
12/22/2023Certified Storm Drainage-ST-Piping-UndergroundCertifiedView ↗
11/28/2023Certified Storm Drainage-ST-Piping-UndergroundCertifiedView ↗
11/28/2023Certified Water and Sanitary-WS-Sanitary Piping-UndergroundCertifiedView ↗
▾Special Inspection Requirements (DOB NOW) — 69
DateRequirementInspectorRole
05/14/2026HVAC-R and service water heating system controlsSOORJBALLY HARILALLenergy_progress
05/14/2026Electrical motors and elevatorsSOORJBALLY HARILALLenergy_progress
05/14/2026Shutoff dampersSOORJBALLY HARILALLenergy_progress
05/14/2026Exterior lighting powerSOORJBALLY HARILALLenergy_progress
05/14/2026HVAC-R and service water heating equipmentSOORJBALLY HARILALLenergy_progress
05/14/2026HVAC-R and service water piping design and insulationSOORJBALLY HARILALLenergy_progress
05/14/2026Lighting in dwelling unitsSOORJBALLY HARILALLenergy_progress
05/14/2026Maintenance informationSOORJBALLY HARILALLenergy_progress
05/14/2026Lighting controlsSOORJBALLY HARILALLenergy_progress
05/14/2026Heating SystemsSOORJBALLY HARILALLspecial
05/14/2026Mechanical SystemsSOORJBALLY HARILALLspecial
05/14/2026Energy Code Compliance InspectionsSoorjbally Harilallprogress
05/14/2026FinalSoorjbally Harilallprogress
05/14/2026Duct leakage testing, insulation and designSOORJBALLY HARILALLenergy_progress
05/14/2026MeteringSOORJBALLY HARILALLenergy_progress
05/14/2026Interior lighting powerSOORJBALLY HARILALLenergy_progress
05/05/2026Heating SystemsSOORJBALLY HARILALLspecial
05/05/2026MeteringSOORJBALLY HARILALLenergy_progress
05/05/2026Electrical motors and elevatorsSOORJBALLY HARILALLenergy_progress
05/05/2026Shutoff dampersSOORJBALLY HARILALLenergy_progress
05/05/2026Lighting controlsSOORJBALLY HARILALLenergy_progress
05/05/2026Duct leakage testing, insulation and designSOORJBALLY HARILALLenergy_progress
05/05/2026HVAC-R and service water heating system controlsSOORJBALLY HARILALLenergy_progress
05/05/2026HVAC-R and service water piping design and insulationSOORJBALLY HARILALLenergy_progress
05/05/2026Maintenance informationSOORJBALLY HARILALLenergy_progress
Latest 25 of 69.
▾Documents — 65 on file (BIS + DOB NOW)
▸Plans & Drawings18
▸DOB NOWPlans/Sketch16
08/25/2026X00567886-I1Request digital key ↗
08/25/2026X00579813-P1Request digital key ↗
08/24/2026X00661827-I1Request digital key ↗
Showing 3 of 16 on file for this type
▸DOB NOWPlans/Sketch - Plumbing2
08/21/2026X00476258-P1Request digital key ↗
08/21/2026X00476258-I1Request digital key ↗
▸Seals & Professional Certifications43
▸DOB NOWDPL-1: Design Professional Seal & Signature19
08/25/2026X00579813-P1Open ↗
08/24/2026X00661827-I1Open ↗
08/21/2026X00476258-P1Open ↗
Showing 3 of 19 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature14
09/02/2026X00579813-P1Open ↗
09/01/2026X00476258-P1Open ↗
09/01/2026X00476258-P1Open ↗
Showing 3 of 14 on file for this type
▸DOB NOWProgress Inspector Seal & Signature10
09/02/2026X00579813-P1Open ↗
09/01/2026X00661034-I1Open ↗
09/01/2026X00661034-I1Open ↗
Showing 3 of 10 on file for this type
▸Inspections & Test Reports4
▸DOB NOWSOIL REPORT3
08/21/2026X00476258-P1Open ↗
08/21/2026X00476258-I1Open ↗
08/21/2026X00572534-I1Open ↗
▸DOB NOWTR4 Test Report and Plot Diagram1
08/21/2026X00476258-I1Open ↗